{"generated_at":"2026-10-15T06:38:04.892032+00:00","license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","attribution":"AI Root Energy (ai-root.com), CC BY 4.0. Underlying public sources: AEMO, NZ Electricity Authority (EMI), Clean Energy Regulator, Clean Energy Council, and named tender/press citations per record.","excluded_sources":["au-energy-timeseries","japan-rei-fleet","openelectricity-emissions","openelectricity-grid"],"excluded_reason":"licensed to AI Root, not for redistribution — OpenElectricity is non-commercial and the AU time-series blends it with paid SunWiz data","count":700,"by_record_type":{"capacity_stat":32,"clearing_house_status":1,"feed_in_tariff":100,"grid_emissions":7,"grid_mix":7,"install_stat":10,"market_stat":12,"metric_series":12,"organisation":100,"product":35,"project":100,"rebate_scheme":13,"signal":100,"tender":100,"unit":71},"records":[{"entity_id":"stat-india-installed-capacity","record_type":"capacity_stat","jurisdiction":"IN","data":{"id":"india-installed-capacity","name":"India installed generating capacity","country":"India","jurisdiction":"IN","as_at":"2026","total_mw":500000.0,"solar_mw":130000.0,"wind_mw":56000.0,"coal_mw":220000.0,"by_class":[],"non_fossil_pct":52.0,"approx":true,"verify_note":"Order-of-magnitude placeholder pending a live CEA crawl — do not quote. confidence=low routes this to the review queue by design.","source":"https://cea.nic.in/installed-capacity-report/?lang=en"},"source_url":"https://cea.nic.in/installed-capacity-report/?lang=en","publisher":"Central Electricity Authority (India)","fetched_at":"2026-09-12T14:23:45.947967+00:00","confidence":"low"},{"entity_id":"stat-jp-fit-capacity-2017-06","record_type":"capacity_stat","jurisdiction":"JP","data":{"id":"jp-fit-capacity-2017-06","name":"Japan FIT/FIP renewable capacity — as at 2017-06","country":"Japan","jurisdiction":"JP","as_at":"2017-06","total_mw":46487.6,"solar_mw":40337.7,"wind_mw":3311.9,"hydro_mw":491.8,"geothermal_mw":15.7,"biomass_mw":2330.5,"offshore_wind_mw":2.0,"approved_mw":86799.2,"built_share_pct":43.3,"by_class":[{"technology":"Solar","mw":40337.7},{"technology":"Wind","mw":3311.9},{"technology":"Biomass","mw":2330.5},{"technology":"Hydro","mw":491.8},{"technology":"Geothermal","mw":15.7}],"approx":false,"verify_note":"FIT/FIP scheme only — excludes large hydro, nuclear and thermal, and holds no storage (the scheme accredits generation). Installed = 新規認定分 + 移行認定分 導入容量; approved = 認定容量 新規認定分, and built_share compares 新規 against 新規 because that is the only like-for-like pair the register offers. Band sums reconcile to the sheet's own 合計. 出典：再生可能エネルギー電子申請サイト (https://www.fit-portal.go.jp/) — reshaped and aggregated by AI Root; not published in this form by the Japanese government.","source":"https://www.fit-portal.go.jp/PublicInfoSummary"},"source_url":"https://www.fit-portal.go.jp/PublicInfoSummary","publisher":"経済産業省 資源エネルギー庁 (METI/ANRE) — 再生可能エネルギー電子申請","fetched_at":"2026-10-11T22:20:39.480622+00:00","confidence":"high"},{"entity_id":"stat-jp-fit-capacity-2018-06","record_type":"capacity_stat","jurisdiction":"JP","data":{"id":"jp-fit-capacity-2018-06","name":"Japan FIT/FIP renewable capacity — as at 2018-06","country":"Japan","jurisdiction":"JP","as_at":"2018-06","total_mw":51897.6,"solar_mw":45351.0,"wind_mw":3591.1,"hydro_mw":545.0,"geothermal_mw":22.6,"biomass_mw":2388.0,"offshore_wind_mw":2.0,"approved_mw":87897.9,"built_share_pct":49.0,"by_class":[{"technology":"Solar","mw":45351.0},{"technology":"Wind","mw":3591.1},{"technology":"Biomass","mw":2388.0},{"technology":"Hydro","mw":545.0},{"technology":"Geothermal","mw":22.6}],"approx":false,"verify_note":"FIT/FIP scheme only — excludes large hydro, nuclear and thermal, and holds no storage (the scheme accredits generation). Installed = 新規認定分 + 移行認定分 導入容量; approved = 認定容量 新規認定分, and built_share compares 新規 against 新規 because that is the only like-for-like pair the register offers. Band sums reconcile to the sheet's own 合計. 出典：再生可能エネルギー電子申請サイト (https://www.fit-portal.go.jp/) — reshaped and aggregated by AI Root; not published in this form by the Japanese government.","source":"https://www.fit-portal.go.jp/PublicInfoSummary"},"source_url":"https://www.fit-portal.go.jp/PublicInfoSummary","publisher":"経済産業省 資源エネルギー庁 (METI/ANRE) — 再生可能エネルギー電子申請","fetched_at":"2026-10-11T22:20:39.480622+00:00","confidence":"high"},{"entity_id":"stat-jp-fit-capacity-2018-12","record_type":"capacity_stat","jurisdiction":"JP","data":{"id":"jp-fit-capacity-2018-12","name":"Japan FIT/FIP renewable capacity — as at 2018-12","country":"Japan","jurisdiction":"JP","as_at":"2018-12","total_mw":54904.7,"solar_mw":48028.7,"wind_mw":3629.0,"hydro_mw":556.9,"geothermal_mw":23.8,"biomass_mw":2666.3,"offshore_wind_mw":2.0,"approved_mw":89765.3,"built_share_pct":51.3,"by_class":[{"technology":"Solar","mw":48028.7},{"technology":"Wind","mw":3629.0},{"technology":"Biomass","mw":2666.3},{"technology":"Hydro","mw":556.9},{"technology":"Geothermal","mw":23.8}],"approx":false,"verify_note":"FIT/FIP scheme only — excludes large hydro, nuclear and thermal, and holds no storage (the scheme accredits generation). Installed = 新規認定分 + 移行認定分 導入容量; approved = 認定容量 新規認定分, and built_share compares 新規 against 新規 because that is the only like-for-like pair the register offers. Band sums reconcile to the sheet's own 合計. 出典：再生可能エネルギー電子申請サイト (https://www.fit-portal.go.jp/) — reshaped and aggregated by AI Root; not published in this form by the Japanese government.","source":"https://www.fit-portal.go.jp/PublicInfoSummary"},"source_url":"https://www.fit-portal.go.jp/PublicInfoSummary","publisher":"経済産業省 資源エネルギー庁 (METI/ANRE) — 再生可能エネルギー電子申請","fetched_at":"2026-10-11T22:20:39.480622+00:00","confidence":"high"},{"entity_id":"stat-jp-fit-capacity-2019-03","record_type":"capacity_stat","jurisdiction":"JP","data":{"id":"jp-fit-capacity-2019-03","name":"Japan FIT/FIP renewable capacity — as at 2019-03","country":"Japan","jurisdiction":"JP","as_at":"2019-03","total_mw":56704.9,"solar_mw":49548.5,"wind_mw":3653.0,"hydro_mw":571.8,"geothermal_mw":31.3,"biomass_mw":2900.3,"offshore_wind_mw":4.4,"approved_mw":95279.2,"built_share_pct":50.2,"by_class":[{"technology":"Solar","mw":49548.5},{"technology":"Wind","mw":3653.0},{"technology":"Biomass","mw":2900.3},{"technology":"Hydro","mw":571.8},{"technology":"Geothermal","mw":31.3}],"approx":false,"verify_note":"FIT/FIP scheme only — excludes large hydro, nuclear and thermal, and holds no storage (the scheme accredits generation). Installed = 新規認定分 + 移行認定分 導入容量; approved = 認定容量 新規認定分, and built_share compares 新規 against 新規 because that is the only like-for-like pair the register offers. Band sums reconcile to the sheet's own 合計. 出典：再生可能エネルギー電子申請サイト (https://www.fit-portal.go.jp/) — reshaped and aggregated by AI Root; not published in this form by the Japanese government.","source":"https://www.fit-portal.go.jp/PublicInfoSummary"},"source_url":"https://www.fit-portal.go.jp/PublicInfoSummary","publisher":"経済産業省 資源エネルギー庁 (METI/ANRE) — 再生可能エネルギー電子申請","fetched_at":"2026-10-11T22:20:39.480622+00:00","confidence":"high"},{"entity_id":"stat-jp-fit-capacity-2019-06","record_type":"capacity_stat","jurisdiction":"JP","data":{"id":"jp-fit-capacity-2019-06","name":"Japan FIT/FIP renewable capacity — as at 2019-06","country":"Japan","jurisdiction":"JP","as_at":"2019-06","total_mw":58325.6,"solar_mw":50664.6,"wind_mw":3766.6,"hydro_mw":666.6,"geothermal_mw":77.5,"biomass_mw":3150.3,"offshore_wind_mw":4.4,"approved_mw":89051.1,"built_share_pct":55.4,"by_class":[{"technology":"Solar","mw":50664.6},{"technology":"Wind","mw":3766.6},{"technology":"Biomass","mw":3150.3},{"technology":"Hydro","mw":666.6},{"technology":"Geothermal","mw":77.5}],"approx":false,"verify_note":"FIT/FIP scheme only — excludes large hydro, nuclear and thermal, and holds no storage (the scheme accredits generation). Installed = 新規認定分 + 移行認定分 導入容量; approved = 認定容量 新規認定分, and built_share compares 新規 against 新規 because that is the only like-for-like pair the register offers. Band sums reconcile to the sheet's own 合計. 出典：再生可能エネルギー電子申請サイト (https://www.fit-portal.go.jp/) — reshaped and aggregated by AI Root; not published in this form by the Japanese government.","source":"https://www.fit-portal.go.jp/PublicInfoSummary"},"source_url":"https://www.fit-portal.go.jp/PublicInfoSummary","publisher":"経済産業省 資源エネルギー庁 (METI/ANRE) — 再生可能エネルギー電子申請","fetched_at":"2026-10-11T22:20:39.480622+00:00","confidence":"high"},{"entity_id":"stat-jp-fit-capacity-2019-09","record_type":"capacity_stat","jurisdiction":"JP","data":{"id":"jp-fit-capacity-2019-09","name":"Japan FIT/FIP renewable capacity — as at 2019-09","country":"Japan","jurisdiction":"JP","as_at":"2019-09","total_mw":59641.9,"solar_mw":51818.6,"wind_mw":3813.2,"hydro_mw":682.1,"geothermal_mw":78.7,"biomass_mw":3249.4,"offshore_wind_mw":4.4,"approved_mw":89182.5,"built_share_pct":56.8,"by_class":[{"technology":"Solar","mw":51818.6},{"technology":"Wind","mw":3813.2},{"technology":"Biomass","mw":3249.4},{"technology":"Hydro","mw":682.1},{"technology":"Geothermal","mw":78.7}],"approx":false,"verify_note":"FIT/FIP scheme only — excludes large hydro, nuclear and thermal, and holds no storage (the scheme accredits generation). Installed = 新規認定分 + 移行認定分 導入容量; approved = 認定容量 新規認定分, and built_share compares 新規 against 新規 because that is the only like-for-like pair the register offers. Band sums reconcile to the sheet's own 合計. 出典：再生可能エネルギー電子申請サイト (https://www.fit-portal.go.jp/) — reshaped and aggregated by AI Root; not published in this form by the Japanese government.","source":"https://www.fit-portal.go.jp/PublicInfoSummary"},"source_url":"https://www.fit-portal.go.jp/PublicInfoSummary","publisher":"経済産業省 資源エネルギー庁 (METI/ANRE) — 再生可能エネルギー電子申請","fetched_at":"2026-10-11T22:20:39.480622+00:00","confidence":"high"},{"entity_id":"stat-jp-fit-capacity-2019-12","record_type":"capacity_stat","jurisdiction":"JP","data":{"id":"jp-fit-capacity-2019-12","name":"Japan FIT/FIP renewable capacity — as at 2019-12","country":"Japan","jurisdiction":"JP","as_at":"2019-12","total_mw":61353.2,"solar_mw":53269.0,"wind_mw":3876.0,"hydro_mw":709.7,"geothermal_mw":78.8,"biomass_mw":3419.7,"offshore_wind_mw":4.4,"approved_mw":89789.5,"built_share_pct":58.3,"by_class":[{"technology":"Solar","mw":53269.0},{"technology":"Wind","mw":3876.0},{"technology":"Biomass","mw":3419.7},{"technology":"Hydro","mw":709.7},{"technology":"Geothermal","mw":78.8}],"approx":false,"verify_note":"FIT/FIP scheme only — excludes large hydro, nuclear and thermal, and holds no storage (the scheme accredits generation). Installed = 新規認定分 + 移行認定分 導入容量; approved = 認定容量 新規認定分, and built_share compares 新規 against 新規 because that is the only like-for-like pair the register offers. Band sums reconcile to the sheet's own 合計. 出典：再生可能エネルギー電子申請サイト (https://www.fit-portal.go.jp/) — reshaped and aggregated by AI Root; not published in this form by the Japanese government.","source":"https://www.fit-portal.go.jp/PublicInfoSummary"},"source_url":"https://www.fit-portal.go.jp/PublicInfoSummary","publisher":"経済産業省 資源エネルギー庁 (METI/ANRE) — 再生可能エネルギー電子申請","fetched_at":"2026-10-11T22:20:39.480622+00:00","confidence":"high"},{"entity_id":"stat-jp-fit-capacity-2020-03","record_type":"capacity_stat","jurisdiction":"JP","data":{"id":"jp-fit-capacity-2020-03","name":"Japan FIT/FIP renewable capacity — as at 2020-03","country":"Japan","jurisdiction":"JP","as_at":"2020-03","total_mw":63608.4,"solar_mw":55192.0,"wind_mw":4111.1,"hydro_mw":721.9,"geothermal_mw":78.8,"biomass_mw":3504.5,"offshore_wind_mw":4.4,"approved_mw":93311.0,"built_share_pct":58.5,"by_class":[{"technology":"Solar","mw":55192.0},{"technology":"Wind","mw":4111.1},{"technology":"Biomass","mw":3504.5},{"technology":"Hydro","mw":721.9},{"technology":"Geothermal","mw":78.8}],"approx":false,"verify_note":"FIT/FIP scheme only — excludes large hydro, nuclear and thermal, and holds no storage (the scheme accredits generation). Installed = 新規認定分 + 移行認定分 導入容量; approved = 認定容量 新規認定分, and built_share compares 新規 against 新規 because that is the only like-for-like pair the register offers. Band sums reconcile to the sheet's own 合計. 出典：再生可能エネルギー電子申請サイト (https://www.fit-portal.go.jp/) — reshaped and aggregated by AI Root; not published in this form by the Japanese government.","source":"https://www.fit-portal.go.jp/PublicInfoSummary"},"source_url":"https://www.fit-portal.go.jp/PublicInfoSummary","publisher":"経済産業省 資源エネルギー庁 (METI/ANRE) — 再生可能エネルギー電子申請","fetched_at":"2026-10-11T22:20:39.480622+00:00","confidence":"high"},{"entity_id":"stat-jp-fit-capacity-2020-06","record_type":"capacity_stat","jurisdiction":"JP","data":{"id":"jp-fit-capacity-2020-06","name":"Japan FIT/FIP renewable capacity — as at 2020-06","country":"Japan","jurisdiction":"JP","as_at":"2020-06","total_mw":65824.8,"solar_mw":56907.4,"wind_mw":4345.4,"hydro_mw":817.0,"geothermal_mw":78.9,"biomass_mw":3676.1,"offshore_wind_mw":4.4,"approved_mw":93060.0,"built_share_pct":61.0,"by_class":[{"technology":"Solar","mw":56907.4},{"technology":"Wind","mw":4345.4},{"technology":"Biomass","mw":3676.1},{"technology":"Hydro","mw":817.0},{"technology":"Geothermal","mw":78.9}],"approx":false,"verify_note":"FIT/FIP scheme only — excludes large hydro, nuclear and thermal, and holds no storage (the scheme accredits generation). Installed = 新規認定分 + 移行認定分 導入容量; approved = 認定容量 新規認定分, and built_share compares 新規 against 新規 because that is the only like-for-like pair the register offers. Band sums reconcile to the sheet's own 合計. 出典：再生可能エネルギー電子申請サイト (https://www.fit-portal.go.jp/) — reshaped and aggregated by AI Root; not published in this form by the Japanese government.","source":"https://www.fit-portal.go.jp/PublicInfoSummary"},"source_url":"https://www.fit-portal.go.jp/PublicInfoSummary","publisher":"経済産業省 資源エネルギー庁 (METI/ANRE) — 再生可能エネルギー電子申請","fetched_at":"2026-10-11T22:20:39.480622+00:00","confidence":"high"},{"entity_id":"stat-jp-fit-capacity-2020-09","record_type":"capacity_stat","jurisdiction":"JP","data":{"id":"jp-fit-capacity-2020-09","name":"Japan FIT/FIP renewable capacity — as at 2020-09","country":"Japan","jurisdiction":"JP","as_at":"2020-09","total_mw":67408.7,"solar_mw":58284.5,"wind_mw":4353.2,"hydro_mw":833.1,"geothermal_mw":79.3,"biomass_mw":3858.6,"offshore_wind_mw":4.4,"approved_mw":93472.3,"built_share_pct":62.3,"by_class":[{"technology":"Solar","mw":58284.5},{"technology":"Wind","mw":4353.2},{"technology":"Biomass","mw":3858.6},{"technology":"Hydro","mw":833.1},{"technology":"Geothermal","mw":79.3}],"approx":false,"verify_note":"FIT/FIP scheme only — excludes large hydro, nuclear and thermal, and holds no storage (the scheme accredits generation). Installed = 新規認定分 + 移行認定分 導入容量; approved = 認定容量 新規認定分, and built_share compares 新規 against 新規 because that is the only like-for-like pair the register offers. Band sums reconcile to the sheet's own 合計. 出典：再生可能エネルギー電子申請サイト (https://www.fit-portal.go.jp/) — reshaped and aggregated by AI Root; not published in this form by the Japanese government.","source":"https://www.fit-portal.go.jp/PublicInfoSummary"},"source_url":"https://www.fit-portal.go.jp/PublicInfoSummary","publisher":"経済産業省 資源エネルギー庁 (METI/ANRE) — 再生可能エネルギー電子申請","fetched_at":"2026-10-11T22:20:39.480622+00:00","confidence":"high"},{"entity_id":"stat-jp-fit-capacity-2020-12","record_type":"capacity_stat","jurisdiction":"JP","data":{"id":"jp-fit-capacity-2020-12","name":"Japan FIT/FIP renewable capacity — as at 2020-12","country":"Japan","jurisdiction":"JP","as_at":"2020-12","total_mw":69337.4,"solar_mw":59841.1,"wind_mw":4475.7,"hydro_mw":902.7,"geothermal_mw":92.3,"biomass_mw":4025.7,"offshore_wind_mw":4.4,"approved_mw":94054.5,"built_share_pct":64.0,"by_class":[{"technology":"Solar","mw":59841.1},{"technology":"Wind","mw":4475.7},{"technology":"Biomass","mw":4025.7},{"technology":"Hydro","mw":902.7},{"technology":"Geothermal","mw":92.3}],"approx":false,"verify_note":"FIT/FIP scheme only — excludes large hydro, nuclear and thermal, and holds no storage (the scheme accredits generation). Installed = 新規認定分 + 移行認定分 導入容量; approved = 認定容量 新規認定分, and built_share compares 新規 against 新規 because that is the only like-for-like pair the register offers. Band sums reconcile to the sheet's own 合計. 出典：再生可能エネルギー電子申請サイト (https://www.fit-portal.go.jp/) — reshaped and aggregated by AI Root; not published in this form by the Japanese government.","source":"https://www.fit-portal.go.jp/PublicInfoSummary"},"source_url":"https://www.fit-portal.go.jp/PublicInfoSummary","publisher":"経済産業省 資源エネルギー庁 (METI/ANRE) — 再生可能エネルギー電子申請","fetched_at":"2026-10-11T22:20:39.480622+00:00","confidence":"high"},{"entity_id":"stat-jp-fit-capacity-2021-03","record_type":"capacity_stat","jurisdiction":"JP","data":{"id":"jp-fit-capacity-2021-03","name":"Japan FIT/FIP renewable capacity — as at 2021-03","country":"Japan","jurisdiction":"JP","as_at":"2021-03","total_mw":70524.4,"solar_mw":60942.2,"wind_mw":4489.1,"hydro_mw":929.7,"geothermal_mw":92.3,"biomass_mw":4071.2,"offshore_wind_mw":4.4,"approved_mw":98242.0,"built_share_pct":62.5,"by_class":[{"technology":"Solar","mw":60942.2},{"technology":"Wind","mw":4489.1},{"technology":"Biomass","mw":4071.2},{"technology":"Hydro","mw":929.7},{"technology":"Geothermal","mw":92.3}],"approx":false,"verify_note":"FIT/FIP scheme only — excludes large hydro, nuclear and thermal, and holds no storage (the scheme accredits generation). Installed = 新規認定分 + 移行認定分 導入容量; approved = 認定容量 新規認定分, and built_share compares 新規 against 新規 because that is the only like-for-like pair the register offers. Band sums reconcile to the sheet's own 合計. 出典：再生可能エネルギー電子申請サイト (https://www.fit-portal.go.jp/) — reshaped and aggregated by AI Root; not published in this form by the Japanese government.","source":"https://www.fit-portal.go.jp/PublicInfoSummary"},"source_url":"https://www.fit-portal.go.jp/PublicInfoSummary","publisher":"経済産業省 資源エネルギー庁 (METI/ANRE) — 再生可能エネルギー電子申請","fetched_at":"2026-10-11T22:20:39.480622+00:00","confidence":"high"},{"entity_id":"stat-jp-fit-capacity-2021-06","record_type":"capacity_stat","jurisdiction":"JP","data":{"id":"jp-fit-capacity-2021-06","name":"Japan FIT/FIP renewable capacity — as at 2021-06","country":"Japan","jurisdiction":"JP","as_at":"2021-06","total_mw":72190.9,"solar_mw":62172.2,"wind_mw":4557.9,"hydro_mw":1003.1,"geothermal_mw":93.0,"biomass_mw":4364.7,"offshore_wind_mw":4.4,"approved_mw":98864.4,"built_share_pct":63.8,"by_class":[{"technology":"Solar","mw":62172.2},{"technology":"Wind","mw":4557.9},{"technology":"Biomass","mw":4364.7},{"technology":"Hydro","mw":1003.1},{"technology":"Geothermal","mw":93.0}],"approx":false,"verify_note":"FIT/FIP scheme only — excludes large hydro, nuclear and thermal, and holds no storage (the scheme accredits generation). Installed = 新規認定分 + 移行認定分 導入容量; approved = 認定容量 新規認定分, and built_share compares 新規 against 新規 because that is the only like-for-like pair the register offers. Band sums reconcile to the sheet's own 合計. 出典：再生可能エネルギー電子申請サイト (https://www.fit-portal.go.jp/) — reshaped and aggregated by AI Root; not published in this form by the Japanese government.","source":"https://www.fit-portal.go.jp/PublicInfoSummary"},"source_url":"https://www.fit-portal.go.jp/PublicInfoSummary","publisher":"経済産業省 資源エネルギー庁 (METI/ANRE) — 再生可能エネルギー電子申請","fetched_at":"2026-10-11T22:20:39.480622+00:00","confidence":"high"},{"entity_id":"stat-jp-fit-capacity-2021-09","record_type":"capacity_stat","jurisdiction":"JP","data":{"id":"jp-fit-capacity-2021-09","name":"Japan FIT/FIP renewable capacity — as at 2021-09","country":"Japan","jurisdiction":"JP","as_at":"2021-09","total_mw":73320.6,"solar_mw":63161.3,"wind_mw":4590.5,"hydro_mw":1027.0,"geothermal_mw":93.7,"biomass_mw":4448.1,"offshore_wind_mw":4.4,"approved_mw":99126.2,"built_share_pct":64.7,"by_class":[{"technology":"Solar","mw":63161.3},{"technology":"Wind","mw":4590.5},{"technology":"Biomass","mw":4448.1},{"technology":"Hydro","mw":1027.0},{"technology":"Geothermal","mw":93.7}],"approx":false,"verify_note":"FIT/FIP scheme only — excludes large hydro, nuclear and thermal, and holds no storage (the scheme accredits generation). Installed = 新規認定分 + 移行認定分 導入容量; approved = 認定容量 新規認定分, and built_share compares 新規 against 新規 because that is the only like-for-like pair the register offers. Band sums reconcile to the sheet's own 合計. 出典：再生可能エネルギー電子申請サイト (https://www.fit-portal.go.jp/) — reshaped and aggregated by AI Root; not published in this form by the Japanese government.","source":"https://www.fit-portal.go.jp/PublicInfoSummary"},"source_url":"https://www.fit-portal.go.jp/PublicInfoSummary","publisher":"経済産業省 資源エネルギー庁 (METI/ANRE) — 再生可能エネルギー電子申請","fetched_at":"2026-10-11T22:20:39.480622+00:00","confidence":"high"},{"entity_id":"stat-jp-fit-capacity-2021-12","record_type":"capacity_stat","jurisdiction":"JP","data":{"id":"jp-fit-capacity-2021-12","name":"Japan FIT/FIP renewable capacity — as at 2021-12","country":"Japan","jurisdiction":"JP","as_at":"2021-12","total_mw":74711.1,"solar_mw":64333.8,"wind_mw":4707.8,"hydro_mw":1061.6,"geothermal_mw":93.7,"biomass_mw":4514.3,"offshore_wind_mw":4.4,"approved_mw":99560.0,"built_share_pct":65.8,"by_class":[{"technology":"Solar","mw":64333.8},{"technology":"Wind","mw":4707.8},{"technology":"Biomass","mw":4514.3},{"technology":"Hydro","mw":1061.6},{"technology":"Geothermal","mw":93.7}],"approx":false,"verify_note":"FIT/FIP scheme only — excludes large hydro, nuclear and thermal, and holds no storage (the scheme accredits generation). Installed = 新規認定分 + 移行認定分 導入容量; approved = 認定容量 新規認定分, and built_share compares 新規 against 新規 because that is the only like-for-like pair the register offers. Band sums reconcile to the sheet's own 合計. 出典：再生可能エネルギー電子申請サイト (https://www.fit-portal.go.jp/) — reshaped and aggregated by AI Root; not published in this form by the Japanese government.","source":"https://www.fit-portal.go.jp/PublicInfoSummary"},"source_url":"https://www.fit-portal.go.jp/PublicInfoSummary","publisher":"経済産業省 資源エネルギー庁 (METI/ANRE) — 再生可能エネルギー電子申請","fetched_at":"2026-10-11T22:20:39.480622+00:00","confidence":"high"},{"entity_id":"stat-jp-fit-capacity-2022-03","record_type":"capacity_stat","jurisdiction":"JP","data":{"id":"jp-fit-capacity-2022-03","name":"Japan FIT/FIP renewable capacity — as at 2022-03","country":"Japan","jurisdiction":"JP","as_at":"2022-03","total_mw":76201.0,"solar_mw":65527.5,"wind_mw":4771.1,"hydro_mw":1074.2,"geothermal_mw":93.8,"biomass_mw":4734.4,"offshore_wind_mw":4.4,"approved_mw":101188.4,"built_share_pct":66.3,"by_class":[{"technology":"Solar","mw":65527.5},{"technology":"Wind","mw":4771.1},{"technology":"Biomass","mw":4734.4},{"technology":"Hydro","mw":1074.2},{"technology":"Geothermal","mw":93.8}],"approx":false,"verify_note":"FIT/FIP scheme only — excludes large hydro, nuclear and thermal, and holds no storage (the scheme accredits generation). Installed = 新規認定分 + 移行認定分 導入容量; approved = 認定容量 新規認定分, and built_share compares 新規 against 新規 because that is the only like-for-like pair the register offers. Band sums reconcile to the sheet's own 合計. 出典：再生可能エネルギー電子申請サイト (https://www.fit-portal.go.jp/) — reshaped and aggregated by AI Root; not published in this form by the Japanese government.","source":"https://www.fit-portal.go.jp/PublicInfoSummary"},"source_url":"https://www.fit-portal.go.jp/PublicInfoSummary","publisher":"経済産業省 資源エネルギー庁 (METI/ANRE) — 再生可能エネルギー電子申請","fetched_at":"2026-10-11T22:20:39.480622+00:00","confidence":"high"},{"entity_id":"stat-jp-fit-capacity-2022-06","record_type":"capacity_stat","jurisdiction":"JP","data":{"id":"jp-fit-capacity-2022-06","name":"Japan FIT/FIP renewable capacity — as at 2022-06","country":"Japan","jurisdiction":"JP","as_at":"2022-06","total_mw":77700.1,"solar_mw":66596.4,"wind_mw":4823.2,"hydro_mw":1189.3,"geothermal_mw":93.8,"biomass_mw":4997.3,"offshore_wind_mw":4.4,"approved_mw":102097.5,"built_share_pct":67.2,"by_class":[{"technology":"Solar","mw":66596.4},{"technology":"Biomass","mw":4997.3},{"technology":"Wind","mw":4823.2},{"technology":"Hydro","mw":1189.3},{"technology":"Geothermal","mw":93.8}],"approx":false,"verify_note":"FIT/FIP scheme only — excludes large hydro, nuclear and thermal, and holds no storage (the scheme accredits generation). Installed = 新規認定分 + 移行認定分 導入容量; approved = 認定容量 新規認定分, and built_share compares 新規 against 新規 because that is the only like-for-like pair the register offers. Band sums reconcile to the sheet's own 合計. 出典：再生可能エネルギー電子申請サイト (https://www.fit-portal.go.jp/) — reshaped and aggregated by AI Root; not published in this form by the Japanese government.","source":"https://www.fit-portal.go.jp/PublicInfoSummary"},"source_url":"https://www.fit-portal.go.jp/PublicInfoSummary","publisher":"経済産業省 資源エネルギー庁 (METI/ANRE) — 再生可能エネルギー電子申請","fetched_at":"2026-10-11T22:20:39.480622+00:00","confidence":"high"},{"entity_id":"stat-jp-fit-capacity-2022-09","record_type":"capacity_stat","jurisdiction":"JP","data":{"id":"jp-fit-capacity-2022-09","name":"Japan FIT/FIP renewable capacity — as at 2022-09","country":"Japan","jurisdiction":"JP","as_at":"2022-09","total_mw":79280.0,"solar_mw":67804.9,"wind_mw":4866.6,"hydro_mw":1215.7,"geothermal_mw":93.8,"biomass_mw":5298.9,"offshore_wind_mw":4.4,"approved_mw":102611.5,"built_share_pct":68.4,"by_class":[{"technology":"Solar","mw":67804.9},{"technology":"Biomass","mw":5298.9},{"technology":"Wind","mw":4866.6},{"technology":"Hydro","mw":1215.7},{"technology":"Geothermal","mw":93.8}],"approx":false,"verify_note":"FIT/FIP scheme only — excludes large hydro, nuclear and thermal, and holds no storage (the scheme accredits generation). Installed = 新規認定分 + 移行認定分 導入容量; approved = 認定容量 新規認定分, and built_share compares 新規 against 新規 because that is the only like-for-like pair the register offers. Band sums reconcile to the sheet's own 合計. 出典：再生可能エネルギー電子申請サイト (https://www.fit-portal.go.jp/) — reshaped and aggregated by AI Root; not published in this form by the Japanese government.","source":"https://www.fit-portal.go.jp/PublicInfoSummary"},"source_url":"https://www.fit-portal.go.jp/PublicInfoSummary","publisher":"経済産業省 資源エネルギー庁 (METI/ANRE) — 再生可能エネルギー電子申請","fetched_at":"2026-10-11T22:20:39.480622+00:00","confidence":"high"},{"entity_id":"stat-jp-fit-capacity-2022-12","record_type":"capacity_stat","jurisdiction":"JP","data":{"id":"jp-fit-capacity-2022-12","name":"Japan FIT/FIP renewable capacity — as at 2022-12","country":"Japan","jurisdiction":"JP","as_at":"2022-12","total_mw":80502.9,"solar_mw":68854.9,"wind_mw":4720.0,"hydro_mw":1332.3,"geothermal_mw":95.8,"biomass_mw":5499.8,"offshore_wind_mw":4.4,"approved_mw":102622.1,"built_share_pct":69.6,"by_class":[{"technology":"Solar","mw":68854.9},{"technology":"Biomass","mw":5499.8},{"technology":"Wind","mw":4720.0},{"technology":"Hydro","mw":1332.3},{"technology":"Geothermal","mw":95.8}],"approx":false,"verify_note":"FIT/FIP scheme only — excludes large hydro, nuclear and thermal, and holds no storage (the scheme accredits generation). Installed = 新規認定分 + 移行認定分 導入容量; approved = 認定容量 新規認定分, and built_share compares 新規 against 新規 because that is the only like-for-like pair the register offers. Band sums reconcile to the sheet's own 合計. 出典：再生可能エネルギー電子申請サイト (https://www.fit-portal.go.jp/) — reshaped and aggregated by AI Root; not published in this form by the Japanese government.","source":"https://www.fit-portal.go.jp/PublicInfoSummary"},"source_url":"https://www.fit-portal.go.jp/PublicInfoSummary","publisher":"経済産業省 資源エネルギー庁 (METI/ANRE) — 再生可能エネルギー電子申請","fetched_at":"2026-10-11T22:20:39.480622+00:00","confidence":"high"},{"entity_id":"stat-jp-fit-capacity-2023-03","record_type":"capacity_stat","jurisdiction":"JP","data":{"id":"jp-fit-capacity-2023-03","name":"Japan FIT/FIP renewable capacity — as at 2023-03","country":"Japan","jurisdiction":"JP","as_at":"2023-03","total_mw":82619.0,"solar_mw":70124.6,"wind_mw":5058.0,"hydro_mw":1370.6,"geothermal_mw":96.4,"biomass_mw":5969.3,"offshore_wind_mw":88.4,"approved_mw":99414.1,"built_share_pct":74.0,"by_class":[{"technology":"Solar","mw":70124.6},{"technology":"Biomass","mw":5969.3},{"technology":"Wind","mw":5058.0},{"technology":"Hydro","mw":1370.6},{"technology":"Geothermal","mw":96.4}],"approx":false,"verify_note":"FIT/FIP scheme only — excludes large hydro, nuclear and thermal, and holds no storage (the scheme accredits generation). Installed = 新規認定分 + 移行認定分 導入容量; approved = 認定容量 新規認定分, and built_share compares 新規 against 新規 because that is the only like-for-like pair the register offers. Band sums reconcile to the sheet's own 合計. 出典：再生可能エネルギー電子申請サイト (https://www.fit-portal.go.jp/) — reshaped and aggregated by AI Root; not published in this form by the Japanese government.","source":"https://www.fit-portal.go.jp/PublicInfoSummary"},"source_url":"https://www.fit-portal.go.jp/PublicInfoSummary","publisher":"経済産業省 資源エネルギー庁 (METI/ANRE) — 再生可能エネルギー電子申請","fetched_at":"2026-10-11T22:20:39.480622+00:00","confidence":"high"},{"entity_id":"stat-jp-fit-capacity-2023-06","record_type":"capacity_stat","jurisdiction":"JP","data":{"id":"jp-fit-capacity-2023-06","name":"Japan FIT/FIP renewable capacity — as at 2023-06","country":"Japan","jurisdiction":"JP","as_at":"2023-06","total_mw":84270.0,"solar_mw":71092.1,"wind_mw":5437.9,"hydro_mw":1479.9,"geothermal_mw":113.4,"biomass_mw":6146.6,"offshore_wind_mw":88.4,"approved_mw":101830.7,"built_share_pct":73.9,"by_class":[{"technology":"Solar","mw":71092.1},{"technology":"Biomass","mw":6146.6},{"technology":"Wind","mw":5437.9},{"technology":"Hydro","mw":1479.9},{"technology":"Geothermal","mw":113.4}],"approx":false,"verify_note":"FIT/FIP scheme only — excludes large hydro, nuclear and thermal, and holds no storage (the scheme accredits generation). Installed = 新規認定分 + 移行認定分 導入容量; approved = 認定容量 新規認定分, and built_share compares 新規 against 新規 because that is the only like-for-like pair the register offers. Band sums reconcile to the sheet's own 合計. 出典：再生可能エネルギー電子申請サイト (https://www.fit-portal.go.jp/) — reshaped and aggregated by AI Root; not published in this form by the Japanese government.","source":"https://www.fit-portal.go.jp/PublicInfoSummary"},"source_url":"https://www.fit-portal.go.jp/PublicInfoSummary","publisher":"経済産業省 資源エネルギー庁 (METI/ANRE) — 再生可能エネルギー電子申請","fetched_at":"2026-10-11T22:20:39.480622+00:00","confidence":"high"},{"entity_id":"stat-jp-fit-capacity-2023-09","record_type":"capacity_stat","jurisdiction":"JP","data":{"id":"jp-fit-capacity-2023-09","name":"Japan FIT/FIP renewable capacity — as at 2023-09","country":"Japan","jurisdiction":"JP","as_at":"2023-09","total_mw":85091.6,"solar_mw":71815.8,"wind_mw":5432.7,"hydro_mw":1427.0,"geothermal_mw":114.1,"biomass_mw":6302.0,"offshore_wind_mw":88.4,"approved_mw":101474.3,"built_share_pct":75.0,"by_class":[{"technology":"Solar","mw":71815.8},{"technology":"Biomass","mw":6302.0},{"technology":"Wind","mw":5432.7},{"technology":"Hydro","mw":1427.0},{"technology":"Geothermal","mw":114.1}],"approx":false,"verify_note":"FIT/FIP scheme only — excludes large hydro, nuclear and thermal, and holds no storage (the scheme accredits generation). Installed = 新規認定分 + 移行認定分 導入容量; approved = 認定容量 新規認定分, and built_share compares 新規 against 新規 because that is the only like-for-like pair the register offers. Band sums reconcile to the sheet's own 合計. 出典：再生可能エネルギー電子申請サイト (https://www.fit-portal.go.jp/) — reshaped and aggregated by AI Root; not published in this form by the Japanese government.","source":"https://www.fit-portal.go.jp/PublicInfoSummary"},"source_url":"https://www.fit-portal.go.jp/PublicInfoSummary","publisher":"経済産業省 資源エネルギー庁 (METI/ANRE) — 再生可能エネルギー電子申請","fetched_at":"2026-10-11T22:20:39.480622+00:00","confidence":"high"},{"entity_id":"stat-jp-fit-capacity-2023-12","record_type":"capacity_stat","jurisdiction":"JP","data":{"id":"jp-fit-capacity-2023-12","name":"Japan FIT/FIP renewable capacity — as at 2023-12","country":"Japan","jurisdiction":"JP","as_at":"2023-12","total_mw":86047.4,"solar_mw":72534.0,"wind_mw":5527.4,"hydro_mw":1505.1,"geothermal_mw":117.0,"biomass_mw":6363.9,"offshore_wind_mw":150.5,"approved_mw":101757.8,"built_share_pct":75.8,"by_class":[{"technology":"Solar","mw":72534.0},{"technology":"Biomass","mw":6363.9},{"technology":"Wind","mw":5527.4},{"technology":"Hydro","mw":1505.1},{"technology":"Geothermal","mw":117.0}],"approx":false,"verify_note":"FIT/FIP scheme only — excludes large hydro, nuclear and thermal, and holds no storage (the scheme accredits generation). Installed = 新規認定分 + 移行認定分 導入容量; approved = 認定容量 新規認定分, and built_share compares 新規 against 新規 because that is the only like-for-like pair the register offers. Band sums reconcile to the sheet's own 合計. 出典：再生可能エネルギー電子申請サイト (https://www.fit-portal.go.jp/) — reshaped and aggregated by AI Root; not published in this form by the Japanese government.","source":"https://www.fit-portal.go.jp/PublicInfoSummary"},"source_url":"https://www.fit-portal.go.jp/PublicInfoSummary","publisher":"経済産業省 資源エネルギー庁 (METI/ANRE) — 再生可能エネルギー電子申請","fetched_at":"2026-10-11T22:20:39.480622+00:00","confidence":"high"},{"entity_id":"stat-jp-fit-capacity-2024-03","record_type":"capacity_stat","jurisdiction":"JP","data":{"id":"jp-fit-capacity-2024-03","name":"Japan FIT/FIP renewable capacity — as at 2024-03","country":"Japan","jurisdiction":"JP","as_at":"2024-03","total_mw":87462.8,"solar_mw":73221.7,"wind_mw":6030.7,"hydro_mw":1619.9,"geothermal_mw":136.9,"biomass_mw":6453.5,"offshore_wind_mw":250.5,"approved_mw":102094.5,"built_share_pct":77.0,"by_class":[{"technology":"Solar","mw":73221.7},{"technology":"Biomass","mw":6453.5},{"technology":"Wind","mw":6030.7},{"technology":"Hydro","mw":1619.9},{"technology":"Geothermal","mw":136.9}],"approx":false,"verify_note":"FIT/FIP scheme only — excludes large hydro, nuclear and thermal, and holds no storage (the scheme accredits generation). Installed = 新規認定分 + 移行認定分 導入容量; approved = 認定容量 新規認定分, and built_share compares 新規 against 新規 because that is the only like-for-like pair the register offers. Band sums reconcile to the sheet's own 合計. 出典：再生可能エネルギー電子申請サイト (https://www.fit-portal.go.jp/) — reshaped and aggregated by AI Root; not published in this form by the Japanese government.","source":"https://www.fit-portal.go.jp/PublicInfoSummary"},"source_url":"https://www.fit-portal.go.jp/PublicInfoSummary","publisher":"経済産業省 資源エネルギー庁 (METI/ANRE) — 再生可能エネルギー電子申請","fetched_at":"2026-10-11T22:20:39.480622+00:00","confidence":"high"},{"entity_id":"stat-jp-fit-capacity-2024-06","record_type":"capacity_stat","jurisdiction":"JP","data":{"id":"jp-fit-capacity-2024-06","name":"Japan FIT/FIP renewable capacity — as at 2024-06","country":"Japan","jurisdiction":"JP","as_at":"2024-06","total_mw":88270.2,"solar_mw":73716.0,"wind_mw":6191.1,"hydro_mw":1648.2,"geothermal_mw":143.4,"biomass_mw":6571.6,"offshore_wind_mw":250.5,"approved_mw":102692.3,"built_share_pct":77.4,"by_class":[{"technology":"Solar","mw":73716.0},{"technology":"Biomass","mw":6571.6},{"technology":"Wind","mw":6191.1},{"technology":"Hydro","mw":1648.2},{"technology":"Geothermal","mw":143.4}],"approx":false,"verify_note":"FIT/FIP scheme only — excludes large hydro, nuclear and thermal, and holds no storage (the scheme accredits generation). Installed = 新規認定分 + 移行認定分 導入容量; approved = 認定容量 新規認定分, and built_share compares 新規 against 新規 because that is the only like-for-like pair the register offers. Band sums reconcile to the sheet's own 合計. 出典：再生可能エネルギー電子申請サイト (https://www.fit-portal.go.jp/) — reshaped and aggregated by AI Root; not published in this form by the Japanese government.","source":"https://www.fit-portal.go.jp/PublicInfoSummary"},"source_url":"https://www.fit-portal.go.jp/PublicInfoSummary","publisher":"経済産業省 資源エネルギー庁 (METI/ANRE) — 再生可能エネルギー電子申請","fetched_at":"2026-10-11T22:20:39.480622+00:00","confidence":"high"},{"entity_id":"stat-jp-fit-capacity-2024-09","record_type":"capacity_stat","jurisdiction":"JP","data":{"id":"jp-fit-capacity-2024-09","name":"Japan FIT/FIP renewable capacity — as at 2024-09","country":"Japan","jurisdiction":"JP","as_at":"2024-09","total_mw":89081.1,"solar_mw":74283.5,"wind_mw":6197.8,"hydro_mw":1685.7,"geothermal_mw":143.4,"biomass_mw":6770.7,"offshore_wind_mw":250.5,"approved_mw":103043.7,"built_share_pct":77.9,"by_class":[{"technology":"Solar","mw":74283.5},{"technology":"Biomass","mw":6770.7},{"technology":"Wind","mw":6197.8},{"technology":"Hydro","mw":1685.7},{"technology":"Geothermal","mw":143.4}],"approx":false,"verify_note":"FIT/FIP scheme only — excludes large hydro, nuclear and thermal, and holds no storage (the scheme accredits generation). Installed = 新規認定分 + 移行認定分 導入容量; approved = 認定容量 新規認定分, and built_share compares 新規 against 新規 because that is the only like-for-like pair the register offers. Band sums reconcile to the sheet's own 合計. 出典：再生可能エネルギー電子申請サイト (https://www.fit-portal.go.jp/) — reshaped and aggregated by AI Root; not published in this form by the Japanese government.","source":"https://www.fit-portal.go.jp/PublicInfoSummary"},"source_url":"https://www.fit-portal.go.jp/PublicInfoSummary","publisher":"経済産業省 資源エネルギー庁 (METI/ANRE) — 再生可能エネルギー電子申請","fetched_at":"2026-10-11T22:20:39.480622+00:00","confidence":"high"},{"entity_id":"stat-jp-fit-capacity-2024-12","record_type":"capacity_stat","jurisdiction":"JP","data":{"id":"jp-fit-capacity-2024-12","name":"Japan FIT/FIP renewable capacity — as at 2024-12","country":"Japan","jurisdiction":"JP","as_at":"2024-12","total_mw":90068.9,"solar_mw":74979.7,"wind_mw":6108.7,"hydro_mw":1712.2,"geothermal_mw":143.4,"biomass_mw":7124.8,"offshore_wind_mw":250.5,"approved_mw":103063.8,"built_share_pct":78.8,"by_class":[{"technology":"Solar","mw":74979.7},{"technology":"Biomass","mw":7124.8},{"technology":"Wind","mw":6108.7},{"technology":"Hydro","mw":1712.2},{"technology":"Geothermal","mw":143.4}],"approx":false,"verify_note":"FIT/FIP scheme only — excludes large hydro, nuclear and thermal, and holds no storage (the scheme accredits generation). Installed = 新規認定分 + 移行認定分 導入容量; approved = 認定容量 新規認定分, and built_share compares 新規 against 新規 because that is the only like-for-like pair the register offers. Band sums reconcile to the sheet's own 合計. 出典：再生可能エネルギー電子申請サイト (https://www.fit-portal.go.jp/) — reshaped and aggregated by AI Root; not published in this form by the Japanese government.","source":"https://www.fit-portal.go.jp/PublicInfoSummary"},"source_url":"https://www.fit-portal.go.jp/PublicInfoSummary","publisher":"経済産業省 資源エネルギー庁 (METI/ANRE) — 再生可能エネルギー電子申請","fetched_at":"2026-10-11T22:20:39.480622+00:00","confidence":"high"},{"entity_id":"stat-jp-fit-capacity-2025-03","record_type":"capacity_stat","jurisdiction":"JP","data":{"id":"jp-fit-capacity-2025-03","name":"Japan FIT/FIP renewable capacity — as at 2025-03","country":"Japan","jurisdiction":"JP","as_at":"2025-03","total_mw":91752.4,"solar_mw":76030.2,"wind_mw":6375.3,"hydro_mw":1747.8,"geothermal_mw":143.4,"biomass_mw":7455.6,"offshore_wind_mw":250.5,"approved_mw":103183.4,"built_share_pct":80.4,"by_class":[{"technology":"Solar","mw":76030.2},{"technology":"Biomass","mw":7455.6},{"technology":"Wind","mw":6375.3},{"technology":"Hydro","mw":1747.8},{"technology":"Geothermal","mw":143.4}],"approx":false,"verify_note":"FIT/FIP scheme only — excludes large hydro, nuclear and thermal, and holds no storage (the scheme accredits generation). Installed = 新規認定分 + 移行認定分 導入容量; approved = 認定容量 新規認定分, and built_share compares 新規 against 新規 because that is the only like-for-like pair the register offers. Band sums reconcile to the sheet's own 合計. 出典：再生可能エネルギー電子申請サイト (https://www.fit-portal.go.jp/) — reshaped and aggregated by AI Root; not published in this form by the Japanese government.","source":"https://www.fit-portal.go.jp/PublicInfoSummary"},"source_url":"https://www.fit-portal.go.jp/PublicInfoSummary","publisher":"経済産業省 資源エネルギー庁 (METI/ANRE) — 再生可能エネルギー電子申請","fetched_at":"2026-10-11T22:20:39.480622+00:00","confidence":"high"},{"entity_id":"stat-jp-fit-capacity-2025-06","record_type":"capacity_stat","jurisdiction":"JP","data":{"id":"jp-fit-capacity-2025-06","name":"Japan FIT/FIP renewable capacity — as at 2025-06","country":"Japan","jurisdiction":"JP","as_at":"2025-06","total_mw":92426.0,"solar_mw":76326.3,"wind_mw":6502.2,"hydro_mw":1840.6,"geothermal_mw":144.0,"biomass_mw":7612.8,"offshore_wind_mw":253.5,"approved_mw":104089.3,"built_share_pct":80.3,"by_class":[{"technology":"Solar","mw":76326.3},{"technology":"Biomass","mw":7612.8},{"technology":"Wind","mw":6502.2},{"technology":"Hydro","mw":1840.6},{"technology":"Geothermal","mw":144.0}],"approx":false,"verify_note":"FIT/FIP scheme only — excludes large hydro, nuclear and thermal, and holds no storage (the scheme accredits generation). Installed = 新規認定分 + 移行認定分 導入容量; approved = 認定容量 新規認定分, and built_share compares 新規 against 新規 because that is the only like-for-like pair the register offers. Band sums reconcile to the sheet's own 合計. 出典：再生可能エネルギー電子申請サイト (https://www.fit-portal.go.jp/) — reshaped and aggregated by AI Root; not published in this form by the Japanese government.","source":"https://www.fit-portal.go.jp/PublicInfoSummary"},"source_url":"https://www.fit-portal.go.jp/PublicInfoSummary","publisher":"経済産業省 資源エネルギー庁 (METI/ANRE) — 再生可能エネルギー電子申請","fetched_at":"2026-10-11T22:20:39.480622+00:00","confidence":"high"},{"entity_id":"stat-jp-fit-capacity-2025-09","record_type":"capacity_stat","jurisdiction":"JP","data":{"id":"jp-fit-capacity-2025-09","name":"Japan FIT/FIP renewable capacity — as at 2025-09","country":"Japan","jurisdiction":"JP","as_at":"2025-09","total_mw":93337.1,"solar_mw":76936.5,"wind_mw":6429.6,"hydro_mw":1944.7,"geothermal_mw":144.0,"biomass_mw":7882.2,"offshore_wind_mw":253.5,"approved_mw":104786.2,"built_share_pct":80.8,"by_class":[{"technology":"Solar","mw":76936.5},{"technology":"Biomass","mw":7882.2},{"technology":"Wind","mw":6429.6},{"technology":"Hydro","mw":1944.7},{"technology":"Geothermal","mw":144.0}],"approx":false,"verify_note":"FIT/FIP scheme only — excludes large hydro, nuclear and thermal, and holds no storage (the scheme accredits generation). Installed = 新規認定分 + 移行認定分 導入容量; approved = 認定容量 新規認定分, and built_share compares 新規 against 新規 because that is the only like-for-like pair the register offers. Band sums reconcile to the sheet's own 合計. 出典：再生可能エネルギー電子申請サイト (https://www.fit-portal.go.jp/) — reshaped and aggregated by AI Root; not published in this form by the Japanese government.","source":"https://www.fit-portal.go.jp/PublicInfoSummary"},"source_url":"https://www.fit-portal.go.jp/PublicInfoSummary","publisher":"経済産業省 資源エネルギー庁 (METI/ANRE) — 再生可能エネルギー電子申請","fetched_at":"2026-10-11T22:20:39.480622+00:00","confidence":"high"},{"entity_id":"stat-jp-fit-capacity-2026-03","record_type":"capacity_stat","jurisdiction":"JP","data":{"id":"jp-fit-capacity-2026-03","name":"Japan FIT/FIP renewable capacity — as at 2026-03","country":"Japan","jurisdiction":"JP","as_at":"2026-03","total_mw":95281.3,"solar_mw":77997.3,"wind_mw":7108.3,"hydro_mw":1973.9,"geothermal_mw":164.0,"biomass_mw":8037.9,"offshore_wind_mw":490.3,"approved_mw":102217.4,"built_share_pct":84.7,"by_class":[{"technology":"Solar","mw":77997.3},{"technology":"Biomass","mw":8037.9},{"technology":"Wind","mw":7108.3},{"technology":"Hydro","mw":1973.9},{"technology":"Geothermal","mw":164.0}],"approx":false,"verify_note":"FIT/FIP scheme only — excludes large hydro, nuclear and thermal, and holds no storage (the scheme accredits generation). Installed = 新規認定分 + 移行認定分 導入容量; approved = 認定容量 新規認定分, and built_share compares 新規 against 新規 because that is the only like-for-like pair the register offers. Band sums reconcile to the sheet's own 合計. 出典：再生可能エネルギー電子申請サイト (https://www.fit-portal.go.jp/) — reshaped and aggregated by AI Root; not published in this form by the Japanese government.","source":"https://www.fit-portal.go.jp/PublicInfoSummary"},"source_url":"https://www.fit-portal.go.jp/PublicInfoSummary","publisher":"経済産業省 資源エネルギー庁 (METI/ANRE) — 再生可能エネルギー電子申請","fetched_at":"2026-10-11T22:20:39.480622+00:00","confidence":"high"},{"entity_id":"stc-clearing-house","record_type":"clearing_house_status","jurisdiction":"AU-federal","data":{"scheme":"STC","status":"In surplus","stcs_queued":4618940,"offers_in_list":541,"fixed_price_aud":40.0,"front_of_queue_offered":"2026-08-18","source_timestamp":"2026-10-12T05:14:26.079Z"},"source_url":"https://www.rec-registry.gov.au/rec-registry/app/public/stcs-clearing-house-transfer-list","publisher":"Clean Energy Regulator (REC Registry)","fetched_at":"2026-10-12T05:20:06.965422+00:00","confidence":"high"},{"entity_id":"fit-au-act-actewagl","record_type":"feed_in_tariff","jurisdiction":"AU-ACT","data":{"id":"fit-au-act-actewagl","jurisdiction":"AU-ACT","retailer":"ActewAGL","fit_c_per_kwh":"10-15 first tier then 6-11","structure":"Tiered w/ daily cap","notes":"gosolarquotes/wattever 2026 - verify"},"source_url":"https://www.energymadeeasy.gov.au","publisher":"State regulators + retailers","fetched_at":"2026-08-30T10:16:53.737362+00:00","confidence":"medium"},{"entity_id":"fit-au-act-origin","record_type":"feed_in_tariff","jurisdiction":"AU-ACT","data":{"id":"fit-au-act-origin","jurisdiction":"AU-ACT","retailer":"Origin","fit_c_per_kwh":8,"structure":"Flat (range ~3-8)","notes":"solarquotes 2026 - verify"},"source_url":"https://www.energymadeeasy.gov.au","publisher":"State regulators + retailers","fetched_at":"2026-08-30T10:16:53.737362+00:00","confidence":"medium"},{"entity_id":"fit-au-act-territory-market-set","record_type":"feed_in_tariff","jurisdiction":"AU-ACT","data":{"id":"fit-au-act-territory-market-set","jurisdiction":"AU-ACT","retailer":"Territory (market-set)","fit_c_per_kwh":"~7 avg, up to 15 tiered","structure":"Retailer-set; tiered w/ daily caps","notes":"No regulated FiT in ACT."},"source_url":"https://www.energymadeeasy.gov.au","publisher":"State regulators + retailers","fetched_at":"2026-08-30T10:16:53.737362+00:00","confidence":"medium"},{"entity_id":"fit-au-nsw-agl","record_type":"feed_in_tariff","jurisdiction":"AU-NSW","data":{"id":"fit-au-nsw-agl","jurisdiction":"AU-NSW","retailer":"AGL","fit_c_per_kwh":8,"structure":"Flat (top rate often intro/12-mth)","notes":"Market table Jul-2026 - verify"},"source_url":"https://www.energymadeeasy.gov.au","publisher":"State regulators + retailers","fetched_at":"2026-08-30T10:16:53.737362+00:00","confidence":"medium"},{"entity_id":"fit-au-nsw-alinta","record_type":"feed_in_tariff","jurisdiction":"AU-NSW","data":{"id":"fit-au-nsw-alinta","jurisdiction":"AU-NSW","retailer":"Alinta","fit_c_per_kwh":8,"structure":"Flat","notes":"Market table Jul-2026 - verify"},"source_url":"https://www.energymadeeasy.gov.au","publisher":"State regulators + retailers","fetched_at":"2026-08-30T10:16:53.737362+00:00","confidence":"medium"},{"entity_id":"fit-au-nsw-energyaustralia","record_type":"feed_in_tariff","jurisdiction":"AU-NSW","data":{"id":"fit-au-nsw-energyaustralia","jurisdiction":"AU-NSW","retailer":"EnergyAustralia","fit_c_per_kwh":8,"structure":"Flat","notes":"Market table Jul-2026 - verify"},"source_url":"https://www.energymadeeasy.gov.au","publisher":"State regulators + retailers","fetched_at":"2026-08-30T10:16:53.737362+00:00","confidence":"medium"},{"entity_id":"fit-au-nsw-ipart-benchmark-all-day","record_type":"feed_in_tariff","jurisdiction":"AU-NSW","data":{"id":"fit-au-nsw-ipart-benchmark-all-day","jurisdiction":"AU-NSW","retailer":"IPART benchmark (all-day)","fit_c_per_kwh":"3.4-6.5","structure":"Voluntary flat benchmark","notes":"IPART 2026-27; down from 4.8-7.3c. Recently changed."},"source_url":"https://www.energymadeeasy.gov.au","publisher":"State regulators + retailers","fetched_at":"2026-08-30T10:16:53.737362+00:00","confidence":"medium"},{"entity_id":"fit-au-nsw-ipart-benchmark-time-of-day","record_type":"feed_in_tariff","jurisdiction":"AU-NSW","data":{"id":"fit-au-nsw-ipart-benchmark-time-of-day","jurisdiction":"AU-NSW","retailer":"IPART benchmark (time-of-day)","fit_c_per_kwh":"up to 17.2-33.3 evening peak","structure":"Time-varying benchmark; near-zero midday","notes":"IPART 2026-27 time-dependent."},"source_url":"https://www.energymadeeasy.gov.au","publisher":"State regulators + retailers","fetched_at":"2026-08-30T10:16:53.737362+00:00","confidence":"medium"},{"entity_id":"fit-au-nsw-origin","record_type":"feed_in_tariff","jurisdiction":"AU-NSW","data":{"id":"fit-au-nsw-origin","jurisdiction":"AU-NSW","retailer":"Origin","fit_c_per_kwh":8,"structure":"Flat","notes":"Market table Jul-2026 - verify"},"source_url":"https://www.energymadeeasy.gov.au","publisher":"State regulators + retailers","fetched_at":"2026-08-30T10:16:53.737362+00:00","confidence":"medium"},{"entity_id":"fit-au-nsw-red-energy","record_type":"feed_in_tariff","jurisdiction":"AU-NSW","data":{"id":"fit-au-nsw-red-energy","jurisdiction":"AU-NSW","retailer":"Red Energy","fit_c_per_kwh":2.5,"structure":"Flat (low-FiT positioning)","notes":"Market table Jul-2026 - verify"},"source_url":"https://www.energymadeeasy.gov.au","publisher":"State regulators + retailers","fetched_at":"2026-08-30T10:16:53.737362+00:00","confidence":"medium"},{"entity_id":"fit-au-qld-agl-seq","record_type":"feed_in_tariff","jurisdiction":"AU-QLD","data":{"id":"fit-au-qld-agl-seq","jurisdiction":"AU-QLD","retailer":"AGL (SEQ)","fit_c_per_kwh":8,"structure":"Flat","notes":"Market table Jul-2026 - verify"},"source_url":"https://www.energymadeeasy.gov.au","publisher":"State regulators + retailers","fetched_at":"2026-08-30T10:16:53.737362+00:00","confidence":"medium"},{"entity_id":"fit-au-qld-energyaustralia-seq","record_type":"feed_in_tariff","jurisdiction":"AU-QLD","data":{"id":"fit-au-qld-energyaustralia-seq","jurisdiction":"AU-QLD","retailer":"EnergyAustralia (SEQ)","fit_c_per_kwh":8,"structure":"Flat","notes":"Market table Jul-2026 - verify"},"source_url":"https://www.energymadeeasy.gov.au","publisher":"State regulators + retailers","fetched_at":"2026-08-30T10:16:53.737362+00:00","confidence":"medium"},{"entity_id":"fit-au-qld-ergon-regional-regulated","record_type":"feed_in_tariff","jurisdiction":"AU-QLD","data":{"id":"fit-au-qld-ergon-regional-regulated","jurisdiction":"AU-QLD","retailer":"Ergon (regional, regulated)","fit_c_per_kwh":6.006,"structure":"Flat regulated","notes":"QCA 2026-27 from 1 Jul; ~31% cut. Recently changed."},"source_url":"https://www.energymadeeasy.gov.au","publisher":"State regulators + retailers","fetched_at":"2026-08-30T10:16:53.737362+00:00","confidence":"medium"},{"entity_id":"fit-au-qld-globird-seq","record_type":"feed_in_tariff","jurisdiction":"AU-QLD","data":{"id":"fit-au-qld-globird-seq","jurisdiction":"AU-QLD","retailer":"GloBird (SEQ)","fit_c_per_kwh":10,"structure":"Flat (highest SEQ headline; promo/conditional)","notes":"Market table Jul-2026 - verify"},"source_url":"https://www.energymadeeasy.gov.au","publisher":"State regulators + retailers","fetched_at":"2026-08-30T10:16:53.737362+00:00","confidence":"medium"},{"entity_id":"fit-au-qld-origin-seq","record_type":"feed_in_tariff","jurisdiction":"AU-QLD","data":{"id":"fit-au-qld-origin-seq","jurisdiction":"AU-QLD","retailer":"Origin (SEQ)","fit_c_per_kwh":8.7,"structure":"Flat","notes":"Market table Jul-2026 - verify"},"source_url":"https://www.energymadeeasy.gov.au","publisher":"State regulators + retailers","fetched_at":"2026-08-30T10:16:53.737362+00:00","confidence":"medium"},{"entity_id":"fit-au-qld-red-energy-seq","record_type":"feed_in_tariff","jurisdiction":"AU-QLD","data":{"id":"fit-au-qld-red-energy-seq","jurisdiction":"AU-QLD","retailer":"Red Energy (SEQ)","fit_c_per_kwh":5,"structure":"Flat","notes":"Market table Jul-2026 - verify"},"source_url":"https://www.energymadeeasy.gov.au","publisher":"State regulators + retailers","fetched_at":"2026-08-30T10:16:53.737362+00:00","confidence":"medium"},{"entity_id":"fit-au-qld-seq-energex-market-set","record_type":"feed_in_tariff","jurisdiction":"AU-QLD","data":{"id":"fit-au-qld-seq-energex-market-set","jurisdiction":"AU-QLD","retailer":"SEQ / Energex (market-set)","fit_c_per_kwh":"8-10","structure":"Retailer-set (voluntary)","notes":"SEQ deregulated; only Ergon regional is regulated."},"source_url":"https://www.energymadeeasy.gov.au","publisher":"State regulators + retailers","fetched_at":"2026-08-30T10:16:53.737362+00:00","confidence":"medium"},{"entity_id":"fit-au-sa-agl","record_type":"feed_in_tariff","jurisdiction":"AU-SA","data":{"id":"fit-au-sa-agl","jurisdiction":"AU-SA","retailer":"AGL","fit_c_per_kwh":8,"structure":"Flat (<=10kW system)","notes":"Market table Jul-2026 - verify"},"source_url":"https://www.energymadeeasy.gov.au","publisher":"State regulators + retailers","fetched_at":"2026-08-30T10:16:53.737362+00:00","confidence":"medium"},{"entity_id":"fit-au-sa-energyaustralia","record_type":"feed_in_tariff","jurisdiction":"AU-SA","data":{"id":"fit-au-sa-energyaustralia","jurisdiction":"AU-SA","retailer":"EnergyAustralia","fit_c_per_kwh":8,"structure":"Tiered - capped first 12 kWh/day (best avg ~5.5c)","notes":"Market table Jul-2026 - verify"},"source_url":"https://www.energymadeeasy.gov.au","publisher":"State regulators + retailers","fetched_at":"2026-08-30T10:16:53.737362+00:00","confidence":"medium"},{"entity_id":"fit-au-sa-engie","record_type":"feed_in_tariff","jurisdiction":"AU-SA","data":{"id":"fit-au-sa-engie","jurisdiction":"AU-SA","retailer":"ENGIE","fit_c_per_kwh":8,"structure":"Tiered - capped first 8 kWh/day","notes":"Market table Jul-2026 - verify"},"source_url":"https://www.energymadeeasy.gov.au","publisher":"State regulators + retailers","fetched_at":"2026-08-30T10:16:53.737362+00:00","confidence":"medium"},{"entity_id":"fit-au-sa-origin","record_type":"feed_in_tariff","jurisdiction":"AU-SA","data":{"id":"fit-au-sa-origin","jurisdiction":"AU-SA","retailer":"Origin","fit_c_per_kwh":8,"structure":"Tiered - capped first 14 kWh/day","notes":"Market table Jul-2026 - verify"},"source_url":"https://www.energymadeeasy.gov.au","publisher":"State regulators + retailers","fetched_at":"2026-08-30T10:16:53.737362+00:00","confidence":"medium"},{"entity_id":"fit-au-sa-red-energy","record_type":"feed_in_tariff","jurisdiction":"AU-SA","data":{"id":"fit-au-sa-red-energy","jurisdiction":"AU-SA","retailer":"Red Energy","fit_c_per_kwh":2,"structure":"Flat (low-FiT)","notes":"Market table Jul-2026 - verify"},"source_url":"https://www.energymadeeasy.gov.au","publisher":"State regulators + retailers","fetched_at":"2026-08-30T10:16:53.737362+00:00","confidence":"medium"},{"entity_id":"fit-au-sa-state-market-set","record_type":"feed_in_tariff","jurisdiction":"AU-SA","data":{"id":"fit-au-sa-state-market-set","jurisdiction":"AU-SA","retailer":"State (market-set)","fit_c_per_kwh":"~8","structure":"Retailer-set; often capped first 8-14 kWh/day","notes":"No regulated minimum in SA."},"source_url":"https://www.energymadeeasy.gov.au","publisher":"State regulators + retailers","fetched_at":"2026-08-30T10:16:53.737362+00:00","confidence":"medium"},{"entity_id":"fit-au-tas-aurora-regulated","record_type":"feed_in_tariff","jurisdiction":"AU-TAS","data":{"id":"fit-au-tas-aurora-regulated","jurisdiction":"AU-TAS","retailer":"Aurora (regulated)","fit_c_per_kwh":9.276,"structure":"Flat regulated minimum","notes":"TAS Economic Regulator 1 Jul 2026; rose from ~8.9c. Recently changed."},"source_url":"https://www.energymadeeasy.gov.au","publisher":"State regulators + retailers","fetched_at":"2026-08-30T10:16:53.737362+00:00","confidence":"medium"},{"entity_id":"fit-au-vic-agl","record_type":"feed_in_tariff","jurisdiction":"AU-VIC","data":{"id":"fit-au-vic-agl","jurisdiction":"AU-VIC","retailer":"AGL","fit_c_per_kwh":8,"structure":"Flat (top rate promo)","notes":"Market table Jul-2026 - verify"},"source_url":"https://www.energymadeeasy.gov.au","publisher":"State regulators + retailers","fetched_at":"2026-08-30T10:16:53.737362+00:00","confidence":"medium"},{"entity_id":"fit-au-vic-energyaustralia","record_type":"feed_in_tariff","jurisdiction":"AU-VIC","data":{"id":"fit-au-vic-energyaustralia","jurisdiction":"AU-VIC","retailer":"EnergyAustralia","fit_c_per_kwh":8,"structure":"Flat","notes":"Market table Jul-2026 - verify"},"source_url":"https://www.energymadeeasy.gov.au","publisher":"State regulators + retailers","fetched_at":"2026-08-30T10:16:53.737362+00:00","confidence":"medium"},{"entity_id":"fit-au-vic-engie","record_type":"feed_in_tariff","jurisdiction":"AU-VIC","data":{"id":"fit-au-vic-engie","jurisdiction":"AU-VIC","retailer":"ENGIE","fit_c_per_kwh":8,"structure":"Flat","notes":"Market table Jul-2026 - verify"},"source_url":"https://www.energymadeeasy.gov.au","publisher":"State regulators + retailers","fetched_at":"2026-08-30T10:16:53.737362+00:00","confidence":"medium"},{"entity_id":"fit-au-vic-origin","record_type":"feed_in_tariff","jurisdiction":"AU-VIC","data":{"id":"fit-au-vic-origin","jurisdiction":"AU-VIC","retailer":"Origin","fit_c_per_kwh":5,"structure":"Flat","notes":"Market table Jul-2026 - verify"},"source_url":"https://www.energymadeeasy.gov.au","publisher":"State regulators + retailers","fetched_at":"2026-08-30T10:16:53.737362+00:00","confidence":"medium"},{"entity_id":"fit-au-vic-red-energy","record_type":"feed_in_tariff","jurisdiction":"AU-VIC","data":{"id":"fit-au-vic-red-energy","jurisdiction":"AU-VIC","retailer":"Red Energy","fit_c_per_kwh":1,"structure":"Flat (low-FiT)","notes":"Market table Jul-2026 - verify"},"source_url":"https://www.energymadeeasy.gov.au","publisher":"State regulators + retailers","fetched_at":"2026-08-30T10:16:53.737362+00:00","confidence":"medium"},{"entity_id":"fit-au-vic-state-minimum-deregulated","record_type":"feed_in_tariff","jurisdiction":"AU-VIC","data":{"id":"fit-au-vic-state-minimum-deregulated","jurisdiction":"AU-VIC","retailer":"State minimum (deregulated)","fit_c_per_kwh":"0.8-8","structure":"Deregulated - retailer-set, $0 legal floor","notes":"ESC stopped setting min FiT 1 Jul 2025 (was 3.3c flat). Recently changed."},"source_url":"https://www.energymadeeasy.gov.au","publisher":"State regulators + retailers","fetched_at":"2026-08-30T10:16:53.737362+00:00","confidence":"medium"},{"entity_id":"fit-au-wa-horizon-power-regional","record_type":"feed_in_tariff","jurisdiction":"AU-WA","data":{"id":"fit-au-wa-horizon-power-regional","jurisdiction":"AU-WA","retailer":"Horizon Power (regional)","fit_c_per_kwh":"10 peak / 2 off-peak; remote to 55.99","structure":"Time-varying by town","notes":"FY2026-27; legacy REBS closed to new."},"source_url":"https://www.energymadeeasy.gov.au","publisher":"State regulators + retailers","fetched_at":"2026-08-30T10:16:53.737362+00:00","confidence":"medium"},{"entity_id":"fit-au-wa-synergy-debs-regulated","record_type":"feed_in_tariff","jurisdiction":"AU-WA","data":{"id":"fit-au-wa-synergy-debs-regulated","jurisdiction":"AU-WA","retailer":"Synergy DEBS (regulated)","fit_c_per_kwh":"10 peak / 2 off-peak","structure":"Time-varying; peak 3-9pm; first 50 kWh/day; inverter <=5kW","notes":"Effective 1 Jul 2026."},"source_url":"https://www.energymadeeasy.gov.au","publisher":"State regulators + retailers","fetched_at":"2026-08-30T10:16:53.737362+00:00","confidence":"medium"},{"entity_id":"fit-jp-fit-geothermal-2025-t4-1","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-geothermal-2025-t4-1","jurisdiction":"JP","technology":"Geothermal — 地熱 新設","size_band":"1,000kW未満","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2025 (参考)","duration_years":15,"price_per_kwh":40.0,"price_raw":"40円","currency":"JPY","structure":"flat","notes":"reference row — the superseded year, shown for comparison; 出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-geothermal-2025-t4-2","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-geothermal-2025-t4-2","jurisdiction":"JP","technology":"Geothermal — 地熱 新設","size_band":"1,000kW以上 15,000kW未満","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2025 (参考)","duration_years":15,"price_per_kwh":40.0,"price_raw":"40円","currency":"JPY","structure":"flat","notes":"reference row — the superseded year, shown for comparison; 出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-geothermal-2025-t4-3","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-geothermal-2025-t4-3","jurisdiction":"JP","technology":"Geothermal — 地熱 新設","size_band":"15,000kW以上 30,000kW未満","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2025 (参考)","duration_years":15,"price_per_kwh":26.0,"price_raw":"26円","currency":"JPY","structure":"flat","notes":"reference row — the superseded year, shown for comparison; 出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-geothermal-2025-t4-4","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-geothermal-2025-t4-4","jurisdiction":"JP","technology":"Geothermal — 地熱 新設","size_band":"30,000kW以上","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2025 (参考)","duration_years":15,"price_per_kwh":26.0,"price_raw":"26円","currency":"JPY","structure":"flat","notes":"reference row — the superseded year, shown for comparison; 出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-geothermal-2025-t5-1","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-geothermal-2025-t5-1","jurisdiction":"JP","technology":"Geothermal — 地熱 全設備更新型","size_band":"1,000kW未満","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2025 (参考)","duration_years":15,"price_per_kwh":30.0,"price_raw":"30円","currency":"JPY","structure":"flat","notes":"reference row — the superseded year, shown for comparison; 出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-geothermal-2025-t5-2","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-geothermal-2025-t5-2","jurisdiction":"JP","technology":"Geothermal — 地熱 全設備更新型","size_band":"1,000kW以上 15,000kW未満","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2025 (参考)","duration_years":15,"price_per_kwh":30.0,"price_raw":"30円","currency":"JPY","structure":"flat","notes":"reference row — the superseded year, shown for comparison; 出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-geothermal-2025-t5-3","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-geothermal-2025-t5-3","jurisdiction":"JP","technology":"Geothermal — 地熱 全設備更新型","size_band":"15,000kW以上 30,000kW未満","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2025 (参考)","duration_years":15,"price_per_kwh":20.0,"price_raw":"20円","currency":"JPY","structure":"flat","notes":"reference row — the superseded year, shown for comparison; 出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-geothermal-2025-t5-4","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-geothermal-2025-t5-4","jurisdiction":"JP","technology":"Geothermal — 地熱 全設備更新型","size_band":"30,000kW以上","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2025 (参考)","duration_years":15,"price_per_kwh":20.0,"price_raw":"20円","currency":"JPY","structure":"flat","notes":"reference row — the superseded year, shown for comparison; 出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-geothermal-2025-t6-1","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-geothermal-2025-t6-1","jurisdiction":"JP","technology":"Geothermal — 地熱 地下整備流用型","size_band":"1,000kW未満","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2025 (参考)","duration_years":15,"price_per_kwh":19.0,"price_raw":"19円","currency":"JPY","structure":"flat","notes":"reference row — the superseded year, shown for comparison; 出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-geothermal-2025-t6-2","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-geothermal-2025-t6-2","jurisdiction":"JP","technology":"Geothermal — 地熱 地下整備流用型","size_band":"1,000kW以上 15,000kW未満","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2025 (参考)","duration_years":15,"price_per_kwh":19.0,"price_raw":"19円","currency":"JPY","structure":"flat","notes":"reference row — the superseded year, shown for comparison; 出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-geothermal-2025-t6-3","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-geothermal-2025-t6-3","jurisdiction":"JP","technology":"Geothermal — 地熱 地下整備流用型","size_band":"15,000kW以上 30,000kW未満","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2025 (参考)","duration_years":15,"price_per_kwh":12.0,"price_raw":"12円","currency":"JPY","structure":"flat","notes":"reference row — the superseded year, shown for comparison; 出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-geothermal-2025-t6-4","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-geothermal-2025-t6-4","jurisdiction":"JP","technology":"Geothermal — 地熱 地下整備流用型","size_band":"30,000kW以上","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2025 (参考)","duration_years":15,"price_per_kwh":12.0,"price_raw":"12円","currency":"JPY","structure":"flat","notes":"reference row — the superseded year, shown for comparison; 出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-geothermal-2026-t4-1","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-geothermal-2026-t4-1","jurisdiction":"JP","technology":"Geothermal — 地熱 新設","size_band":"1,000kW未満","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2026","duration_years":15,"price_per_kwh":40.0,"price_raw":"40円","currency":"JPY","structure":"flat","notes":"出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-geothermal-2026-t4-2","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-geothermal-2026-t4-2","jurisdiction":"JP","technology":"Geothermal — 地熱 新設","size_band":"1,000kW以上 15,000kW未満","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2026","duration_years":15,"price_raw":"出力に応じて価格が連続的に変化※11","currency":"JPY","structure":"capacity-dependent formula","notes":"price varies continuously with output; 出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-geothermal-2026-t4-3","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-geothermal-2026-t4-3","jurisdiction":"JP","technology":"Geothermal — 地熱 新設","size_band":"15,000kW以上 30,000kW未満","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2026","duration_years":15,"price_raw":"出力に応じて価格が連続的に変化※11","currency":"JPY","structure":"capacity-dependent formula","notes":"price varies continuously with output; 出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-geothermal-2026-t4-4","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-geothermal-2026-t4-4","jurisdiction":"JP","technology":"Geothermal — 地熱 新設","size_band":"30,000kW以上","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2026","duration_years":15,"price_per_kwh":26.0,"price_raw":"26円","currency":"JPY","structure":"flat","notes":"出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-geothermal-2026-t5-1","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-geothermal-2026-t5-1","jurisdiction":"JP","technology":"Geothermal — 地熱 全設備更新型","size_band":"1,000kW未満","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2026","duration_years":15,"price_per_kwh":30.0,"price_raw":"30円","currency":"JPY","structure":"flat","notes":"出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-geothermal-2026-t5-2","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-geothermal-2026-t5-2","jurisdiction":"JP","technology":"Geothermal — 地熱 全設備更新型","size_band":"1,000kW以上 15,000kW未満","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2026","duration_years":15,"price_raw":"出力に応じて価格が連続的に変化※11","currency":"JPY","structure":"capacity-dependent formula","notes":"price varies continuously with output; 出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-geothermal-2026-t5-3","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-geothermal-2026-t5-3","jurisdiction":"JP","technology":"Geothermal — 地熱 全設備更新型","size_band":"15,000kW以上 30,000kW未満","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2026","duration_years":15,"price_raw":"出力に応じて価格が連続的に変化※11","currency":"JPY","structure":"capacity-dependent formula","notes":"price varies continuously with output; 出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-geothermal-2026-t5-4","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-geothermal-2026-t5-4","jurisdiction":"JP","technology":"Geothermal — 地熱 全設備更新型","size_band":"30,000kW以上","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2026","duration_years":15,"price_per_kwh":20.0,"price_raw":"20円","currency":"JPY","structure":"flat","notes":"出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-geothermal-2026-t6-1","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-geothermal-2026-t6-1","jurisdiction":"JP","technology":"Geothermal — 地熱 地下整備流用型","size_band":"1,000kW未満","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2026","duration_years":15,"price_per_kwh":19.0,"price_raw":"19円","currency":"JPY","structure":"flat","notes":"出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-geothermal-2026-t6-2","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-geothermal-2026-t6-2","jurisdiction":"JP","technology":"Geothermal — 地熱 地下整備流用型","size_band":"1,000kW以上 15,000kW未満","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2026","duration_years":15,"price_raw":"出力に応じて価格が連続的に変化※11","currency":"JPY","structure":"capacity-dependent formula","notes":"price varies continuously with output; 出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-geothermal-2026-t6-3","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-geothermal-2026-t6-3","jurisdiction":"JP","technology":"Geothermal — 地熱 地下整備流用型","size_band":"15,000kW以上 30,000kW未満","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2026","duration_years":15,"price_raw":"出力に応じて価格が連続的に変化※11","currency":"JPY","structure":"capacity-dependent formula","notes":"price varies continuously with output; 出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-geothermal-2026-t6-4","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-geothermal-2026-t6-4","jurisdiction":"JP","technology":"Geothermal — 地熱 地下整備流用型","size_band":"30,000kW以上","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2026","duration_years":15,"price_per_kwh":12.0,"price_raw":"12円","currency":"JPY","structure":"flat","notes":"出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-hydro-2025-t2-1","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-hydro-2025-t2-1","jurisdiction":"JP","technology":"Hydro — 水力","size_band":"5,000kW以上 30,000kW未満","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2025 (参考)","duration_years":20,"price_per_kwh":16.0,"price_raw":"16円","currency":"JPY","structure":"flat","notes":"reference row — the superseded year, shown for comparison; 出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-hydro-2025-t2-2","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-hydro-2025-t2-2","jurisdiction":"JP","technology":"Hydro — 水力","size_band":"1,000kW以上 5,000kW未満","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2025 (参考)","duration_years":20,"price_per_kwh":23.0,"price_raw":"23円","currency":"JPY","structure":"flat","notes":"reference row — the superseded year, shown for comparison; 出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-hydro-2025-t2-3","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-hydro-2025-t2-3","jurisdiction":"JP","technology":"Hydro — 水力","size_band":"200kW以上 1,000kW未満","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2025 (参考)","duration_years":20,"price_per_kwh":29.0,"price_raw":"29円","currency":"JPY","structure":"flat","notes":"reference row — the superseded year, shown for comparison; 出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-hydro-2025-t2-4","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-hydro-2025-t2-4","jurisdiction":"JP","technology":"Hydro — 水力","size_band":"200kW未満","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2025 (参考)","duration_years":20,"price_per_kwh":34.0,"price_raw":"34円","currency":"JPY","structure":"flat","notes":"reference row — the superseded year, shown for comparison; 出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-hydro-2025-t3-1","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-hydro-2025-t3-1","jurisdiction":"JP","technology":"Hydro — 水力(既設導水路活用型)","size_band":"5,000kW以上 30,000kW未満","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2025 (参考)","duration_years":20,"price_per_kwh":9.0,"price_raw":"9円","currency":"JPY","structure":"flat","notes":"reference row — the superseded year, shown for comparison; 出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-hydro-2025-t3-2","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-hydro-2025-t3-2","jurisdiction":"JP","technology":"Hydro — 水力(既設導水路活用型)","size_band":"1,000kW以上 5,000kW未満","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2025 (参考)","duration_years":20,"price_per_kwh":14.0,"price_raw":"14円","currency":"JPY","structure":"flat","notes":"reference row — the superseded year, shown for comparison; 出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-hydro-2025-t3-3","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-hydro-2025-t3-3","jurisdiction":"JP","technology":"Hydro — 水力(既設導水路活用型)","size_band":"200kW以上 1,000kW未満","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2025 (参考)","duration_years":20,"price_per_kwh":21.0,"price_raw":"21円","currency":"JPY","structure":"flat","notes":"reference row — the superseded year, shown for comparison; 出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-hydro-2025-t3-4","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-hydro-2025-t3-4","jurisdiction":"JP","technology":"Hydro — 水力(既設導水路活用型)","size_band":"200kW未満","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2025 (参考)","duration_years":20,"price_per_kwh":25.0,"price_raw":"25円","currency":"JPY","structure":"flat","notes":"reference row — the superseded year, shown for comparison; 出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-hydro-2026-t2-1","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-hydro-2026-t2-1","jurisdiction":"JP","technology":"Hydro — 水力","size_band":"5,000kW以上 30,000kW未満","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2026","duration_years":20,"price_per_kwh":16.0,"price_raw":"16円","currency":"JPY","structure":"flat","notes":"出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-hydro-2026-t2-2","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-hydro-2026-t2-2","jurisdiction":"JP","technology":"Hydro — 水力","size_band":"1,000kW以上 5,000kW未満","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2026","duration_years":20,"price_per_kwh":23.0,"price_raw":"23円","currency":"JPY","structure":"flat","notes":"出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-hydro-2026-t2-3","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-hydro-2026-t2-3","jurisdiction":"JP","technology":"Hydro — 水力","size_band":"200kW以上 1,000kW未満","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2026","duration_years":20,"price_per_kwh":29.0,"price_raw":"29円","currency":"JPY","structure":"flat","notes":"出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-hydro-2026-t2-4","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-hydro-2026-t2-4","jurisdiction":"JP","technology":"Hydro — 水力","size_band":"200kW未満","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2026","duration_years":20,"price_per_kwh":34.0,"price_raw":"34円","currency":"JPY","structure":"flat","notes":"出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-hydro-2026-t3-1","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-hydro-2026-t3-1","jurisdiction":"JP","technology":"Hydro — 水力(既設導水路活用型)","size_band":"5,000kW以上 30,000kW未満","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2026","duration_years":20,"price_per_kwh":9.0,"price_raw":"9円","currency":"JPY","structure":"flat","notes":"出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-hydro-2026-t3-2","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-hydro-2026-t3-2","jurisdiction":"JP","technology":"Hydro — 水力(既設導水路活用型)","size_band":"1,000kW以上 5,000kW未満","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2026","duration_years":20,"price_per_kwh":14.0,"price_raw":"14円","currency":"JPY","structure":"flat","notes":"出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-hydro-2026-t3-3","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-hydro-2026-t3-3","jurisdiction":"JP","technology":"Hydro — 水力(既設導水路活用型)","size_band":"200kW以上 1,000kW未満","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2026","duration_years":20,"price_per_kwh":21.0,"price_raw":"21円","currency":"JPY","structure":"flat","notes":"出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-hydro-2026-t3-4","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-hydro-2026-t3-4","jurisdiction":"JP","technology":"Hydro — 水力(既設導水路活用型)","size_band":"200kW未満","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2026","duration_years":20,"price_per_kwh":25.0,"price_raw":"25円","currency":"JPY","structure":"flat","notes":"出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-hydro-2027-t2-1","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-hydro-2027-t2-1","jurisdiction":"JP","technology":"Hydro — 水力","size_band":"5,000kW以上 30,000kW未満","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2027","duration_years":20,"price_raw":"－","currency":"JPY","notes":"not published for this band/year; 出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-hydro-2027-t2-2","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-hydro-2027-t2-2","jurisdiction":"JP","technology":"Hydro — 水力","size_band":"1,000kW以上 5,000kW未満","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2027","duration_years":20,"price_raw":"－","currency":"JPY","notes":"not published for this band/year; 出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-hydro-2027-t2-3","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-hydro-2027-t2-3","jurisdiction":"JP","technology":"Hydro — 水力","size_band":"200kW以上 1,000kW未満","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2027","duration_years":20,"price_per_kwh":29.0,"price_raw":"29円","currency":"JPY","structure":"flat","notes":"出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-hydro-2027-t2-4","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-hydro-2027-t2-4","jurisdiction":"JP","technology":"Hydro — 水力","size_band":"200kW未満","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2027","duration_years":20,"price_per_kwh":34.0,"price_raw":"34円","currency":"JPY","structure":"flat","notes":"出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-hydro-2027-t3-1","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-hydro-2027-t3-1","jurisdiction":"JP","technology":"Hydro — 水力(既設導水路活用型)","size_band":"5,000kW以上 30,000kW未満","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2027","duration_years":20,"price_raw":"－","currency":"JPY","notes":"not published for this band/year; 出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-hydro-2027-t3-2","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-hydro-2027-t3-2","jurisdiction":"JP","technology":"Hydro — 水力(既設導水路活用型)","size_band":"1,000kW以上 5,000kW未満","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2027","duration_years":20,"price_raw":"－","currency":"JPY","notes":"not published for this band/year; 出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-hydro-2027-t3-3","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-hydro-2027-t3-3","jurisdiction":"JP","technology":"Hydro — 水力(既設導水路活用型)","size_band":"200kW以上 1,000kW未満","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2027","duration_years":20,"price_per_kwh":21.0,"price_raw":"21円","currency":"JPY","structure":"flat","notes":"出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-hydro-2027-t3-4","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-hydro-2027-t3-4","jurisdiction":"JP","technology":"Hydro — 水力(既設導水路活用型)","size_band":"200kW未満","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2027","duration_years":20,"price_per_kwh":25.0,"price_raw":"25円","currency":"JPY","structure":"flat","notes":"出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-other-2025-t7-1","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-other-2025-t7-1","jurisdiction":"JP","technology":"Biomass — バイオマス","size_band":"メタン発酵ガス （バイオマス由来）","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2025 (参考)","duration_years":20,"price_per_kwh":35.0,"price_raw":"35円","currency":"JPY","structure":"flat","notes":"reference row — the superseded year, shown for comparison; 出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-other-2025-t7-2","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-other-2025-t7-2","jurisdiction":"JP","technology":"Biomass — バイオマス","size_band":"間伐材等由来の木質バイオマス / 2,000kW以上","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2025 (参考)","duration_years":20,"price_per_kwh":32.0,"price_raw":"32円","currency":"JPY","structure":"flat","notes":"reference row — the superseded year, shown for comparison; 出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-other-2025-t7-3","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-other-2025-t7-3","jurisdiction":"JP","technology":"Biomass — バイオマス","size_band":"間伐材等由来の木質バイオマス / 2,000kW未満","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2025 (参考)","duration_years":20,"price_per_kwh":40.0,"price_raw":"40円","currency":"JPY","structure":"flat","notes":"reference row — the superseded year, shown for comparison; 出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-other-2025-t8-1","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-other-2025-t8-1","jurisdiction":"JP","technology":"Biomass — バイオマス","size_band":"一般木質バイオマス・農産物の収穫に伴って生じるバイオマス固体燃料 / 10,000kW以上 （入札制度適用区分)","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2025 (参考)","duration_years":20,"price_raw":"入札制度により決定 （第8回18.2円）","currency":"JPY","structure":"auction","notes":"set by auction; cleared at R8 18.2円; reference row — the superseded year, shown for comparison; 出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-other-2025-t8-2","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-other-2025-t8-2","jurisdiction":"JP","technology":"Biomass — バイオマス","size_band":"一般木質バイオマス・農産物の収穫に伴って生じるバイオマス固体燃料 / 10,000kW未満","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2025 (参考)","duration_years":20,"price_per_kwh":24.0,"price_raw":"24円","currency":"JPY","structure":"flat","notes":"reference row — the superseded year, shown for comparison; 出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-other-2025-t8-3","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-other-2025-t8-3","jurisdiction":"JP","technology":"Biomass — バイオマス","size_band":"農産物の収穫に伴って生じるバイオマス液体燃料（入札制度適用区分）","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2025 (参考)","duration_years":20,"price_raw":"入札制度により決定 （第8回18.2円）","currency":"JPY","structure":"auction","notes":"set by auction; cleared at R8 18.2円; reference row — the superseded year, shown for comparison; 出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-other-2025-t8-4","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-other-2025-t8-4","jurisdiction":"JP","technology":"Biomass — バイオマス","size_band":"建設資材廃棄物","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2025 (参考)","duration_years":20,"price_per_kwh":13.0,"price_raw":"13円","currency":"JPY","structure":"flat","notes":"reference row — the superseded year, shown for comparison; 出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-other-2025-t8-5","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-other-2025-t8-5","jurisdiction":"JP","technology":"Biomass — バイオマス","size_band":"一般廃棄物その他バイオマス","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2025 (参考)","duration_years":20,"price_per_kwh":17.0,"price_raw":"17円","currency":"JPY","structure":"flat","notes":"reference row — the superseded year, shown for comparison; 出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-other-2026-t7-1","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-other-2026-t7-1","jurisdiction":"JP","technology":"Biomass — バイオマス","size_band":"メタン発酵ガス （バイオマス由来）","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2026","duration_years":20,"price_per_kwh":35.0,"price_raw":"35円","currency":"JPY","structure":"flat","notes":"出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-other-2026-t7-2","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-other-2026-t7-2","jurisdiction":"JP","technology":"Biomass — バイオマス","size_band":"間伐材等由来の木質バイオマス / 2,000kW以上","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2026","duration_years":20,"price_per_kwh":32.0,"price_raw":"32円","currency":"JPY","structure":"flat","notes":"出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-other-2026-t7-3","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-other-2026-t7-3","jurisdiction":"JP","technology":"Biomass — バイオマス","size_band":"間伐材等由来の木質バイオマス / 2,000kW未満","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2026","duration_years":20,"price_per_kwh":40.0,"price_raw":"40円","currency":"JPY","structure":"flat","notes":"出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-other-2026-t8-1","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-other-2026-t8-1","jurisdiction":"JP","technology":"Biomass — バイオマス","size_band":"一般木質バイオマス・農産物の収穫に伴って生じるバイオマス固体燃料 / 10,000kW以上 （入札制度適用区分)","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2026","duration_years":20,"price_raw":"※14","currency":"JPY","notes":"deferred to a footnote; not yet set; 出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-other-2026-t8-2","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-other-2026-t8-2","jurisdiction":"JP","technology":"Biomass — バイオマス","size_band":"一般木質バイオマス・農産物の収穫に伴って生じるバイオマス固体燃料 / 10,000kW未満","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2026","duration_years":20,"price_per_kwh":24.0,"price_raw":"24円","currency":"JPY","structure":"flat","notes":"出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-other-2026-t8-3","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-other-2026-t8-3","jurisdiction":"JP","technology":"Biomass — バイオマス","size_band":"農産物の収穫に伴って生じるバイオマス液体燃料（入札制度適用区分）","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2026","duration_years":20,"price_raw":"※14","currency":"JPY","notes":"deferred to a footnote; not yet set; 出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-other-2026-t8-4","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-other-2026-t8-4","jurisdiction":"JP","technology":"Biomass — バイオマス","size_band":"建設資材廃棄物","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2026","duration_years":20,"price_per_kwh":13.0,"price_raw":"13円","currency":"JPY","structure":"flat","notes":"出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-other-2026-t8-5","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-other-2026-t8-5","jurisdiction":"JP","technology":"Biomass — バイオマス","size_band":"一般廃棄物その他バイオマス","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2026","duration_years":20,"price_per_kwh":17.0,"price_raw":"17円","currency":"JPY","structure":"flat","notes":"出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-solar-2025-0409-t0-1","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-solar-2025-0409-t0-1","jurisdiction":"JP","technology":"Solar — 太陽光","size_band":"入札制度適用区分","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2025 (4月～9月） （参考)","duration_years":20,"price_raw":"入札制度により決定※4 (第24回8.90円/第25回8.83円/ 第26回8.75円/第27回8.68円）","currency":"JPY","structure":"auction","notes":"set by auction; cleared at R24 8.9円, R25 8.83円, R26 8.75円, R27 8.68円; reference row — the superseded year, shown for comparison; 出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-solar-2025-0409-t0-2","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-solar-2025-0409-t0-2","jurisdiction":"JP","technology":"Solar — 太陽光","size_band":"50kW以上 （地上設置） （入札制度対象外）","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2025 (4月～9月） （参考)","duration_years":20,"price_per_kwh":8.9,"price_raw":"8.9円","currency":"JPY","structure":"flat","notes":"reference row — the superseded year, shown for comparison; 出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-solar-2025-0409-t0-3","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-solar-2025-0409-t0-3","jurisdiction":"JP","technology":"Solar — 太陽光","size_band":"10kW以上 50kW未満","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2025 (4月～9月） （参考)","duration_years":20,"price_per_kwh":10.0,"price_raw":"10円","currency":"JPY","structure":"flat","notes":"reference row — the superseded year, shown for comparison; 出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"fit-jp-fit-solar-2025-0409-t0-4","record_type":"feed_in_tariff","jurisdiction":"JP","data":{"id":"jp-fit-solar-2025-0409-t0-4","jurisdiction":"JP","technology":"Solar — 太陽光","size_band":"10kW以上 （屋根設置）","scheme":"FIT/FIP 調達価格・基準価格","period":"FY2025 (4月～9月） （参考)","duration_years":20,"price_per_kwh":11.5,"price_raw":"11.5円","currency":"JPY","structure":"flat","notes":"reference row — the superseded year, shown for comparison; 出典：資源エネルギー庁ウェブサイト（https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html）; Reshaped from the published table by AI Root; not published in this form by 資源エネルギー庁. 加工して作成."},"source_url":"https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/fit_kakaku.html","publisher":"経済産業省 資源エネルギー庁 (ANRE)","fetched_at":"2026-09-12T14:23:44.816981+00:00","confidence":"high"},{"entity_id":"gridemis-jp-fy2018","record_type":"grid_emissions","jurisdiction":"JP","data":{"region":"JP","emissions_intensity_kg_mwh":460.9,"derived":true,"method":"(112,622 10^3 tC × 44/12) ÷ (3,225,499 TJ ÷ 3.6) — row #240000 事業用発電, columns $1400 合計 (炭素単位表) and $1200 電力 (エネルギー単位表), 総合エネルギー統計 2018年度簡易表. 加工して作成.","scope_note":"事業用発電 only — utility power generation. Excludes 自家用発電 (industrial self-generation, row #250000) and transmission losses. Renewables and nuclear carry zero carbon in METI's carbon sheet, so this is a generation-side fuel-combustion figure. NOT the official 排出係数, which MOE/METI publish per retailer on a 基礎/調整後 basis.","emissions_kt":412947.9,"energy_gwh":895971.9,"period":"FY2018","as_at":"2019-03-31"},"source_url":"https://www.e-stat.go.jp/stat-search/files?page=1&layout=dataset&toukei=00551010","publisher":"経済産業省 資源エネルギー庁 via e-Stat (総合エネルギー統計) — 加工: AI Root","fetched_at":"2026-09-12T14:23:44.870471+00:00","confidence":"medium"},{"entity_id":"gridemis-jp-fy2019","record_type":"grid_emissions","jurisdiction":"JP","data":{"region":"JP","emissions_intensity_kg_mwh":453.6,"derived":true,"method":"(107,290 10^3 tC × 44/12) ÷ (3,122,481 TJ ÷ 3.6) — row #240000 事業用発電, columns $1400 合計 (炭素単位表) and $1200 電力 (エネルギー単位表), 総合エネルギー統計 2019年度簡易表. 加工して作成.","scope_note":"事業用発電 only — utility power generation. Excludes 自家用発電 (industrial self-generation, row #250000) and transmission losses. Renewables and nuclear carry zero carbon in METI's carbon sheet, so this is a generation-side fuel-combustion figure. NOT the official 排出係数, which MOE/METI publish per retailer on a 基礎/調整後 basis.","emissions_kt":393394.9,"energy_gwh":867356.0,"period":"FY2019","as_at":"2020-03-31"},"source_url":"https://www.e-stat.go.jp/stat-search/files?page=1&layout=dataset&toukei=00551010","publisher":"経済産業省 資源エネルギー庁 via e-Stat (総合エネルギー統計) — 加工: AI Root","fetched_at":"2026-09-12T14:23:44.870471+00:00","confidence":"medium"},{"entity_id":"gridemis-jp-fy2020","record_type":"grid_emissions","jurisdiction":"JP","data":{"region":"JP","emissions_intensity_kg_mwh":460.6,"derived":true,"method":"(106,187 10^3 tC × 44/12) ÷ (3,043,355 TJ ÷ 3.6) — row #240000 事業用発電, columns $1400 合計 (炭素単位表) and $1200 電力 (エネルギー単位表), 総合エネルギー統計 2020年度簡易表. 加工して作成.","scope_note":"事業用発電 only — utility power generation. Excludes 自家用発電 (industrial self-generation, row #250000) and transmission losses. Renewables and nuclear carry zero carbon in METI's carbon sheet, so this is a generation-side fuel-combustion figure. NOT the official 排出係数, which MOE/METI publish per retailer on a 基礎/調整後 basis.","emissions_kt":389353.3,"energy_gwh":845376.3,"period":"FY2020","as_at":"2021-03-31"},"source_url":"https://www.e-stat.go.jp/stat-search/files?page=1&layout=dataset&toukei=00551010","publisher":"経済産業省 資源エネルギー庁 via e-Stat (総合エネルギー統計) — 加工: AI Root","fetched_at":"2026-09-12T14:23:44.870471+00:00","confidence":"medium"},{"entity_id":"gridemis-jp-fy2021","record_type":"grid_emissions","jurisdiction":"JP","data":{"region":"JP","emissions_intensity_kg_mwh":454.9,"derived":true,"method":"(106,987 10^3 tC × 44/12) ÷ (3,104,380 TJ ÷ 3.6) — row #240000 事業用発電, columns $1400 合計 (炭素単位表) and $1200 電力 (エネルギー単位表), 総合エネルギー統計 2021年度簡易表. 加工して作成.","scope_note":"事業用発電 only — utility power generation. Excludes 自家用発電 (industrial self-generation, row #250000) and transmission losses. Renewables and nuclear carry zero carbon in METI's carbon sheet, so this is a generation-side fuel-combustion figure. NOT the official 排出係数, which MOE/METI publish per retailer on a 基礎/調整後 basis.","emissions_kt":392285.4,"energy_gwh":862327.8,"period":"FY2021","as_at":"2022-03-31"},"source_url":"https://www.e-stat.go.jp/stat-search/files?page=1&layout=dataset&toukei=00551010","publisher":"経済産業省 資源エネルギー庁 via e-Stat (総合エネルギー統計) — 加工: AI Root","fetched_at":"2026-09-12T14:23:44.870471+00:00","confidence":"medium"},{"entity_id":"gridemis-jp-fy2022","record_type":"grid_emissions","jurisdiction":"JP","data":{"region":"JP","emissions_intensity_kg_mwh":460.3,"derived":true,"method":"(104,667 10^3 tC × 44/12) ÷ (3,001,704 TJ ÷ 3.6) — row #240000 事業用発電, columns $1400 合計 (炭素単位表) and $1200 電力 (エネルギー単位表), 総合エネルギー統計 2022年度簡易表. 加工して作成.","scope_note":"事業用発電 only — utility power generation. Excludes 自家用発電 (industrial self-generation, row #250000) and transmission losses. Renewables and nuclear carry zero carbon in METI's carbon sheet, so this is a generation-side fuel-combustion figure. NOT the official 排出係数, which MOE/METI publish per retailer on a 基礎/調整後 basis.","emissions_kt":383780.6,"energy_gwh":833806.6,"period":"FY2022","as_at":"2023-03-31"},"source_url":"https://www.e-stat.go.jp/stat-search/files?page=1&layout=dataset&toukei=00551010","publisher":"経済産業省 資源エネルギー庁 via e-Stat (総合エネルギー統計) — 加工: AI Root","fetched_at":"2026-09-12T14:23:44.870471+00:00","confidence":"medium"},{"entity_id":"gridemis-jp-fy2023","record_type":"grid_emissions","jurisdiction":"JP","data":{"region":"JP","emissions_intensity_kg_mwh":441.4,"derived":true,"method":"(99,032 10^3 tC × 44/12) ÷ (2,961,597 TJ ÷ 3.6) — row #240000 事業用発電, columns $1400 合計 (炭素単位表) and $1200 電力 (エネルギー単位表), 総合エネルギー統計 2023年度簡易表. 加工して作成.","scope_note":"事業用発電 only — utility power generation. Excludes 自家用発電 (industrial self-generation, row #250000) and transmission losses. Renewables and nuclear carry zero carbon in METI's carbon sheet, so this is a generation-side fuel-combustion figure. NOT the official 排出係数, which MOE/METI publish per retailer on a 基礎/調整後 basis.","emissions_kt":363116.6,"energy_gwh":822665.9,"period":"FY2023","as_at":"2024-03-31"},"source_url":"https://www.e-stat.go.jp/stat-search/files?page=1&layout=dataset&toukei=00551010","publisher":"経済産業省 資源エネルギー庁 via e-Stat (総合エネルギー統計) — 加工: AI Root","fetched_at":"2026-09-12T14:23:44.870471+00:00","confidence":"medium"},{"entity_id":"gridemis-jp-fy2024","record_type":"grid_emissions","jurisdiction":"JP","data":{"region":"JP","emissions_intensity_kg_mwh":433.9,"derived":true,"method":"(98,165 10^3 tC × 44/12) ÷ (2,986,123 TJ ÷ 3.6) — row #240000 事業用発電, columns $1400 合計 (炭素単位表) and $1200 電力 (エネルギー単位表), 総合エネルギー統計 2024年度簡易表. 加工して作成.","scope_note":"事業用発電 only — utility power generation. Excludes 自家用発電 (industrial self-generation, row #250000) and transmission losses. Renewables and nuclear carry zero carbon in METI's carbon sheet, so this is a generation-side fuel-combustion figure. NOT the official 排出係数, which MOE/METI publish per retailer on a 基礎/調整後 basis.","emissions_kt":359939.8,"energy_gwh":829478.7,"period":"FY2024","as_at":"2025-03-31"},"source_url":"https://www.e-stat.go.jp/stat-search/files?page=1&layout=dataset&toukei=00551010","publisher":"経済産業省 資源エネルギー庁 via e-Stat (総合エネルギー統計) — 加工: AI Root","fetched_at":"2026-09-12T14:23:44.870471+00:00","confidence":"medium"},{"entity_id":"gridmix-jp-grid-mix-fy2018","record_type":"grid_mix","jurisdiction":"JP","data":{"region":"Japan","period":"FY2018 (Apr 2018 – Mar 2019)","renewable_pct":10.18,"coal_pct":33.0,"largest_renewable":"Hydro","by_fuel":[{"fuel":"LNG","asset_class":"gas","gwh":382265.9},{"fuel":"Coal","asset_class":"coal","gwh":304560.8},{"fuel":"Hydro","asset_class":"hydro","gwh":76465.7},{"fuel":"Nuclear","asset_class":"other","gwh":64929.2},{"fuel":"Oil","asset_class":"other","gwh":24189.2},{"fuel":"Other gas","asset_class":"gas","gwh":22139.3},{"fuel":"Other thermal","asset_class":"other","gwh":17260.3},{"fuel":"Pumped hydro","asset_class":"pumped_hydro","gwh":9663.5},{"fuel":"Solar","asset_class":"solar","gwh":9503.5},{"fuel":"Wind","asset_class":"wind","gwh":5778.0},{"fuel":"Geothermal","asset_class":"geothermal","gwh":2241.2}],"total_gwh":922949.0,"basis":"Generated (発電端), NOT sent-out — the register states that sent-out totals fold in a battery-discharge component. Survey covers licensed 電気事業者 only. `renewable_pct` is the register's own 新エネルギー等計 plus conventional hydro, and therefore EXCLUDES biomass and waste, which sit outside that grouping; a headline Japanese renewables share quoted elsewhere will be higher and is not computed this way.","as_at":"2019-03-31"},"source_url":"https://www.e-stat.go.jp/stat-search/files?page=1&layout=dataset&toukei=00551011","publisher":"経済産業省 via e-Stat (総合エネルギー統計補足調査)","fetched_at":"2026-09-12T14:23:44.813293+00:00","confidence":"high"},{"entity_id":"gridmix-jp-grid-mix-fy2019","record_type":"grid_mix","jurisdiction":"JP","data":{"region":"Japan","period":"FY2019 (Apr 2019 – Mar 2020)","renewable_pct":10.65,"coal_pct":33.4,"largest_renewable":"Hydro","by_fuel":[{"fuel":"LNG","asset_class":"gas","gwh":363622.5},{"fuel":"Coal","asset_class":"coal","gwh":301667.2},{"fuel":"Hydro","asset_class":"hydro","gwh":75228.0},{"fuel":"Nuclear","asset_class":"other","gwh":63779.0},{"fuel":"Other gas","asset_class":"gas","gwh":26326.4},{"fuel":"Other thermal","asset_class":"other","gwh":22301.0},{"fuel":"Oil","asset_class":"other","gwh":16603.9},{"fuel":"Solar","asset_class":"solar","gwh":12221.5},{"fuel":"Pumped hydro","asset_class":"pumped_hydro","gwh":9314.8},{"fuel":"Wind","asset_class":"wind","gwh":6489.2},{"fuel":"Geothermal","asset_class":"geothermal","gwh":2235.0}],"total_gwh":903195.9,"basis":"Generated (発電端), NOT sent-out — the register states that sent-out totals fold in a battery-discharge component. Survey covers licensed 電気事業者 only. `renewable_pct` is the register's own 新エネルギー等計 plus conventional hydro, and therefore EXCLUDES biomass and waste, which sit outside that grouping; a headline Japanese renewables share quoted elsewhere will be higher and is not computed this way.","as_at":"2020-03-31"},"source_url":"https://www.e-stat.go.jp/stat-search/files?page=1&layout=dataset&toukei=00551011","publisher":"経済産業省 via e-Stat (総合エネルギー統計補足調査)","fetched_at":"2026-09-12T14:23:44.813293+00:00","confidence":"high"},{"entity_id":"gridmix-jp-grid-mix-fy2020","record_type":"grid_mix","jurisdiction":"JP","data":{"region":"Japan","period":"FY2020 (Apr 2020 – Mar 2021)","renewable_pct":11.37,"coal_pct":33.21,"largest_renewable":"Hydro","by_fuel":[{"fuel":"LNG","asset_class":"gas","gwh":364512.6},{"fuel":"Coal","asset_class":"coal","gwh":294302.4},{"fuel":"Hydro","asset_class":"hydro","gwh":74227.4},{"fuel":"Nuclear","asset_class":"other","gwh":39146.9},{"fuel":"Other thermal","asset_class":"other","gwh":30556.3},{"fuel":"Other gas","asset_class":"gas","gwh":27349.4},{"fuel":"Oil","asset_class":"other","gwh":16751.3},{"fuel":"Solar","asset_class":"solar","gwh":16402.9},{"fuel":"Pumped hydro","asset_class":"pumped_hydro","gwh":11119.8},{"fuel":"Wind","asset_class":"wind","gwh":7837.9},{"fuel":"Geothermal","asset_class":"geothermal","gwh":2263.0}],"total_gwh":886071.6,"basis":"Generated (発電端), NOT sent-out — the register states that sent-out totals fold in a battery-discharge component. Survey covers licensed 電気事業者 only. `renewable_pct` is the register's own 新エネルギー等計 plus conventional hydro, and therefore EXCLUDES biomass and waste, which sit outside that grouping; a headline Japanese renewables share quoted elsewhere will be higher and is not computed this way.","as_at":"2021-03-31"},"source_url":"https://www.e-stat.go.jp/stat-search/files?page=1&layout=dataset&toukei=00551011","publisher":"経済産業省 via e-Stat (総合エネルギー統計補足調査)","fetched_at":"2026-09-12T14:23:44.813293+00:00","confidence":"high"},{"entity_id":"gridmix-jp-grid-mix-fy2021","record_type":"grid_mix","jurisdiction":"JP","data":{"region":"Japan","period":"FY2021 (Apr 2021 – Mar 2022)","renewable_pct":11.44,"coal_pct":33.35,"largest_renewable":"Hydro","by_fuel":[{"fuel":"LNG","asset_class":"gas","gwh":328129.0},{"fuel":"Coal","asset_class":"coal","gwh":301974.9},{"fuel":"Hydro","asset_class":"hydro","gwh":74441.3},{"fuel":"Nuclear","asset_class":"other","gwh":70946.7},{"fuel":"Other thermal","asset_class":"other","gwh":33285.3},{"fuel":"Other gas","asset_class":"gas","gwh":30346.2},{"fuel":"Oil","asset_class":"other","gwh":23206.3},{"fuel":"Solar","asset_class":"solar","gwh":19253.3},{"fuel":"Pumped hydro","asset_class":"pumped_hydro","gwh":12246.2},{"fuel":"Wind","asset_class":"wind","gwh":7698.7},{"fuel":"Geothermal","asset_class":"geothermal","gwh":2216.5}],"total_gwh":905438.5,"basis":"Generated (発電端), NOT sent-out — the register states that sent-out totals fold in a battery-discharge component. Survey covers licensed 電気事業者 only. `renewable_pct` is the register's own 新エネルギー等計 plus conventional hydro, and therefore EXCLUDES biomass and waste, which sit outside that grouping; a headline Japanese renewables share quoted elsewhere will be higher and is not computed this way.","as_at":"2022-03-31"},"source_url":"https://www.e-stat.go.jp/stat-search/files?page=1&layout=dataset&toukei=00551011","publisher":"経済産業省 via e-Stat (総合エネルギー統計補足調査)","fetched_at":"2026-09-12T14:23:44.813293+00:00","confidence":"high"},{"entity_id":"gridmix-jp-grid-mix-fy2022","record_type":"grid_mix","jurisdiction":"JP","data":{"region":"Japan","period":"FY2022 (Apr 2022 – Mar 2023)","renewable_pct":11.96,"coal_pct":34.36,"largest_renewable":"Hydro","by_fuel":[{"fuel":"LNG","asset_class":"gas","gwh":310698.1},{"fuel":"Coal","asset_class":"coal","gwh":300618.2},{"fuel":"Hydro","asset_class":"hydro","gwh":72859.8},{"fuel":"Nuclear","asset_class":"other","gwh":56351.0},{"fuel":"Other thermal","asset_class":"other","gwh":38243.2},{"fuel":"Other gas","asset_class":"gas","gwh":26635.0},{"fuel":"Oil","asset_class":"other","gwh":23901.3},{"fuel":"Solar","asset_class":"solar","gwh":22008.6},{"fuel":"Pumped hydro","asset_class":"pumped_hydro","gwh":10998.3},{"fuel":"Wind","asset_class":"wind","gwh":7628.1},{"fuel":"Geothermal","asset_class":"geothermal","gwh":2162.7}],"total_gwh":874931.0,"basis":"Generated (発電端), NOT sent-out — the register states that sent-out totals fold in a battery-discharge component. Survey covers licensed 電気事業者 only. `renewable_pct` is the register's own 新エネルギー等計 plus conventional hydro, and therefore EXCLUDES biomass and waste, which sit outside that grouping; a headline Japanese renewables share quoted elsewhere will be higher and is not computed this way.","as_at":"2023-03-31"},"source_url":"https://www.e-stat.go.jp/stat-search/files?page=1&layout=dataset&toukei=00551011","publisher":"経済産業省 via e-Stat (総合エネルギー統計補足調査)","fetched_at":"2026-09-12T14:23:44.813293+00:00","confidence":"high"},{"entity_id":"gridmix-jp-grid-mix-fy2023","record_type":"grid_mix","jurisdiction":"JP","data":{"region":"Japan","period":"FY2023 (Apr 2023 – Mar 2024)","renewable_pct":12.26,"coal_pct":32.47,"largest_renewable":"Hydro","by_fuel":[{"fuel":"LNG","asset_class":"gas","gwh":300557.9},{"fuel":"Coal","asset_class":"coal","gwh":281199.5},{"fuel":"Nuclear","asset_class":"other","gwh":84224.0},{"fuel":"Hydro","asset_class":"hydro","gwh":71049.7},{"fuel":"Other thermal","asset_class":"other","gwh":39241.3},{"fuel":"Other gas","asset_class":"gas","gwh":25333.7},{"fuel":"Solar","asset_class":"solar","gwh":24113.3},{"fuel":"Oil","asset_class":"other","gwh":14450.5},{"fuel":"Pumped hydro","asset_class":"pumped_hydro","gwh":11943.5},{"fuel":"Wind","asset_class":"wind","gwh":8618.8},{"fuel":"Geothermal","asset_class":"geothermal","gwh":2332.5}],"total_gwh":866126.7,"basis":"Generated (発電端), NOT sent-out — the register states that sent-out totals fold in a battery-discharge component. Survey covers licensed 電気事業者 only. `renewable_pct` is the register's own 新エネルギー等計 plus conventional hydro, and therefore EXCLUDES biomass and waste, which sit outside that grouping; a headline Japanese renewables share quoted elsewhere will be higher and is not computed this way.","as_at":"2024-03-31"},"source_url":"https://www.e-stat.go.jp/stat-search/files?page=1&layout=dataset&toukei=00551011","publisher":"経済産業省 via e-Stat (総合エネルギー統計補足調査)","fetched_at":"2026-09-12T14:23:44.813293+00:00","confidence":"high"},{"entity_id":"gridmix-jp-grid-mix-fy2024","record_type":"grid_mix","jurisdiction":"JP","data":{"region":"Japan","period":"FY2024 (Apr 2024 – Mar 2025)","renewable_pct":12.32,"coal_pct":32.98,"largest_renewable":"Hydro","by_fuel":[{"fuel":"LNG","asset_class":"gas","gwh":292558.1},{"fuel":"Coal","asset_class":"coal","gwh":288929.8},{"fuel":"Nuclear","asset_class":"other","gwh":93543.9},{"fuel":"Hydro","asset_class":"hydro","gwh":69883.7},{"fuel":"Other thermal","asset_class":"other","gwh":44590.1},{"fuel":"Solar","asset_class":"solar","gwh":25573.9},{"fuel":"Other gas","asset_class":"gas","gwh":23642.1},{"fuel":"Pumped hydro","asset_class":"pumped_hydro","gwh":12412.4},{"fuel":"Oil","asset_class":"other","gwh":10797.7},{"fuel":"Wind","asset_class":"wind","gwh":10024.9},{"fuel":"Geothermal","asset_class":"geothermal","gwh":2355.4}],"total_gwh":876170.7,"basis":"Generated (発電端), NOT sent-out — the register states that sent-out totals fold in a battery-discharge component. Survey covers licensed 電気事業者 only. `renewable_pct` is the register's own 新エネルギー等計 plus conventional hydro, and therefore EXCLUDES biomass and waste, which sit outside that grouping; a headline Japanese renewables share quoted elsewhere will be higher and is not computed this way.","as_at":"2025-03-31"},"source_url":"https://www.e-stat.go.jp/stat-search/files?page=1&layout=dataset&toukei=00551011","publisher":"経済産業省 via e-Stat (総合エネルギー統計補足調査)","fetched_at":"2026-09-12T14:23:44.813293+00:00","confidence":"high"},{"entity_id":"install-2026-install-forecast","record_type":"install_stat","jurisdiction":"AU","data":{"id":"install-2026-install-forecast","metric":"2026 install forecast","value":"350,000-520,000","detail":"CER projects 8-12 GWh of new capacity.","period":"CY2026 (forecast)","jurisdiction":"AU"},"source_url":"https://cer.gov.au/schemes/renewable-energy-target/small-scale-renewable-energy-scheme/cheaper-home-batteries-program","publisher":"Clean Energy Regulator","fetched_at":"2026-08-30T10:16:53.805732+00:00","confidence":"high"},{"entity_id":"install-average-new-battery-size","record_type":"install_stat","jurisdiction":"AU","data":{"id":"install-average-new-battery-size","metric":"Average new battery size","value":"21.6 kWh","detail":"up from 11.8 kWh in 2024.","period":"2025","jurisdiction":"AU"},"source_url":"https://cer.gov.au/schemes/renewable-energy-target/small-scale-renewable-energy-scheme/cheaper-home-batteries-program","publisher":"Clean Energy Regulator","fetched_at":"2026-08-30T10:16:53.805732+00:00","confidence":"high"},{"entity_id":"install-cheaper-home-batteries-program-installs","record_type":"install_stat","jurisdiction":"AU","data":{"id":"install-cheaper-home-batteries-program-installs","metric":"Cheaper Home Batteries Program installs","value":"500,000+","detail":"~14 GWh; 8,846 accredited installers. Milestones: 100k Oct-25 -> 250k Mar-26 -> 400k May-26 -> 500k Aug-26.","period":"as at Aug 2026","jurisdiction":"AU"},"source_url":"https://cer.gov.au/schemes/renewable-energy-target/small-scale-renewable-energy-scheme/cheaper-home-batteries-program","publisher":"Clean Energy Regulator","fetched_at":"2026-08-30T10:16:53.805732+00:00","confidence":"high"},{"entity_id":"install-cumulative-home-batteries","record_type":"install_stat","jurisdiction":"AU","data":{"id":"install-cumulative-home-batteries","metric":"Cumulative home batteries","value":"~450,000","detail":"~4% of Australia's 10.9M households.","period":"end-2025","jurisdiction":"AU"},"source_url":"https://cer.gov.au/schemes/renewable-energy-target/small-scale-renewable-energy-scheme/cheaper-home-batteries-program","publisher":"Clean Energy Regulator","fetched_at":"2026-08-30T10:16:53.805732+00:00","confidence":"high"},{"entity_id":"install-home-battery-installs-2024","record_type":"install_stat","jurisdiction":"AU","data":{"id":"install-home-battery-installs-2024","metric":"Home battery installs 2024","value":"72,500","detail":"+27% on 2023.","period":"CY2024","jurisdiction":"AU"},"source_url":"https://cer.gov.au/schemes/renewable-energy-target/small-scale-renewable-energy-scheme/cheaper-home-batteries-program","publisher":"Clean Energy Regulator","fetched_at":"2026-08-30T10:16:53.805732+00:00","confidence":"high"},{"entity_id":"install-home-battery-installs-2025","record_type":"install_stat","jurisdiction":"AU","data":{"id":"install-home-battery-installs-2025","metric":"Home battery installs 2025","value":"221,000","detail":"4,790 MWh; ~3x the 2024 volume. CER register shows 193,000+ installs / 4.6 GWh.","period":"CY2025","jurisdiction":"AU"},"source_url":"https://cer.gov.au/schemes/renewable-energy-target/small-scale-renewable-energy-scheme/cheaper-home-batteries-program","publisher":"Clean Energy Regulator","fetched_at":"2026-08-30T10:16:53.805732+00:00","confidence":"high"},{"entity_id":"install-jp-fit-installs-approved-2026-03","record_type":"install_stat","jurisdiction":"JP","data":{"id":"jp-fit-installs-approved-2026-03","metric":"FIT/FIP units approved","value":"3,361,065","detail":"認定件数 新規認定分","period":"as at 2026-03","jurisdiction":"JP"},"source_url":"https://www.fit-portal.go.jp/PublicInfoSummary","publisher":"経済産業省 資源エネルギー庁 (METI/ANRE) — 再生可能エネルギー電子申請","fetched_at":"2026-10-11T21:49:28.332427+00:00","confidence":"high"},{"entity_id":"install-jp-fit-installs-built-share-2026-03","record_type":"install_stat","jurisdiction":"JP","data":{"id":"jp-fit-installs-built-share-2026-03","metric":"FIT/FIP units commissioned as a share of approved","value":"98.8%","detail":"新規認定分 導入件数 ÷ 新規認定分 認定件数","period":"as at 2026-03","jurisdiction":"JP"},"source_url":"https://www.fit-portal.go.jp/PublicInfoSummary","publisher":"経済産業省 資源エネルギー庁 (METI/ANRE) — 再生可能エネルギー電子申請","fetched_at":"2026-10-11T21:49:28.332427+00:00","confidence":"high"},{"entity_id":"install-jp-fit-installs-commissioned-2026-03","record_type":"install_stat","jurisdiction":"JP","data":{"id":"jp-fit-installs-commissioned-2026-03","metric":"FIT/FIP accredited units commissioned","value":"4,526,104","detail":"新規認定分 + 移行認定分 導入件数","period":"as at 2026-03","jurisdiction":"JP"},"source_url":"https://www.fit-portal.go.jp/PublicInfoSummary","publisher":"経済産業省 資源エネルギー庁 (METI/ANRE) — 再生可能エネルギー電子申請","fetched_at":"2026-10-11T21:49:28.332427+00:00","confidence":"high"},{"entity_id":"install-new-solar-paired-with-a-battery","record_type":"install_stat","jurisdiction":"AU","data":{"id":"install-new-solar-paired-with-a-battery","metric":"New solar paired with a battery","value":"~71%","detail":"share of new rooftop-solar installs that now include a battery.","period":"Q1 2026","jurisdiction":"AU"},"source_url":"https://cer.gov.au/schemes/renewable-energy-target/small-scale-renewable-energy-scheme/cheaper-home-batteries-program","publisher":"Clean Energy Regulator","fetched_at":"2026-08-30T10:16:53.805732+00:00","confidence":"high"},{"entity_id":"market-ae","record_type":"market_stat","jurisdiction":"AE","data":{"id":"market-ae","name":"United Arab Emirates — grid-scale storage market","country":"United Arab Emirates","jurisdiction":"AE","project_count":56,"total_mw":54975.5,"storage_count":0,"by_class":[{"asset_class":"gas","count":24,"mw":29487.0},{"asset_class":"solar","count":30,"mw":25303.5},{"asset_class":"wind","count":2,"mw":185.0}],"operational_count":31,"operational_mw":30795.0,"construction_count":13,"announced_count":7,"retired_count":5,"built_share_pct":56.0,"developer_count":21,"top_developers":[{"name":"DEWA","projects":9,"mw":9226.0},{"name":"Masdar Clean Energy","projects":2,"mw":6700.0},{"name":"Shuweihat CMS International Power Company","projects":1,"mw":4889.0},{"name":"Dubai Electricity and Water Authority PJSC","projects":7,"mw":4333.0},{"name":"Emirates Water and Electricity Company PJSC","projects":4,"mw":4140.0}],"top_states":[{"state":"Abu Dhabi","projects":11},{"state":"Emirate of Dubai","projects":7},{"state":"Abu Dhabi Emirate","projects":5},{"state":"Sharjah","projects":4},{"state":"Umm Al Quwain Emirate","projects":1}],"tender_count":2,"tendered_mw":1400.0,"macro_layers":[],"missing_layers":["certificate clearing price","consumer rebates","feed-in tariffs","grid emissions intensity","grid generation mix","historical series","install volumes","national installed capacity"],"stage_mix":[{"stage":"operational","count":31},{"stage":"committed","count":8},{"stage":"announced","count":7},{"stage":"under_construction","count":5},{"stage":"withdrawn","count":5}],"source":"derived from the stored project + tender records"},"source_url":"https://ai-root.com/market","publisher":"derived from the project + tender layers","fetched_at":"2026-10-12T09:22:25.567002+00:00","confidence":"medium"},{"entity_id":"market-au","record_type":"market_stat","jurisdiction":"AU","data":{"id":"market-au","name":"Australia — grid-scale storage market","country":"Australia","jurisdiction":"AU","project_count":1302,"total_mw":377768.8,"total_mwh":674917.1,"storage_count":572,"storage_mw":175351.1,"by_class":[{"asset_class":"battery","count":545,"mw":158140.6},{"asset_class":"wind","count":254,"mw":118178.3},{"asset_class":"solar","count":278,"mw":54053.4},{"asset_class":"pumped_hydro","count":27,"mw":17210.5},{"asset_class":"gas","count":88,"mw":12037.7},{"asset_class":"coal","count":15,"mw":7669.0},{"asset_class":"other","count":36,"mw":7367.5},{"asset_class":"hydro","count":59,"mw":3111.8}],"operational_count":397,"operational_mw":40532.8,"construction_count":63,"announced_count":841,"retired_count":1,"built_share_pct":10.7,"avg_duration_h":4.01,"developer_count":858,"top_developers":[{"name":"OceanEx Energy","projects":4,"mw":8000.0},{"name":"ACEnergy Pty Ltd","projects":8,"mw":3897.0},{"name":"ARK Energy Corporation Pty Ltd","projects":11,"mw":3636.4},{"name":"AGL Energy Limited","projects":8,"mw":3442.0},{"name":"APA Power Holdings Pty Ltd","projects":5,"mw":3425.0}],"top_states":[{"state":"NSW","projects":433},{"state":"QLD","projects":364},{"state":"VIC","projects":279},{"state":"SA","projects":164},{"state":"TAS","projects":62}],"tender_count":2,"tendered_mw":41000.0,"macro_layers":["certificate clearing price","consumer rebates","feed-in tariffs","grid emissions intensity","grid generation mix","historical series","install volumes"],"missing_layers":["national installed capacity"],"stage_mix":[{"stage":"announced","count":760},{"stage":"operational","count":397},{"stage":"anticipated","count":81},{"stage":"committed","count":41},{"stage":"under_construction","count":22},{"stage":"withdrawn","count":1}],"source":"derived from the stored project + tender records"},"source_url":"https://ai-root.com/market","publisher":"derived from the project + tender layers","fetched_at":"2026-10-12T09:22:25.567002+00:00","confidence":"medium"},{"entity_id":"market-cn","record_type":"market_stat","jurisdiction":"CN","data":{"id":"market-cn","name":"China — grid-scale storage market","country":"China","jurisdiction":"CN","project_count":19258,"total_mw":4011884.9,"storage_count":0,"by_class":[{"asset_class":"solar","count":8001,"mw":1392935.2},{"asset_class":"wind","count":9778,"mw":1317147.3},{"asset_class":"coal","count":944,"mw":954893.0},{"asset_class":"hydro","count":440,"mw":252361.9},{"asset_class":"gas","count":84,"mw":61165.5},{"asset_class":"other","count":11,"mw":33382.0}],"operational_count":11116,"operational_mw":2372392.5,"construction_count":6009,"announced_count":1283,"retired_count":850,"built_share_pct":59.1,"developer_count":5286,"top_developers":[{"name":"China Huaneng Group Corporation (CHNG)","projects":41,"mw":64104.0},{"name":"China Guodian Group Corporation","projects":42,"mw":51034.0},{"name":"Huadian Power International Company Limited","projects":35,"mw":39253.0},{"name":"China Resources Power Holdings Co Ltd","projects":35,"mw":35218.0},{"name":"China Longyuan Power Group Corp Ltd","projects":197,"mw":30522.6}],"top_states":[{"state":"Inner Mongolia","projects":1475},{"state":"Xinjiang","projects":1188},{"state":"Hebei","projects":1159},{"state":"Yunnan","projects":1147},{"state":"Guizhou","projects":1143}],"tender_count":0,"macro_layers":[],"missing_layers":["certificate clearing price","consumer rebates","feed-in tariffs","grid emissions intensity","grid generation mix","historical series","install volumes","national installed capacity"],"stage_mix":[{"stage":"operational","count":11116},{"stage":"committed","count":4011},{"stage":"under_construction","count":1998},{"stage":"announced","count":1283},{"stage":"withdrawn","count":558},{"stage":"cancelled","count":266},{"stage":"retired","count":20},{"stage":"mothballed","count":6}],"source":"derived from the stored project + tender records"},"source_url":"https://ai-root.com/market","publisher":"derived from the project + tender layers","fetched_at":"2026-10-12T09:22:25.567002+00:00","confidence":"medium"},{"entity_id":"market-de","record_type":"market_stat","jurisdiction":"DE","data":{"id":"market-de","name":"Germany — grid-scale storage market","country":"Germany","jurisdiction":"DE","project_count":291,"total_mw":95863.8,"storage_count":2,"storage_mw":228.0,"by_class":[{"asset_class":"coal","count":77,"mw":47412.0},{"asset_class":"gas","count":128,"mw":25994.8},{"asset_class":"other","count":39,"mw":13566.0},{"asset_class":"hydro","count":45,"mw":8663.0},{"asset_class":"pumped_hydro","count":2,"mw":228.0}],"operational_count":291,"operational_mw":95863.8,"construction_count":0,"announced_count":0,"retired_count":0,"built_share_pct":100.0,"developer_count":160,"top_developers":[{"name":"RWE Power AG","projects":8,"mw":10959.0},{"name":"Vattenfall Europe AG","projects":9,"mw":9706.0},{"name":"Vattenfall Europe Generation AG","projects":12,"mw":4469.2},{"name":"RWE Generation SE","projects":4,"mw":4465.8},{"name":"EnBW Energie Baden-Württemberg AG","projects":11,"mw":3713.9}],"top_states":[],"tender_count":4,"tendered_mwh":3300.0,"macro_layers":[],"missing_layers":["certificate clearing price","consumer rebates","feed-in tariffs","grid emissions intensity","grid generation mix","historical series","install volumes","national installed capacity"],"stage_mix":[{"stage":"operational","count":291}],"source":"derived from the stored project + tender records"},"source_url":"https://ai-root.com/market","publisher":"derived from the project + tender layers","fetched_at":"2026-10-12T09:22:25.567002+00:00","confidence":"medium"},{"entity_id":"market-es","record_type":"market_stat","jurisdiction":"ES","data":{"id":"market-es","name":"Spain — grid-scale storage market","country":"Spain","jurisdiction":"ES","project_count":2966,"total_mw":299727.2,"storage_count":0,"by_class":[{"asset_class":"solar","count":1543,"mw":147413.0},{"asset_class":"wind","count":1251,"mw":90794.4},{"asset_class":"gas","count":58,"mw":30393.4},{"asset_class":"hydro","count":91,"mw":15028.3},{"asset_class":"coal","count":15,"mw":8783.3},{"asset_class":"other","count":8,"mw":7314.8}],"operational_count":978,"operational_mw":103607.7,"construction_count":1465,"announced_count":89,"retired_count":434,"built_share_pct":34.6,"developer_count":544,"top_developers":[{"name":"IBERDROLA GENERACION  S.A.","projects":38,"mw":18120.9},{"name":"ENDESA GENERACION S.A.","projects":45,"mw":13564.5},{"name":"GAS NATURAL FENOSA GENERACION  S.L.U.","projects":26,"mw":9834.9},{"name":"Iberdrola Renovables Energia SA","projects":133,"mw":7319.6},{"name":"Iberdrola SA","projects":55,"mw":7053.4}],"top_states":[{"state":"Aragón","projects":448},{"state":"Castilla-La Mancha","projects":446},{"state":"Castilla y León","projects":433},{"state":"Andalucía","projects":413},{"state":"Cataluña","projects":197}],"tender_count":9,"tendered_mw":4160.0,"tendered_mwh":2668.0,"macro_layers":[],"missing_layers":["certificate clearing price","consumer rebates","feed-in tariffs","grid emissions intensity","grid generation mix","historical series","install volumes","national installed capacity"],"stage_mix":[{"stage":"committed","count":1360},{"stage":"operational","count":978},{"stage":"withdrawn","count":291},{"stage":"cancelled","count":141},{"stage":"under_construction","count":105},{"stage":"announced","count":89},{"stage":"retired","count":2}],"source":"derived from the stored project + tender records"},"source_url":"https://ai-root.com/market","publisher":"derived from the project + tender layers","fetched_at":"2026-10-12T09:22:25.567002+00:00","confidence":"medium"},{"entity_id":"market-gb","record_type":"market_stat","jurisdiction":"GB","data":{"id":"market-gb","name":"United Kingdom — grid-scale storage market","country":"United Kingdom","jurisdiction":"GB","project_count":2087,"total_mw":693998.6,"storage_count":1415,"storage_mw":443397.3,"by_class":[{"asset_class":"battery","count":1411,"mw":441041.3},{"asset_class":"wind","count":435,"mw":138657.2},{"asset_class":"other","count":75,"mw":38392.1},{"asset_class":"gas","count":79,"mw":36282.4},{"asset_class":"hydro","count":38,"mw":24828.1},{"asset_class":"solar","count":45,"mw":12441.5},{"asset_class":"pumped_hydro","count":4,"mw":2356.0}],"operational_count":384,"operational_mw":87913.8,"construction_count":221,"announced_count":1482,"retired_count":0,"built_share_pct":12.7,"developer_count":1391,"top_developers":[{"name":"TELIS ENERGY UK LIMITED","projects":18,"mw":17100.0},{"name":"RWE Generation UK Plc","projects":14,"mw":8996.0},{"name":"Lightsource Renewable UK Development Limited","projects":35,"mw":8537.0},{"name":"SCOTTISHPOWER RENEWABLES (UK) LIMITED","projects":34,"mw":7018.2},{"name":"EDF Energy Nuclear Generation Limited","projects":6,"mw":6040.0}],"top_states":[],"tender_count":0,"macro_layers":[],"missing_layers":["certificate clearing price","consumer rebates","feed-in tariffs","grid emissions intensity","grid generation mix","historical series","install volumes","national installed capacity"],"stage_mix":[{"stage":"announced","count":1482},{"stage":"operational","count":384},{"stage":"committed","count":185},{"stage":"under_construction","count":36}],"source":"derived from the stored project + tender records"},"source_url":"https://ai-root.com/market","publisher":"derived from the project + tender layers","fetched_at":"2026-10-12T09:22:25.567002+00:00","confidence":"medium"},{"entity_id":"market-in","record_type":"market_stat","jurisdiction":"IN","data":{"id":"market-in","name":"India — grid-scale storage market","country":"India","jurisdiction":"IN","project_count":2132,"total_mw":633923.9,"total_mwh":43489.0,"storage_count":35,"storage_mw":10083.0,"by_class":[{"asset_class":"solar","count":928,"mw":248426.8},{"asset_class":"coal","count":231,"mw":204538.2},{"asset_class":"wind","count":668,"mw":90502.5},{"asset_class":"hydro","count":178,"mw":44854.4},{"asset_class":"gas","count":77,"mw":26461.5},{"asset_class":"battery","count":34,"mw":10083.0},{"asset_class":"other","count":15,"mw":9057.5},{"asset_class":"pumped_hydro","count":1,"mw":0.0}],"operational_count":1189,"operational_mw":366205.8,"construction_count":702,"announced_count":163,"retired_count":78,"built_share_pct":57.8,"avg_duration_h":2.74,"developer_count":468,"top_developers":[{"name":"Adani Group","projects":58,"mw":13803.0},{"name":"ReNew Power","projects":74,"mw":10584.0},{"name":"NHPC Ltd","projects":36,"mw":9405.0},{"name":"Adani Green Energy","projects":36,"mw":9397.5},{"name":"ReNew Solar Power","projects":42,"mw":9065.0}],"top_states":[{"state":"Rajasthan","projects":408},{"state":"Gujarat","projects":317},{"state":"Karnataka","projects":225},{"state":"Maharashtra","projects":170},{"state":"Andhra Pradesh","projects":130}],"tender_count":35,"tendered_mw":18995.0,"tendered_mwh":139676.0,"macro_layers":["national installed capacity"],"missing_layers":["certificate clearing price","consumer rebates","feed-in tariffs","grid emissions intensity","grid generation mix","historical series","install volumes"],"stage_mix":[{"stage":"operational","count":1189},{"stage":"under_construction","count":529},{"stage":"committed","count":173},{"stage":"announced","count":142},{"stage":"cancelled","count":40},{"stage":"withdrawn","count":38},{"stage":"awarded","count":11},{"stage":"tendered","count":10}],"source":"derived from the stored project + tender records"},"source_url":"https://ai-root.com/market","publisher":"derived from the project + tender layers","fetched_at":"2026-10-12T09:22:25.567002+00:00","confidence":"medium"},{"entity_id":"market-jp","record_type":"market_stat","jurisdiction":"JP","data":{"id":"market-jp","name":"Japan — grid-scale storage market","country":"Japan","jurisdiction":"JP","project_count":624,"total_mw":279269.7,"total_mwh":5169.9,"storage_count":133,"storage_mw":1469.2,"by_class":[{"asset_class":"gas","count":54,"mw":96826.0},{"asset_class":"wind","count":218,"mw":63788.1},{"asset_class":"other","count":16,"mw":42537.0},{"asset_class":"coal","count":51,"mw":41513.0},{"asset_class":"hydro","count":55,"mw":27439.0},{"asset_class":"solar","count":90,"mw":5277.4},{"asset_class":"battery","count":133,"mw":1469.2},{"asset_class":"geothermal","count":7,"mw":420.0}],"operational_count":428,"operational_mw":216269.4,"construction_count":65,"announced_count":54,"retired_count":77,"built_share_pct":77.4,"avg_duration_h":3.72,"developer_count":247,"top_developers":[{"name":"Tokyo","projects":26,"mw":57842.0},{"name":"Kansai","projects":16,"mw":28129.0},{"name":"Chubu","projects":18,"mw":26400.0},{"name":"Kyushu","projects":9,"mw":12633.0},{"name":"Tohoku","projects":5,"mw":9844.0}],"top_states":[{"state":"Hokkaido","projects":19},{"state":"Fukuoka","projects":13},{"state":"Fukushima","projects":9},{"state":"Gunma","projects":9},{"state":"Saitama","projects":8}],"tender_count":126,"tendered_mw":23594.9,"tendered_mwh":90.0,"macro_layers":["feed-in tariffs","grid emissions intensity","grid generation mix","historical series","install volumes","national installed capacity"],"missing_layers":["certificate clearing price","consumer rebates"],"stage_mix":[{"stage":"operational","count":428},{"stage":"announced","count":48},{"stage":"committed","count":46},{"stage":"cancelled","count":37},{"stage":"withdrawn","count":36},{"stage":"under_construction","count":19},{"stage":"awarded","count":6},{"stage":"retired","count":3},{"stage":"mothballed","count":1}],"source":"derived from the stored project + tender records"},"source_url":"https://ai-root.com/market","publisher":"derived from the project + tender layers","fetched_at":"2026-10-12T09:22:25.567002+00:00","confidence":"medium"},{"entity_id":"market-my","record_type":"market_stat","jurisdiction":"MY","data":{"id":"market-my","name":"Malaysia — grid-scale storage market","country":"Malaysia","jurisdiction":"MY","project_count":95,"total_mw":38374.0,"total_mwh":8980.0,"storage_count":13,"storage_mw":800.0,"by_class":[{"asset_class":"gas","count":24,"mw":13508.0},{"asset_class":"coal","count":7,"mw":13004.0},{"asset_class":"solar","count":41,"mw":8973.0},{"asset_class":"hydro","count":9,"mw":1989.0},{"asset_class":"battery","count":13,"mw":800.0},{"asset_class":"wind","count":1,"mw":100.0}],"operational_count":55,"operational_mw":29544.0,"construction_count":8,"announced_count":20,"retired_count":12,"built_share_pct":77.0,"avg_duration_h":4.05,"developer_count":43,"top_developers":[{"name":"TNB Janamanjung Sdn Bhd","projects":1,"mw":4180.0},{"name":"Malakoff Bhd","projects":1,"mw":3244.0},{"name":"Terengganu Inc","projects":1,"mw":2000.0},{"name":"Citaglobal Bhd","projects":1,"mw":2000.0},{"name":"Kapar Energy Ventures Sdn Bhd","projects":1,"mw":1600.0}],"top_states":[{"state":"Perak","projects":8},{"state":"Kedah","projects":8},{"state":"Pahang","projects":6},{"state":"Johor","projects":4},{"state":"Sarawak","projects":3}],"tender_count":5,"tendered_mw":2700.0,"tendered_mwh":1600.0,"macro_layers":["historical series"],"missing_layers":["certificate clearing price","consumer rebates","feed-in tariffs","grid emissions intensity","grid generation mix","install volumes","national installed capacity"],"stage_mix":[{"stage":"operational","count":55},{"stage":"announced","count":15},{"stage":"withdrawn","count":7},{"stage":"committed","count":6},{"stage":"awarded","count":5},{"stage":"cancelled","count":5},{"stage":"under_construction","count":1},{"stage":"financial_close","count":1}],"source":"derived from the stored project + tender records"},"source_url":"https://ai-root.com/market","publisher":"derived from the project + tender layers","fetched_at":"2026-10-12T09:22:25.567002+00:00","confidence":"medium"},{"entity_id":"market-nz","record_type":"market_stat","jurisdiction":"NZ","data":{"id":"market-nz","name":"New Zealand — grid-scale storage market","country":"New Zealand","jurisdiction":"NZ","project_count":262,"total_mw":35953.4,"storage_count":11,"storage_mw":1471.0,"by_class":[{"asset_class":"wind","count":51,"mw":13905.4},{"asset_class":"solar","count":95,"mw":9055.6},{"asset_class":"hydro","count":56,"mw":5297.5},{"asset_class":"gas","count":18,"mw":2787.0},{"asset_class":"geothermal","count":24,"mw":1736.9},{"asset_class":"other","count":7,"mw":1700.0},{"asset_class":"battery","count":11,"mw":1471.0}],"operational_count":110,"operational_mw":11245.9,"construction_count":24,"announced_count":121,"retired_count":7,"built_share_pct":31.3,"developer_count":67,"top_developers":[{"name":"Meridian Energy Limited","projects":17,"mw":3238.4},{"name":"Oceanex","projects":3,"mw":3000.0},{"name":"Bluefloat/Elemental","projects":3,"mw":2835.0},{"name":"Contact Energy Limited","projects":17,"mw":2697.4},{"name":"Genesis Energy Limited","projects":14,"mw":2235.0}],"top_states":[{"state":"North Island","projects":97},{"state":"South Island","projects":41},{"state":"Uncertain","projects":7}],"tender_count":0,"macro_layers":[],"missing_layers":["certificate clearing price","consumer rebates","feed-in tariffs","grid emissions intensity","grid generation mix","historical series","install volumes","national installed capacity"],"stage_mix":[{"stage":"announced","count":121},{"stage":"operational","count":110},{"stage":"committed","count":24},{"stage":"retired","count":7}],"source":"derived from the stored project + tender records"},"source_url":"https://ai-root.com/market","publisher":"derived from the project + tender layers","fetched_at":"2026-10-12T09:22:25.567002+00:00","confidence":"medium"},{"entity_id":"market-sa","record_type":"market_stat","jurisdiction":"SA","data":{"id":"market-sa","name":"Saudi Arabia — grid-scale storage market","country":"Saudi Arabia","jurisdiction":"SA","project_count":132,"total_mw":132037.4,"storage_count":0,"by_class":[{"asset_class":"gas","count":81,"mw":84148.9},{"asset_class":"solar","count":41,"mw":37518.5},{"asset_class":"wind","count":10,"mw":10370.0}],"operational_count":97,"operational_mw":94927.4,"construction_count":32,"announced_count":1,"retired_count":2,"built_share_pct":71.9,"developer_count":35,"top_developers":[{"name":"Saudi Electricity Company (SEC)","projects":51,"mw":57588.6},{"name":"ACWA Power Co","projects":17,"mw":26010.0},{"name":"Saline Water Conversion Corporation (SWCC)","projects":6,"mw":6580.4},{"name":"Hajr for Electricity Production Company","projects":1,"mw":4098.0},{"name":"NEOM Green Hydrogen Co","projects":2,"mw":3870.0}],"top_states":[{"state":"Riyadh","projects":5},{"state":"Eastern province","projects":3},{"state":"Makkah","projects":3},{"state":"Hail","projects":3},{"state":"Al Madina","projects":3}],"tender_count":5,"tendered_mw":5000.0,"tendered_mwh":29300.0,"macro_layers":[],"missing_layers":["certificate clearing price","consumer rebates","feed-in tariffs","grid emissions intensity","grid generation mix","historical series","install volumes","national installed capacity"],"stage_mix":[{"stage":"operational","count":97},{"stage":"committed","count":26},{"stage":"under_construction","count":6},{"stage":"cancelled","count":2},{"stage":"announced","count":1}],"source":"derived from the stored project + tender records"},"source_url":"https://ai-root.com/market","publisher":"derived from the project + tender layers","fetched_at":"2026-10-12T09:22:25.567002+00:00","confidence":"medium"},{"entity_id":"market-sg","record_type":"market_stat","jurisdiction":"SG","data":{"id":"market-sg","name":"Singapore — grid-scale storage market","country":"Singapore","jurisdiction":"SG","project_count":28,"total_mw":16025.4,"total_mwh":287.4,"storage_count":5,"storage_mw":402.4,"by_class":[{"asset_class":"gas","count":13,"mw":14842.0},{"asset_class":"solar","count":7,"mw":595.0},{"asset_class":"battery","count":5,"mw":402.4},{"asset_class":"other","count":2,"mw":136.0},{"asset_class":"wind","count":1,"mw":50.0}],"operational_count":18,"operational_mw":14100.4,"construction_count":3,"announced_count":3,"retired_count":4,"built_share_pct":88.0,"avg_duration_h":1.21,"developer_count":9,"top_developers":[{"name":"PacificLight","projects":1,"mw":670.0},{"name":"Sembcorp","projects":2,"mw":400.0},{"name":"Sembcorp Solar Singapore Pte Ltd","projects":2,"mw":210.0},{"name":"Public Utilities Board Singapore","projects":2,"mw":155.0},{"name":"Sembcorp Industries Ltd","projects":1,"mw":118.0}],"top_states":[{"state":"Jurong Island","projects":2},{"state":"West Region","projects":1}],"tender_count":1,"tendered_mw":200.0,"tendered_mwh":285.0,"macro_layers":[],"missing_layers":["certificate clearing price","consumer rebates","feed-in tariffs","grid emissions intensity","grid generation mix","historical series","install volumes","national installed capacity"],"stage_mix":[{"stage":"operational","count":18},{"stage":"withdrawn","count":4},{"stage":"awarded","count":2},{"stage":"committed","count":2},{"stage":"under_construction","count":1},{"stage":"announced","count":1}],"source":"derived from the stored project + tender records"},"source_url":"https://ai-root.com/market","publisher":"derived from the project + tender layers","fetched_at":"2026-10-12T09:22:25.567002+00:00","confidence":"medium"},{"entity_id":"series-jp-generation-series","record_type":"metric_series","jurisdiction":"JP","data":{"id":"jp-generation-series","name":"Japan total generation (発電端)","unit":"GWh","category":"grid","points":[{"period":"FY2018","value":922949.0},{"period":"FY2019","value":903195.9},{"period":"FY2020","value":886071.6},{"period":"FY2021","value":905438.5},{"period":"FY2022","value":874931.0},{"period":"FY2023","value":866126.7},{"period":"FY2024","value":876170.7}],"source":"https://www.e-stat.go.jp/stat-search/files?page=1&layout=dataset&toukei=00551011","note":"Fiscal years (Apr–Mar), generated basis. From METI's 総合エネルギー統計補足調査 via e-Stat; 政府標準利用規約 2.0, CC BY 4.0 compatible.","jurisdiction":"JP"},"source_url":"https://www.e-stat.go.jp/stat-search/files?page=1&layout=dataset&toukei=00551011","publisher":"経済産業省 via e-Stat","fetched_at":"2026-09-12T14:23:44.816527+00:00","confidence":"high"},{"entity_id":"series-my-emissions-agriculture","record_type":"metric_series","jurisdiction":"MY","data":{"id":"my-emissions-agriculture","name":"Malaysia GHG emissions — agriculture","unit":"kt CO2e","category":"emissions","points":[{"period":"2014-01-01","value":11095.67},{"period":"2015-01-01","value":10647.03},{"period":"2016-01-01","value":10711.36},{"period":"2017-01-01","value":11063.54},{"period":"2018-01-01","value":10690.29},{"period":"2019-01-01","value":9921.71}],"source":"https://data.gov.my/data-catalogue/ghg_emissions","note":"Agricultural sources. Published in gigagrams (Gg), which is kilotonnes. No sector breakdown after 2019. Source: data.gov.my, © Government of Malaysia, licensed CC BY 4.0. Reshaped into a series by AI Root; not published in this form by data.gov.my.","jurisdiction":"MY"},"source_url":"https://data.gov.my/data-catalogue/ghg_emissions","publisher":"Ministry of Natural Resources and Environmental Sustainability (NRES) via data.gov.my","fetched_at":"2026-09-12T14:23:44.868439+00:00","confidence":"high"},{"entity_id":"series-my-emissions-energy","record_type":"metric_series","jurisdiction":"MY","data":{"id":"my-emissions-energy","name":"Malaysia GHG emissions — energy sector","unit":"kt CO2e","category":"emissions","points":[{"period":"2014-01-01","value":255079.75},{"period":"2015-01-01","value":256850.16},{"period":"2016-01-01","value":253850.16},{"period":"2017-01-01","value":252710.49},{"period":"2018-01-01","value":255231.55},{"period":"2019-01-01","value":259326.11}],"source":"https://data.gov.my/data-catalogue/ghg_emissions","note":"THE WHOLE ENERGY SECTOR — transport and industrial fuel combustion as well as power generation. It is NOT a grid emissions factor and must never be divided by electricity supply to make one: that lands near 1,700 g/kWh against a real Malaysian grid around 500-600, and looks entirely plausible to anyone who does not know what is inside the numerator. Published in gigagrams (Gg), which is kilotonnes. No sector breakdown after 2019. Source: data.gov.my, © Government of Malaysia, licensed CC BY 4.0. Reshaped into a series by AI Root; not published in this form by data.gov.my.","jurisdiction":"MY"},"source_url":"https://data.gov.my/data-catalogue/ghg_emissions","publisher":"Ministry of Natural Resources and Environmental Sustainability (NRES) via data.gov.my","fetched_at":"2026-09-12T14:23:44.868439+00:00","confidence":"high"},{"entity_id":"series-my-emissions-industrial-processes","record_type":"metric_series","jurisdiction":"MY","data":{"id":"my-emissions-industrial-processes","name":"Malaysia GHG emissions — industrial processes","unit":"kt CO2e","category":"emissions","points":[{"period":"2014-01-01","value":20235.4},{"period":"2015-01-01","value":22243.93},{"period":"2016-01-01","value":23746.04},{"period":"2017-01-01","value":24203.62},{"period":"2018-01-01","value":26697.07},{"period":"2019-01-01","value":32853.8}],"source":"https://data.gov.my/data-catalogue/ghg_emissions","note":"IPPU. Published in gigagrams (Gg), which is kilotonnes. No sector breakdown after 2019. Source: data.gov.my, © Government of Malaysia, licensed CC BY 4.0. Reshaped into a series by AI Root; not published in this form by data.gov.my.","jurisdiction":"MY"},"source_url":"https://data.gov.my/data-catalogue/ghg_emissions","publisher":"Ministry of Natural Resources and Environmental Sustainability (NRES) via data.gov.my","fetched_at":"2026-09-12T14:23:44.868439+00:00","confidence":"high"},{"entity_id":"series-my-emissions-lulucf","record_type":"metric_series","jurisdiction":"MY","data":{"id":"my-emissions-lulucf","name":"Malaysia GHG emissions — LULUCF","unit":"kt CO2e","category":"emissions","points":[{"period":"2014-01-01","value":-249952.54},{"period":"2015-01-01","value":-244032.12},{"period":"2016-01-01","value":-215375.05},{"period":"2017-01-01","value":-243369.73},{"period":"2018-01-01","value":-241264.08},{"period":"2019-01-01","value":-214714.54}],"source":"https://data.gov.my/data-catalogue/ghg_emissions","note":"Always NEGATIVE for Malaysia: forestry is a net sink, so this series sits below zero by nature and is not a sign-flipped error. Published in gigagrams (Gg), which is kilotonnes. No sector breakdown after 2019. Source: data.gov.my, © Government of Malaysia, licensed CC BY 4.0. Reshaped into a series by AI Root; not published in this form by data.gov.my.","jurisdiction":"MY"},"source_url":"https://data.gov.my/data-catalogue/ghg_emissions","publisher":"Ministry of Natural Resources and Environmental Sustainability (NRES) via data.gov.my","fetched_at":"2026-09-12T14:23:44.868439+00:00","confidence":"high"},{"entity_id":"series-my-emissions-net","record_type":"metric_series","jurisdiction":"MY","data":{"id":"my-emissions-net","name":"Malaysia GHG emissions — net including LULUCF","unit":"kt CO2e","category":"emissions","points":[{"period":"2014-01-01","value":64835.93},{"period":"2015-01-01","value":74492.91},{"period":"2016-01-01","value":98804.4},{"period":"2017-01-01","value":73193.32},{"period":"2018-01-01","value":79602.7},{"period":"2019-01-01","value":115643.68}],"source":"https://data.gov.my/data-catalogue/ghg_emissions","note":"Net of land use, land-use change and forestry. Published in gigagrams (Gg), which is kilotonnes. No sector breakdown after 2019. Source: data.gov.my, © Government of Malaysia, licensed CC BY 4.0. Reshaped into a series by AI Root; not published in this form by data.gov.my.","jurisdiction":"MY"},"source_url":"https://data.gov.my/data-catalogue/ghg_emissions","publisher":"Ministry of Natural Resources and Environmental Sustainability (NRES) via data.gov.my","fetched_at":"2026-09-12T14:23:44.868439+00:00","confidence":"high"},{"entity_id":"series-my-emissions-total","record_type":"metric_series","jurisdiction":"MY","data":{"id":"my-emissions-total","name":"Malaysia GHG emissions — total excluding LULUCF","unit":"kt CO2e","category":"emissions","points":[{"period":"2014-01-01","value":314788.47},{"period":"2015-01-01","value":318525.03},{"period":"2016-01-01","value":314179.45},{"period":"2017-01-01","value":316563.05},{"period":"2018-01-01","value":320866.78},{"period":"2019-01-01","value":330358.21},{"period":"2020-01-01","value":323378.81},{"period":"2021-01-01","value":325705.28}],"source":"https://data.gov.my/data-catalogue/ghg_emissions","note":"The headline inventory total. Published in gigagrams (Gg), which is kilotonnes. No sector breakdown after 2019. Source: data.gov.my, © Government of Malaysia, licensed CC BY 4.0. Reshaped into a series by AI Root; not published in this form by data.gov.my.","jurisdiction":"MY"},"source_url":"https://data.gov.my/data-catalogue/ghg_emissions","publisher":"Ministry of Natural Resources and Environmental Sustainability (NRES) via data.gov.my","fetched_at":"2026-09-12T14:23:44.868439+00:00","confidence":"high"},{"entity_id":"series-my-emissions-waste","record_type":"metric_series","jurisdiction":"MY","data":{"id":"my-emissions-waste","name":"Malaysia GHG emissions — waste","unit":"kt CO2e","category":"emissions","points":[{"period":"2014-01-01","value":28377.66},{"period":"2015-01-01","value":28783.91},{"period":"2016-01-01","value":26565.41},{"period":"2017-01-01","value":28585.4},{"period":"2018-01-01","value":28247.87},{"period":"2019-01-01","value":28256.59}],"source":"https://data.gov.my/data-catalogue/ghg_emissions","note":"Waste sources. Published in gigagrams (Gg), which is kilotonnes. No sector breakdown after 2019. Source: data.gov.my, © Government of Malaysia, licensed CC BY 4.0. Reshaped into a series by AI Root; not published in this form by data.gov.my.","jurisdiction":"MY"},"source_url":"https://data.gov.my/data-catalogue/ghg_emissions","publisher":"Ministry of Natural Resources and Environmental Sustainability (NRES) via data.gov.my","fetched_at":"2026-09-12T14:23:44.868439+00:00","confidence":"high"},{"entity_id":"series-my-grid-imports","record_type":"metric_series","jurisdiction":"MY","data":{"id":"my-grid-imports","name":"Malaysia electricity supply — imports","unit":"GWh","category":"grid","points":[{"period":"2018-01-01","value":1.339},{"period":"2018-02-01","value":6.482},{"period":"2018-03-01","value":0.08},{"period":"2018-04-01","value":2.341},{"period":"2018-05-01","value":0.083},{"period":"2018-06-01","value":0.077},{"period":"2018-07-01","value":2.179},{"period":"2018-08-01","value":4.441},{"period":"2018-09-01","value":0.671},{"period":"2018-10-01","value":6.534},{"period":"2018-11-01","value":0.849},{"period":"2018-12-01","value":0.0},{"period":"2019-01-01","value":0.043},{"period":"2019-02-01","value":0.452},{"period":"2019-03-01","value":4.392},{"period":"2019-04-01","value":0.0},{"period":"2019-05-01","value":0.0},{"period":"2019-06-01","value":0.396},{"period":"2019-07-01","value":0.0},{"period":"2019-08-01","value":1.449},{"period":"2019-09-01","value":5.28},{"period":"2019-10-01","value":4.543},{"period":"2019-11-01","value":5.076},{"period":"2019-12-01","value":14.311},{"period":"2020-01-01","value":0.0},{"period":"2020-02-01","value":0.001},{"period":"2020-03-01","value":0.0},{"period":"2020-04-01","value":0.0},{"period":"2020-05-01","value":0.004},{"period":"2020-06-01","value":0.004},{"period":"2020-07-01","value":0.0},{"period":"2020-08-01","value":0.0},{"period":"2020-09-01","value":3.275},{"period":"2020-10-01","value":5.218},{"period":"2020-11-01","value":1.228},{"period":"2020-12-01","value":8.169},{"period":"2021-01-01","value":0.402},{"period":"2021-02-01","value":8.757},{"period":"2021-03-01","value":1.3},{"period":"2021-04-01","value":16.449},{"period":"2021-05-01","value":3.606},{"period":"2021-06-01","value":0.143},{"period":"2021-07-01","value":0.337},{"period":"2021-08-01","value":0.894},{"period":"2021-09-01","value":0.0},{"period":"2021-10-01","value":0.0},{"period":"2021-11-01","value":1.916},{"period":"2021-12-01","value":0.01},{"period":"2022-01-01","value":0.0},{"period":"2022-02-01","value":0.073},{"period":"2022-03-01","value":0.0},{"period":"2022-04-01","value":0.062},{"period":"2022-05-01","value":1.473},{"period":"2022-06-01","value":0.008},{"period":"2022-07-01","value":0.814},{"period":"2022-08-01","value":0.0},{"period":"2022-09-01","value":0.0},{"period":"2022-10-01","value":0.0},{"period":"2022-11-01","value":0.119},{"period":"2022-12-01","value":0.601},{"period":"2023-01-01","value":0.027},{"period":"2023-02-01","value":0.088},{"period":"2023-03-01","value":0.012},{"period":"2023-04-01","value":0.004},{"period":"2023-05-01","value":21.935},{"period":"2023-06-01","value":0.004},{"period":"2023-07-01","value":0.022},{"period":"2023-08-01","value":0.022},{"period":"2023-09-01","value":10.684},{"period":"2023-10-01","value":0.008},{"period":"2023-11-01","value":0.005},{"period":"2023-12-01","value":0.005},{"period":"2024-01-01","value":0.005},{"period":"2024-02-01","value":0.0},{"period":"2024-03-01","value":40.625},{"period":"2024-04-01","value":3.192},{"period":"2024-05-01","value":0.002},{"period":"2024-06-01","value":0.002}],"source":"https://data.gov.my/data-catalogue/electricity_supply","note":"Cross-border imports, which have fallen to essentially nil since 2021. Published as millions of kWh (MkWh), which is GWh. The most recent six months are provisional. Source: data.gov.my, © Government of Malaysia, licensed CC BY 4.0. Reshaped into a series by AI Root; not published in this form by data.gov.my.","jurisdiction":"MY"},"source_url":"https://data.gov.my/data-catalogue/electricity_supply","publisher":"Department of Statistics Malaysia / Energy Commission / TNB via data.gov.my","fetched_at":"2026-09-12T14:23:44.866379+00:00","confidence":"high"},{"entity_id":"series-my-grid-local-private","record_type":"metric_series","jurisdiction":"MY","data":{"id":"my-grid-local-private","name":"Malaysia electricity supply — private installations","unit":"GWh","category":"grid","points":[{"period":"2018-01-01","value":188.324},{"period":"2018-02-01","value":175.769},{"period":"2018-03-01","value":190.611},{"period":"2018-04-01","value":163.313},{"period":"2018-05-01","value":154.937},{"period":"2018-06-01","value":155.746},{"period":"2018-07-01","value":155.084},{"period":"2018-08-01","value":155.181},{"period":"2018-09-01","value":154.59},{"period":"2018-10-01","value":177.414},{"period":"2018-11-01","value":178.91},{"period":"2018-12-01","value":194.522},{"period":"2019-01-01","value":181.645},{"period":"2019-02-01","value":159.982},{"period":"2019-03-01","value":181.807},{"period":"2019-04-01","value":179.6},{"period":"2019-05-01","value":185.275},{"period":"2019-06-01","value":183.011},{"period":"2019-07-01","value":177.982},{"period":"2019-08-01","value":176.49},{"period":"2019-09-01","value":177.232},{"period":"2019-10-01","value":183.548},{"period":"2019-11-01","value":191.555},{"period":"2019-12-01","value":191.854},{"period":"2020-01-01","value":212.986},{"period":"2020-02-01","value":201.856},{"period":"2020-03-01","value":208.023},{"period":"2020-04-01","value":197.998},{"period":"2020-05-01","value":189.953},{"period":"2020-06-01","value":187.453},{"period":"2020-07-01","value":191.083},{"period":"2020-08-01","value":189.438},{"period":"2020-09-01","value":190.242},{"period":"2020-10-01","value":199.864},{"period":"2020-11-01","value":185.723},{"period":"2020-12-01","value":195.517},{"period":"2021-01-01","value":193.27},{"period":"2021-02-01","value":191.076},{"period":"2021-03-01","value":201.548},{"period":"2021-04-01","value":185.595},{"period":"2021-05-01","value":192.547},{"period":"2021-06-01","value":179.103},{"period":"2021-07-01","value":173.869},{"period":"2021-08-01","value":166.0},{"period":"2021-09-01","value":172.855},{"period":"2021-10-01","value":191.423},{"period":"2021-11-01","value":181.662},{"period":"2021-12-01","value":183.796},{"period":"2022-01-01","value":187.722},{"period":"2022-02-01","value":188.486},{"period":"2022-03-01","value":189.416},{"period":"2022-04-01","value":184.381},{"period":"2022-05-01","value":187.435},{"period":"2022-06-01","value":187.848},{"period":"2022-07-01","value":188.556},{"period":"2022-08-01","value":188.461},{"period":"2022-09-01","value":188.716},{"period":"2022-10-01","value":188.724},{"period":"2022-11-01","value":189.388},{"period":"2022-12-01","value":189.805},{"period":"2023-01-01","value":190.849},{"period":"2023-02-01","value":186.316},{"period":"2023-03-01","value":188.665},{"period":"2023-04-01","value":188.347},{"period":"2023-05-01","value":189.531},{"period":"2023-06-01","value":185.315},{"period":"2023-07-01","value":185.245},{"period":"2023-08-01","value":185.268},{"period":"2023-09-01","value":189.778},{"period":"2023-10-01","value":190.058},{"period":"2023-11-01","value":190.532},{"period":"2023-12-01","value":189.512},{"period":"2024-01-01","value":190.852},{"period":"2024-02-01","value":187.782},{"period":"2024-03-01","value":187.035},{"period":"2024-04-01","value":189.409},{"period":"2024-05-01","value":190.057},{"period":"2024-06-01","value":190.675}],"source":"https://data.gov.my/data-catalogue/electricity_supply","note":"Licensed private installations feeding the grid — about 1.2% of supply, so a chart scaled to it will mislead. Published as millions of kWh (MkWh), which is GWh. The most recent six months are provisional. Source: data.gov.my, © Government of Malaysia, licensed CC BY 4.0. Reshaped into a series by AI Root; not published in this form by data.gov.my.","jurisdiction":"MY"},"source_url":"https://data.gov.my/data-catalogue/electricity_supply","publisher":"Department of Statistics Malaysia / Energy Commission / TNB via data.gov.my","fetched_at":"2026-09-12T14:23:44.866379+00:00","confidence":"high"},{"entity_id":"series-my-grid-local-public","record_type":"metric_series","jurisdiction":"MY","data":{"id":"my-grid-local-public","name":"Malaysia electricity supply — public installations","unit":"GWh","category":"grid","points":[{"period":"2018-01-01","value":12966.441},{"period":"2018-02-01","value":11915.045},{"period":"2018-03-01","value":13838.289},{"period":"2018-04-01","value":13439.168},{"period":"2018-05-01","value":13779.662},{"period":"2018-06-01","value":13191.885},{"period":"2018-07-01","value":14094.95},{"period":"2018-08-01","value":14183.276},{"period":"2018-09-01","value":13203.791},{"period":"2018-10-01","value":13898.417},{"period":"2018-11-01","value":13371.235},{"period":"2018-12-01","value":13536.053},{"period":"2019-01-01","value":13927.144},{"period":"2019-02-01","value":12456.338},{"period":"2019-03-01","value":14446.138},{"period":"2019-04-01","value":14192.125},{"period":"2019-05-01","value":14508.959},{"period":"2019-06-01","value":13363.561},{"period":"2019-07-01","value":14323.553},{"period":"2019-08-01","value":14178.801},{"period":"2019-09-01","value":13785.427},{"period":"2019-10-01","value":13916.019},{"period":"2019-11-01","value":13530.601},{"period":"2019-12-01","value":13604.964},{"period":"2020-01-01","value":13983.174},{"period":"2020-02-01","value":13355.111},{"period":"2020-03-01","value":13314.368},{"period":"2020-04-01","value":11487.348},{"period":"2020-05-01","value":13073.219},{"period":"2020-06-01","value":13102.861},{"period":"2020-07-01","value":13675.854},{"period":"2020-08-01","value":14072.979},{"period":"2020-09-01","value":13533.376},{"period":"2020-10-01","value":14086.213},{"period":"2020-11-01","value":13247.822},{"period":"2020-12-01","value":13645.57},{"period":"2021-01-01","value":13375.571},{"period":"2021-02-01","value":12605.344},{"period":"2021-03-01","value":14646.756},{"period":"2021-04-01","value":14147.412},{"period":"2021-05-01","value":14255.298},{"period":"2021-06-01","value":12496.041},{"period":"2021-07-01","value":13053.632},{"period":"2021-08-01","value":13422.161},{"period":"2021-09-01","value":13637.639},{"period":"2021-10-01","value":14688.523},{"period":"2021-11-01","value":13953.793},{"period":"2021-12-01","value":14322.163},{"period":"2022-01-01","value":14133.5},{"period":"2022-02-01","value":12645.212},{"period":"2022-03-01","value":14650.684},{"period":"2022-04-01","value":14287.225},{"period":"2022-05-01","value":14679.488},{"period":"2022-06-01","value":14319.287},{"period":"2022-07-01","value":14761.088},{"period":"2022-08-01","value":14742.197},{"period":"2022-09-01","value":14084.664},{"period":"2022-10-01","value":14366.726},{"period":"2022-11-01","value":13883.182},{"period":"2022-12-01","value":14004.442},{"period":"2023-01-01","value":13888.497},{"period":"2023-02-01","value":12942.325},{"period":"2023-03-01","value":14711.515},{"period":"2023-04-01","value":14229.136},{"period":"2023-05-01","value":15551.892},{"period":"2023-06-01","value":14722.35},{"period":"2023-07-01","value":15014.527},{"period":"2023-08-01","value":15124.806},{"period":"2023-09-01","value":14590.072},{"period":"2023-10-01","value":15404.286},{"period":"2023-11-01","value":14532.294},{"period":"2023-12-01","value":14741.931},{"period":"2024-01-01","value":14984.911},{"period":"2024-02-01","value":14370.116},{"period":"2024-03-01","value":15965.606},{"period":"2024-04-01","value":15315.453},{"period":"2024-05-01","value":16206.717},{"period":"2024-06-01","value":15240.723}],"source":"https://data.gov.my/data-catalogue/electricity_supply","note":"Licensed public utilities: TNB in Peninsular Malaysia, Sabah Electricity and Sarawak Energy, plus the IPPs that sell to them. Published as millions of kWh (MkWh), which is GWh. The most recent six months are provisional. Source: data.gov.my, © Government of Malaysia, licensed CC BY 4.0. Reshaped into a series by AI Root; not published in this form by data.gov.my.","jurisdiction":"MY"},"source_url":"https://data.gov.my/data-catalogue/electricity_supply","publisher":"Department of Statistics Malaysia / Energy Commission / TNB via data.gov.my","fetched_at":"2026-09-12T14:23:44.866379+00:00","confidence":"high"},{"entity_id":"series-my-grid-total","record_type":"metric_series","jurisdiction":"MY","data":{"id":"my-grid-total","name":"Malaysia electricity supply — total","unit":"GWh","category":"grid","points":[{"period":"2018-01-01","value":13156.104},{"period":"2018-02-01","value":12097.297},{"period":"2018-03-01","value":14028.979},{"period":"2018-04-01","value":13604.822},{"period":"2018-05-01","value":13934.683},{"period":"2018-06-01","value":13347.707},{"period":"2018-07-01","value":14252.213},{"period":"2018-08-01","value":14342.898},{"period":"2018-09-01","value":13359.052},{"period":"2018-10-01","value":14082.366},{"period":"2018-11-01","value":13550.993},{"period":"2018-12-01","value":13730.575},{"period":"2019-01-01","value":14108.833},{"period":"2019-02-01","value":12616.772},{"period":"2019-03-01","value":14632.337},{"period":"2019-04-01","value":14371.725},{"period":"2019-05-01","value":14694.234},{"period":"2019-06-01","value":13546.968},{"period":"2019-07-01","value":14501.535},{"period":"2019-08-01","value":14356.74},{"period":"2019-09-01","value":13967.939},{"period":"2019-10-01","value":14104.11},{"period":"2019-11-01","value":13727.233},{"period":"2019-12-01","value":13811.128},{"period":"2020-01-01","value":14196.16},{"period":"2020-02-01","value":13556.968},{"period":"2020-03-01","value":13522.391},{"period":"2020-04-01","value":11685.347},{"period":"2020-05-01","value":13263.176},{"period":"2020-06-01","value":13290.318},{"period":"2020-07-01","value":13866.936},{"period":"2020-08-01","value":14262.416},{"period":"2020-09-01","value":13726.893},{"period":"2020-10-01","value":14291.295},{"period":"2020-11-01","value":13434.773},{"period":"2020-12-01","value":13849.256},{"period":"2021-01-01","value":13569.243},{"period":"2021-02-01","value":12805.178},{"period":"2021-03-01","value":14849.604},{"period":"2021-04-01","value":14349.456},{"period":"2021-05-01","value":14451.451},{"period":"2021-06-01","value":12675.287},{"period":"2021-07-01","value":13227.839},{"period":"2021-08-01","value":13589.055},{"period":"2021-09-01","value":13810.493},{"period":"2021-10-01","value":14879.947},{"period":"2021-11-01","value":14137.371},{"period":"2021-12-01","value":14505.968},{"period":"2022-01-01","value":14321.223},{"period":"2022-02-01","value":12833.772},{"period":"2022-03-01","value":14840.1},{"period":"2022-04-01","value":14471.668},{"period":"2022-05-01","value":14868.396},{"period":"2022-06-01","value":14507.143},{"period":"2022-07-01","value":14950.457},{"period":"2022-08-01","value":14930.658},{"period":"2022-09-01","value":14273.38},{"period":"2022-10-01","value":14555.45},{"period":"2022-11-01","value":14072.689},{"period":"2022-12-01","value":14194.848},{"period":"2023-01-01","value":14079.373},{"period":"2023-02-01","value":13128.729},{"period":"2023-03-01","value":14900.192},{"period":"2023-04-01","value":14417.487},{"period":"2023-05-01","value":15763.359},{"period":"2023-06-01","value":14907.669},{"period":"2023-07-01","value":15199.794},{"period":"2023-08-01","value":15310.096},{"period":"2023-09-01","value":14790.533},{"period":"2023-10-01","value":15594.352},{"period":"2023-11-01","value":14722.831},{"period":"2023-12-01","value":14931.447},{"period":"2024-01-01","value":15175.768},{"period":"2024-02-01","value":14557.898},{"period":"2024-03-01","value":16193.266},{"period":"2024-04-01","value":15508.055},{"period":"2024-05-01","value":16396.775},{"period":"2024-06-01","value":15431.4}],"source":"https://data.gov.my/data-catalogue/electricity_supply","note":"All sectors: local generation plus imports. Published as millions of kWh (MkWh), which is GWh. The most recent six months are provisional. Source: data.gov.my, © Government of Malaysia, licensed CC BY 4.0. Reshaped into a series by AI Root; not published in this form by data.gov.my.","jurisdiction":"MY"},"source_url":"https://data.gov.my/data-catalogue/electricity_supply","publisher":"Department of Statistics Malaysia / Energy Commission / TNB via data.gov.my","fetched_at":"2026-09-12T14:23:44.866379+00:00","confidence":"high"},{"entity_id":"org-1265-warnecke-rd-pty-ltd","record_type":"organisation","jurisdiction":"AU","data":{"id":"org-1265-warnecke-rd-pty-ltd","name":"1265 Warnecke Rd Pty Ltd","roles":["developer"],"country":"Australia","jurisdiction":"AU","project_count":1,"tender_count":0,"pipeline_mw":100.0,"states":["SA"],"stages":["announced"],"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-32-instalacion-solar-mazarron-sl","record_type":"organisation","jurisdiction":"ES","data":{"id":"org-32-instalacion-solar-mazarron-sl","name":"32 Instalación Solar Mazarrón SL","roles":["developer"],"country":"Spain","jurisdiction":"ES","project_count":1,"tender_count":0,"pipeline_mw":42.6,"states":["Comunidad de Madrid"],"stages":["committed"],"source":"https://www.gem.wiki/La_Espiga_solar_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-365-future-energy","record_type":"organisation","jurisdiction":"AU","data":{"id":"org-365-future-energy","name":"365 Future Energy","roles":["developer"],"country":"Australia","jurisdiction":"AU","project_count":1,"tender_count":0,"pipeline_mw":1186.0,"states":["QLD"],"stages":["announced"],"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-548-uk-investment-holdings-limited","record_type":"organisation","jurisdiction":"GB","data":{"id":"org-548-uk-investment-holdings-limited","name":"548 UK INVESTMENT HOLDINGS LIMITED","roles":["developer"],"country":"United Kingdom","jurisdiction":"GB","project_count":11,"tender_count":0,"pipeline_mw":3650.0,"states":[],"stages":["announced"],"source":"https://www.neso.energy/data-portal/transmission-entry-capacity-tec-register"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-9-instalacion-solar-mazarron-sl","record_type":"organisation","jurisdiction":"ES","data":{"id":"org-9-instalacion-solar-mazarron-sl","name":"9 Instalación Solar Mazarrón SL","roles":["developer"],"country":"Spain","jurisdiction":"ES","project_count":1,"tender_count":0,"pipeline_mw":42.6,"states":["Castilla-La Mancha"],"stages":["committed"],"source":"https://www.gem.wiki/El_Árbol_solar_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-a-caes-nsw-pty-ltd","record_type":"organisation","jurisdiction":"AU","data":{"id":"org-a-caes-nsw-pty-ltd","name":"A-CAES NSW PTY LTD","roles":["developer"],"country":"Australia","jurisdiction":"AU","project_count":1,"tender_count":0,"pipeline_mw":200.0,"pipeline_mwh":1600.0,"states":["NSW"],"stages":["anticipated"],"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-a-chruach-wind-farm-limited","record_type":"organisation","jurisdiction":"GB","data":{"id":"org-a-chruach-wind-farm-limited","name":"A'CHRUACH WIND FARM LIMITED","roles":["developer"],"country":"United Kingdom","jurisdiction":"GB","project_count":1,"tender_count":0,"pipeline_mw":43.0,"states":[],"stages":["operational"],"source":"https://www.neso.energy/data-portal/transmission-entry-capacity-tec-register"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-a-v-monte-festeiros-slu","record_type":"organisation","jurisdiction":"ES","data":{"id":"org-a-v-monte-festeiros-slu","name":"A.V. Monte Festeiros SLU","roles":["developer"],"country":"Spain","jurisdiction":"ES","project_count":1,"tender_count":0,"pipeline_mw":48.0,"states":["Galicia"],"stages":["committed"],"source":"https://www.gem.wiki/Monte_Festeiros_wind_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-abag-banner-jingneng-smart-and-clean-energy-co-ltd","record_type":"organisation","jurisdiction":"CN","data":{"id":"org-abag-banner-jingneng-smart-and-clean-energy-co-ltd","name":"Abag Banner Jingneng Smart and Clean Energy Co Ltd","roles":["developer"],"country":"China","jurisdiction":"CN","project_count":1,"tender_count":0,"pipeline_mw":200.0,"states":["Inner Mongolia"],"stages":["operational"],"source":"https://www.gem.wiki/Inner_Mongolia_Xilingol_Desert_Control_wind_farms"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-abag-banner-jingneng-zhihui-clean-energy-co-ltd","record_type":"organisation","jurisdiction":"CN","data":{"id":"org-abag-banner-jingneng-zhihui-clean-energy-co-ltd","name":"Abag Banner Jingneng Zhihui Clean Energy Co Ltd","roles":["developer"],"country":"China","jurisdiction":"CN","project_count":1,"tender_count":0,"pipeline_mw":100.0,"states":["Inner Mongolia"],"stages":["operational"],"source":"https://www.gem.wiki/Inner_Mongolia_Xilingol_Desert_Control_solar_farms"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-abag-banner-taifu-shengyuan-new-energy-co-ltd","record_type":"organisation","jurisdiction":"CN","data":{"id":"org-abag-banner-taifu-shengyuan-new-energy-co-ltd","name":"Abag Banner Taifu Shengyuan New Energy Co Ltd","roles":["developer"],"country":"China","jurisdiction":"CN","project_count":2,"tender_count":0,"pipeline_mw":400.0,"states":["Inner Mongolia"],"stages":["committed","under_construction"],"source":"https://www.gem.wiki/Inner_Mongolia_Xilingol_Third_Group_Power_Export_Abag_Bieligutai_solar_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-aban-energies-ltd","record_type":"organisation","jurisdiction":"IN","data":{"id":"org-aban-energies-ltd","name":"Aban Energies Ltd","roles":["developer"],"country":"India","jurisdiction":"IN","project_count":1,"tender_count":0,"pipeline_mw":70.0,"states":["Tamil Nadu"],"stages":["operational"],"source":"https://www.gem.wiki/Radhapuram_(Aban)_wind_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-abarloar-solar-sl","record_type":"organisation","jurisdiction":"ES","data":{"id":"org-abarloar-solar-sl","name":"Abarloar Solar SL","roles":["developer"],"country":"Spain","jurisdiction":"ES","project_count":1,"tender_count":0,"pipeline_mw":82.5,"states":["Comunidad de Madrid"],"stages":["committed"],"source":"https://www.gem.wiki/Abarloar_solar_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-abbotshaugh-energy-storage-limited","record_type":"organisation","jurisdiction":"GB","data":{"id":"org-abbotshaugh-energy-storage-limited","name":"ABBOTSHAUGH ENERGY STORAGE LIMITED","roles":["developer"],"country":"United Kingdom","jurisdiction":"GB","project_count":1,"tender_count":0,"pipeline_mw":500.0,"states":[],"stages":["announced"],"source":"https://www.neso.energy/data-portal/transmission-entry-capacity-tec-register"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-abc-renewable-energy","record_type":"organisation","jurisdiction":"IN","data":{"id":"org-abc-renewable-energy","name":"ABC Renewable Energy","roles":["developer"],"country":"India","jurisdiction":"IN","project_count":3,"tender_count":0,"pipeline_mw":316.0,"states":["Andhra Pradesh","Rajasthan"],"stages":["under_construction"],"source":"https://www.gem.wiki/Chhodiya_(ABC)_hybrid_solar_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-abdul-latif-jameel-energy-and-environmental-services","record_type":"organisation","jurisdiction":"ES","data":{"id":"org-abdul-latif-jameel-energy-and-environmental-services","name":"Abdul Latif Jameel Energy and Environmental Services","roles":["developer"],"country":"Spain","jurisdiction":"ES","project_count":3,"tender_count":0,"pipeline_mw":126.9,"states":["Extremadura"],"stages":["operational"],"source":"https://www.gem.wiki/San_Serván_solar_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-abei-energy","record_type":"organisation","jurisdiction":"ES","data":{"id":"org-abei-energy","name":"Abei Energy","roles":["developer"],"country":"Spain","jurisdiction":"ES","project_count":6,"tender_count":0,"pipeline_mw":461.2,"states":["Andalucía","Castilla y León"],"stages":["cancelled","committed","operational","withdrawn"],"source":"https://www.gem.wiki/Palma_del_Río_PV_solar_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-abei-energy-cspv-three-sl","record_type":"organisation","jurisdiction":"ES","data":{"id":"org-abei-energy-cspv-three-sl","name":"Abei Energy CSPV Three SL","roles":["developer"],"country":"Spain","jurisdiction":"ES","project_count":1,"tender_count":0,"pipeline_mw":47.1,"states":["Castilla y León"],"stages":["committed"],"source":"https://www.gem.wiki/Mudarra_solar_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-abei-energy-limited","record_type":"organisation","jurisdiction":"GB","data":{"id":"org-abei-energy-limited","name":"ABEI ENERGY LIMITED","roles":["developer"],"country":"United Kingdom","jurisdiction":"GB","project_count":4,"tender_count":0,"pipeline_mw":224.8,"states":[],"stages":["announced"],"source":"https://www.neso.energy/data-portal/transmission-entry-capacity-tec-register"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-abengoa-sa","record_type":"organisation","jurisdiction":"ES","data":{"id":"org-abengoa-sa","name":"Abengoa SA","roles":["developer"],"country":"Spain","jurisdiction":"ES","project_count":11,"tender_count":0,"pipeline_mw":550.0,"states":["Andalucía","Extremadura"],"stages":["operational"],"source":"https://www.gem.wiki/El_Carpio_1_Thermosolar_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-aberarder-wind-farm-llp","record_type":"organisation","jurisdiction":"GB","data":{"id":"org-aberarder-wind-farm-llp","name":"ABERARDER WIND FARM LLP","roles":["developer"],"country":"United Kingdom","jurisdiction":"GB","project_count":1,"tender_count":0,"pipeline_mw":50.0,"states":[],"stages":["committed"],"source":"https://www.neso.energy/data-portal/transmission-entry-capacity-tec-register"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-aberdeen-offshore-wind-farm-limited","record_type":"organisation","jurisdiction":"GB","data":{"id":"org-aberdeen-offshore-wind-farm-limited","name":"ABERDEEN OFFSHORE WIND FARM LIMITED","roles":["developer"],"country":"United Kingdom","jurisdiction":"GB","project_count":1,"tender_count":0,"pipeline_mw":95.5,"states":[],"stages":["operational"],"source":"https://www.neso.energy/data-portal/transmission-entry-capacity-tec-register"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-aberedw-energy-park-limited","record_type":"organisation","jurisdiction":"GB","data":{"id":"org-aberedw-energy-park-limited","name":"ABEREDW ENERGY PARK LIMITED","roles":["developer"],"country":"United Kingdom","jurisdiction":"GB","project_count":1,"tender_count":0,"pipeline_mw":133.0,"states":[],"stages":["announced"],"source":"https://www.neso.energy/data-portal/transmission-entry-capacity-tec-register"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-aberthaw-energy-limited","record_type":"organisation","jurisdiction":"GB","data":{"id":"org-aberthaw-energy-limited","name":"ABERTHAW ENERGY LIMITED","roles":["developer"],"country":"United Kingdom","jurisdiction":"GB","project_count":1,"tender_count":0,"pipeline_mw":249.0,"states":[],"stages":["announced"],"source":"https://www.neso.energy/data-portal/transmission-entry-capacity-tec-register"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-aberthaw-green-limited","record_type":"organisation","jurisdiction":"GB","data":{"id":"org-aberthaw-green-limited","name":"Aberthaw Green Limited","roles":["developer"],"country":"United Kingdom","jurisdiction":"GB","project_count":1,"tender_count":0,"pipeline_mw":57.0,"states":[],"stages":["announced"],"source":"https://www.neso.energy/data-portal/transmission-entry-capacity-tec-register"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-abeto-new-energy-slu","record_type":"organisation","jurisdiction":"ES","data":{"id":"org-abeto-new-energy-slu","name":"Abeto New Energy SLU","roles":["developer"],"country":"Spain","jurisdiction":"ES","project_count":1,"tender_count":0,"pipeline_mw":75.0,"states":["Aragón"],"stages":["committed"],"source":"https://www.gem.wiki/Abeto_New_Energy_solar_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-abo-energy","record_type":"organisation","jurisdiction":"ES","data":{"id":"org-abo-energy","name":"ABO Energy","roles":["developer"],"country":"Spain","jurisdiction":"ES","project_count":1,"tender_count":0,"pipeline_mw":50.0,"states":["Castilla y León"],"stages":["committed"],"source":"https://www.gem.wiki/Berg_I_wind_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-abo-energy-united-kingdom-ltd","record_type":"organisation","jurisdiction":"GB","data":{"id":"org-abo-energy-united-kingdom-ltd","name":"ABO ENERGY UNITED KINGDOM LTD","roles":["developer"],"country":"United Kingdom","jurisdiction":"GB","project_count":1,"tender_count":0,"pipeline_mw":100.0,"states":[],"stages":["announced"],"source":"https://www.neso.energy/data-portal/transmission-entry-capacity-tec-register"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-abo-wind-ag","record_type":"organisation","jurisdiction":"ES","data":{"id":"org-abo-wind-ag","name":"ABO Wind AG","roles":["developer"],"country":"Spain","jurisdiction":"ES","project_count":1,"tender_count":0,"pipeline_mw":53.8,"states":["Castilla-La Mancha"],"stages":["committed"],"source":"https://www.gem.wiki/ISF_Benejama_solar_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-abo-wind-espana-sa","record_type":"organisation","jurisdiction":"ES","data":{"id":"org-abo-wind-espana-sa","name":"ABO Wind España SA","roles":["developer"],"country":"Spain","jurisdiction":"ES","project_count":5,"tender_count":0,"pipeline_mw":250.0,"states":["Cataluña"],"stages":["cancelled","withdrawn"],"source":"https://www.gem.wiki/Tramuntana_wind_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-abrel-mp-renewables-ltd","record_type":"organisation","jurisdiction":"IN","data":{"id":"org-abrel-mp-renewables-ltd","name":"ABREL (MP) Renewables Ltd","roles":["developer"],"country":"India","jurisdiction":"IN","project_count":1,"tender_count":0,"pipeline_mw":50.0,"states":["Madhya Pradesh"],"stages":["under_construction"],"source":"https://www.gem.wiki/Dhar_wind_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-abrel-rj-projects-ltd","record_type":"organisation","jurisdiction":"IN","data":{"id":"org-abrel-rj-projects-ltd","name":"Abrel (RJ) Projects Ltd","roles":["developer"],"country":"India","jurisdiction":"IN","project_count":2,"tender_count":0,"pipeline_mw":353.0,"states":["Gujarat","Karnataka"],"stages":["under_construction"],"source":"https://www.gem.wiki/Ashapar_solar_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-abrel-solar-power-ltd","record_type":"organisation","jurisdiction":"IN","data":{"id":"org-abrel-solar-power-ltd","name":"ABREL Solar Power Ltd","roles":["developer"],"country":"India","jurisdiction":"IN","project_count":1,"tender_count":0,"pipeline_mw":87.0,"states":["Madhya Pradesh"],"stages":["operational"],"source":"https://www.gem.wiki/Dhar_(ABREL)_wind_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-abu-dhabi-future-energy-co","record_type":"organisation","jurisdiction":"SA","data":{"id":"org-abu-dhabi-future-energy-co","name":"Abu Dhabi Future Energy Co","roles":["developer"],"country":"Saudi Arabia","jurisdiction":"SA","project_count":1,"tender_count":0,"pipeline_mw":2000.0,"states":[],"stages":["committed"],"source":"https://www.gem.wiki/Al_Sadawi_solar_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-abu-dhabi-ports-adp","record_type":"organisation","jurisdiction":"AE","data":{"id":"org-abu-dhabi-ports-adp","name":"Abu Dhabi Ports (ADP)","roles":["developer"],"country":"United Arab Emirates","jurisdiction":"AE","project_count":1,"tender_count":0,"pipeline_mw":2000.0,"states":["Abu Dhabi"],"stages":["withdrawn"],"source":"https://www.gem.wiki/Taqa-KIZAD_Green_Ammonia_solar_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-abu-dhabi-tourism-development-and-investment-co","record_type":"organisation","jurisdiction":"AE","data":{"id":"org-abu-dhabi-tourism-development-and-investment-co","name":"Abu Dhabi Tourism Development and Investment Co","roles":["developer"],"country":"United Arab Emirates","jurisdiction":"AE","project_count":1,"tender_count":0,"pipeline_mw":45.0,"states":["Abu Dhabi"],"stages":["operational"],"source":"https://www.gem.wiki/Sir_Bani_Yas_Island_wind_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-abu-renewables-india-pvt-ltd","record_type":"organisation","jurisdiction":"IN","data":{"id":"org-abu-renewables-india-pvt-ltd","name":"Abu Renewables India Pvt Ltd","roles":["developer"],"country":"India","jurisdiction":"IN","project_count":1,"tender_count":0,"pipeline_mw":340.0,"states":["Rajasthan"],"stages":["under_construction"],"source":"https://www.gem.wiki/Bikaner_(Abu_Renewables)_solar_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-acc-acc-ltd","record_type":"organisation","jurisdiction":"IN","data":{"id":"org-acc-acc-ltd","name":"Acc Acc ltd","roles":["developer"],"country":"India","jurisdiction":"IN","project_count":3,"tender_count":0,"pipeline_mw":165.0,"states":[],"stages":["operational"],"source":"http://www.acclimited.com/"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-acciona-energia-sau","record_type":"organisation","jurisdiction":"ES","data":{"id":"org-acciona-energia-sau","name":"Acciona Energía SAU","roles":["developer"],"country":"Spain","jurisdiction":"ES","project_count":72,"tender_count":0,"pipeline_mw":3438.2,"states":["Andalucía","Aragón","Asturias","Castile and León","Castilla y León","Castilla-La Mancha","Cataluña","Comunidad Foral de Navarra","Comunidad Valenciana","Galicia","Rajasthan"],"stages":["cancelled","committed","operational","retired","withdrawn"],"source":"https://www.gem.wiki/Cristo_Bailones_solar_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-acciona-energy","record_type":"organisation","jurisdiction":"AU","data":{"id":"org-acciona-energy","name":"ACCIONA Energy","roles":["developer"],"country":"Australia","jurisdiction":"AU","project_count":4,"tender_count":0,"pipeline_mw":946.2,"pipeline_mwh":2400.0,"states":["QLD","VIC"],"stages":["announced","operational"],"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-acciona-energy-australia-global","record_type":"organisation","jurisdiction":"AU","data":{"id":"org-acciona-energy-australia-global","name":"Acciona Energy Australia Global","roles":["developer"],"country":"Australia","jurisdiction":"AU","project_count":3,"tender_count":0,"pipeline_mw":1050.0,"pipeline_mwh":1650.0,"states":["NSW","QLD","VIC"],"stages":["announced"],"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-acciona-energy-australia-global-pty-ltd","record_type":"organisation","jurisdiction":"AU","data":{"id":"org-acciona-energy-australia-global-pty-ltd","name":"Acciona Energy Australia Global Pty Ltd","roles":["developer"],"country":"Australia","jurisdiction":"AU","project_count":2,"tender_count":0,"pipeline_mw":2097.8,"pipeline_mwh":15390.0,"states":["NSW","QLD"],"stages":["announced","operational"],"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-acciona-energy-global-australia","record_type":"organisation","jurisdiction":"AU","data":{"id":"org-acciona-energy-global-australia","name":"Acciona Energy Global Australia","roles":["developer"],"country":"Australia","jurisdiction":"AU","project_count":2,"tender_count":0,"pipeline_mw":1239.6,"states":["QLD","VIC"],"stages":["announced"],"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-acciona-nr","record_type":"organisation","jurisdiction":"AU","data":{"id":"org-acciona-nr","name":"acciona_NR","roles":["developer"],"country":"Australia","jurisdiction":"AU","project_count":1,"tender_count":0,"pipeline_mw":216.6,"states":["NSW"],"stages":["announced"],"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-acciona-sa","record_type":"organisation","jurisdiction":"ES","data":{"id":"org-acciona-sa","name":"Acciona SA","roles":["developer"],"country":"Spain","jurisdiction":"ES","project_count":11,"tender_count":0,"pipeline_mw":633.7,"states":["Andalucía","Castilla-La Mancha","Extremadura","Karnataka"],"stages":["operational"],"source":"https://www.gem.wiki/Bolarque_solar_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-acen-australia","record_type":"organisation","jurisdiction":"AU","data":{"id":"org-acen-australia","name":"ACEN Australia","roles":["developer"],"country":"Australia","jurisdiction":"AU","project_count":5,"tender_count":0,"pipeline_mw":1002.0,"pipeline_mwh":1760.0,"states":["NSW","QLD"],"stages":["announced","anticipated","operational"],"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-acen-australia-pty-ltd","record_type":"organisation","jurisdiction":"AU","data":{"id":"org-acen-australia-pty-ltd","name":"ACEN Australia Pty Ltd","roles":["developer"],"country":"Australia","jurisdiction":"AU","project_count":2,"tender_count":0,"pipeline_mw":531.6,"states":["NSW"],"stages":["announced"],"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-acen-corp","record_type":"organisation","jurisdiction":"IN","data":{"id":"org-acen-corp","name":"ACEN Corp","roles":["developer"],"country":"India","jurisdiction":"IN","project_count":2,"tender_count":0,"pipeline_mw":540.0,"states":["Karnataka","Madhya Pradesh"],"stages":["operational","under_construction"],"source":"https://www.gem.wiki/Masaya_solar_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-acen-north-east-tasmania-pty-ltd","record_type":"organisation","jurisdiction":"AU","data":{"id":"org-acen-north-east-tasmania-pty-ltd","name":"ACEN North East Tasmania Pty Ltd","roles":["developer"],"country":"Australia","jurisdiction":"AU","project_count":1,"tender_count":0,"pipeline_mw":1288.8,"states":["TAS"],"stages":["announced"],"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-acen-phoenix-pty-ltd","record_type":"organisation","jurisdiction":"AU","data":{"id":"org-acen-phoenix-pty-ltd","name":"ACEN Phoenix Pty Ltd","roles":["developer"],"country":"Australia","jurisdiction":"AU","project_count":1,"tender_count":0,"pipeline_mw":810.0,"pipeline_mwh":9720.0,"states":["NSW"],"stages":["announced"],"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-acen-renewables","record_type":"organisation","jurisdiction":"AU","data":{"id":"org-acen-renewables","name":"ACEN Renewables","roles":["developer"],"country":"Australia","jurisdiction":"AU","project_count":8,"tender_count":0,"pipeline_mw":2584.0,"pipeline_mwh":1820.0,"states":["NSW","SA"],"stages":["announced","anticipated"],"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-acen-robbins-island-pty-ltd","record_type":"organisation","jurisdiction":"AU","data":{"id":"org-acen-robbins-island-pty-ltd","name":"ACEN Robbins Island PTY LTD","roles":["developer"],"country":"Australia","jurisdiction":"AU","project_count":1,"tender_count":0,"pipeline_mw":928.8,"states":["TAS"],"stages":["announced"],"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-acenergy","record_type":"organisation","jurisdiction":"AU","data":{"id":"org-acenergy","name":"Acenergy","roles":["developer"],"country":"Australia","jurisdiction":"AU","project_count":1,"tender_count":0,"pipeline_mw":250.0,"pipeline_mwh":250.0,"states":["VIC"],"stages":["announced"],"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-acenergy-pty-ltd","record_type":"organisation","jurisdiction":"AU","data":{"id":"org-acenergy-pty-ltd","name":"ACEnergy Pty Ltd","roles":["developer"],"country":"Australia","jurisdiction":"AU","project_count":9,"tender_count":0,"pipeline_mw":4215.6,"pipeline_mwh":9976.2,"states":["NSW","QLD","VIC"],"stages":["announced","anticipated"],"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-acequia-solar-sl","record_type":"organisation","jurisdiction":"ES","data":{"id":"org-acequia-solar-sl","name":"Acequia Solar SL","roles":["developer"],"country":"Spain","jurisdiction":"ES","project_count":1,"tender_count":0,"pipeline_mw":42.5,"states":["Castilla-La Mancha"],"stages":["committed"],"source":"https://www.gem.wiki/Acequia_solar_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-acme-alpha-renewables-pvt-ltd","record_type":"organisation","jurisdiction":"IN","data":{"id":"org-acme-alpha-renewables-pvt-ltd","name":"ACME Alpha Renewables Pvt Ltd","roles":["developer"],"country":"India","jurisdiction":"IN","project_count":1,"tender_count":0,"pipeline_mw":75.0,"states":["Madhya Pradesh"],"stages":["under_construction"],"source":"https://www.gem.wiki/Mandsaur_(ACME)_hybrid_solar_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-acme-group","record_type":"organisation","jurisdiction":"IN","data":{"id":"org-acme-group","name":"ACME Group","roles":["developer"],"country":"India","jurisdiction":"IN","project_count":6,"tender_count":0,"pipeline_mw":873.0,"states":["Andhra Pradesh","Gujarat","Karnataka","Telangana","Uttar Pradesh"],"stages":["committed","operational","under_construction"],"source":"https://www.gem.wiki/Bidar_solar_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-acme-hybrid-urja-pvt-ltd","record_type":"organisation","jurisdiction":"IN","data":{"id":"org-acme-hybrid-urja-pvt-ltd","name":"ACME Hybrid Urja Pvt Ltd","roles":["developer"],"country":"India","jurisdiction":"IN","project_count":1,"tender_count":0,"pipeline_mw":280.0,"states":["Karnataka"],"stages":["under_construction"],"source":"https://www.gem.wiki/Bellary_(ACME)_solar_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-acme-omega-urja-pvt-ltd","record_type":"organisation","jurisdiction":"IN","data":{"id":"org-acme-omega-urja-pvt-ltd","name":"ACME Omega Urja Pvt Ltd","roles":["developer"],"country":"India","jurisdiction":"IN","project_count":1,"tender_count":0,"pipeline_mw":300.0,"states":["Karnataka"],"stages":["under_construction"],"source":"https://www.gem.wiki/Tumkur_(ACME)_II_solar_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-acme-platinum-urja-pvt-ltd","record_type":"organisation","jurisdiction":"IN","data":{"id":"org-acme-platinum-urja-pvt-ltd","name":"ACME Platinum Urja Pvt Ltd","roles":["developer"],"country":"India","jurisdiction":"IN","project_count":1,"tender_count":0,"pipeline_mw":350.0,"states":["Karnataka"],"stages":["under_construction"],"source":"https://www.gem.wiki/Tumkur_(ACME)_solar_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-acme-renewtech-pvt-ltd","record_type":"organisation","jurisdiction":"IN","data":{"id":"org-acme-renewtech-pvt-ltd","name":"ACME Renewtech Pvt Ltd","roles":["developer"],"country":"India","jurisdiction":"IN","project_count":1,"tender_count":0,"pipeline_mw":150.0,"states":["Madhya Pradesh"],"stages":["under_construction"],"source":"https://www.gem.wiki/Pachora_hybrid_(ACME)_solar_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-acme-solar","record_type":"organisation","jurisdiction":"IN","data":{"id":"org-acme-solar","name":"ACME Solar","roles":["developer"],"country":"India","jurisdiction":"IN","project_count":2,"tender_count":0,"pipeline_mw":585.0,"pipeline_mwh":2491.0,"states":["Rajasthan"],"stages":["operational","under_construction"],"source":"https://www.energy-storage.news/india-acme-solar-commissions-480mwh-of-bess-readies-for-fdre-and-peak-supply-deals/"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-acme-solar-holdings-pvt-ltd","record_type":"organisation","jurisdiction":"IN","data":{"id":"org-acme-solar-holdings-pvt-ltd","name":"ACME Solar Holdings Pvt Ltd","roles":["developer"],"country":"India","jurisdiction":"IN","project_count":3,"tender_count":0,"pipeline_mw":345.0,"states":["Gujarat"],"stages":["committed","under_construction","withdrawn"],"source":"https://www.gem.wiki/Banaskantha_(ACME)_solar_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-acme-solar-llc","record_type":"organisation","jurisdiction":"IN","data":{"id":"org-acme-solar-llc","name":"Acme Solar LLC","roles":["developer"],"country":"India","jurisdiction":"IN","project_count":1,"tender_count":0,"pipeline_mw":300.0,"states":["Rajasthan"],"stages":["operational"],"source":"https://www.gem.wiki/Sikar_(Acme)_solar_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-acme-sun-power-pvt-ltd","record_type":"organisation","jurisdiction":"IN","data":{"id":"org-acme-sun-power-pvt-ltd","name":"ACME Sun Power Pvt Ltd","roles":["developer"],"country":"India","jurisdiction":"IN","project_count":2,"tender_count":0,"pipeline_mw":540.0,"states":["Rajasthan"],"stages":["under_construction"],"source":"https://www.gem.wiki/Bhadla_solar_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-acme-surya-power-pvt-ltd","record_type":"organisation","jurisdiction":"IN","data":{"id":"org-acme-surya-power-pvt-ltd","name":"ACME Surya Power Pvt Ltd","roles":["developer"],"country":"India","jurisdiction":"IN","project_count":2,"tender_count":0,"pipeline_mw":440.0,"states":["Rajasthan"],"stages":["under_construction"],"source":"https://www.gem.wiki/Jaisalmer_(ACME)_solar_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-acme-venus-urja-pvt-ltd","record_type":"organisation","jurisdiction":"IN","data":{"id":"org-acme-venus-urja-pvt-ltd","name":"ACME Venus Urja Pvt Ltd","roles":["developer"],"country":"India","jurisdiction":"IN","project_count":1,"tender_count":0,"pipeline_mw":400.0,"states":["Rajasthan"],"stages":["under_construction"],"source":"https://www.gem.wiki/Barmer_(ACME)_solar_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-acorn-power-limited","record_type":"organisation","jurisdiction":"GB","data":{"id":"org-acorn-power-limited","name":"Acorn Power Limited","roles":["developer"],"country":"United Kingdom","jurisdiction":"GB","project_count":1,"tender_count":0,"pipeline_mw":200.0,"states":[],"stages":["announced"],"source":"https://www.neso.energy/data-portal/transmission-entry-capacity-tec-register"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-acs-group","record_type":"organisation","jurisdiction":"ES","data":{"id":"org-acs-group","name":"ACS Group","roles":["developer"],"country":"Spain","jurisdiction":"ES","project_count":11,"tender_count":0,"pipeline_mw":486.0,"states":["Canarias","Castile and León","Castilla y León","Castilla-La Mancha","Cataluña","La Rioja"],"stages":["committed","operational","withdrawn"],"source":"https://www.gem.wiki/Trucafort_wind_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-activo-solar-sl","record_type":"organisation","jurisdiction":"ES","data":{"id":"org-activo-solar-sl","name":"Activo Solar SL","roles":["developer"],"country":"Spain","jurisdiction":"ES","project_count":1,"tender_count":0,"pipeline_mw":43.6,"states":["Comunidad Valenciana"],"stages":["committed"],"source":"https://www.gem.wiki/Monforte_solar_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-acwa-power-co","record_type":"organisation","jurisdiction":"AE","data":{"id":"org-acwa-power-co","name":"ACWA Power Co","roles":["developer"],"country":"United Arab Emirates","jurisdiction":"AE","project_count":18,"tender_count":0,"pipeline_mw":26080.0,"states":["Abu Dhabi","Al Madinah","Al Qassim Province","Al-Qassim","Al-Qassim Province","Central Province","Eastern Province","Makkah","Mecca","Najd","Riyad","Riyadh"],"stages":["committed","operational","under_construction"],"source":"https://www.gem.wiki/Al_Taweelah_solar_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-adam-opel-ag","record_type":"organisation","jurisdiction":"DE","data":{"id":"org-adam-opel-ag","name":"Adam Opel AG","roles":["developer"],"country":"Germany","jurisdiction":"DE","project_count":1,"tender_count":0,"pipeline_mw":112.1,"states":[],"stages":["operational"],"source":"http://data.open-power-system-data.org/"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-adamant-renewables","record_type":"organisation","jurisdiction":"ES","data":{"id":"org-adamant-renewables","name":"Adamant Renewables","roles":["developer"],"country":"Spain","jurisdiction":"ES","project_count":1,"tender_count":0,"pipeline_mw":170.0,"states":["Andalucía"],"stages":["announced"],"source":"https://www.gem.wiki/Peñarroya-Pueblonuevo_Coal_Mine_solar_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-adani-electricity-mumbai-ltd","record_type":"organisation","jurisdiction":"IN","data":{"id":"org-adani-electricity-mumbai-ltd","name":"Adani Electricity Mumbai Ltd","roles":["developer"],"country":"India","jurisdiction":"IN","project_count":1,"tender_count":0,"pipeline_mw":250.0,"states":["Maharashtra"],"stages":["committed"],"source":"https://www.gem.wiki/Maharashtra_(Adani)_wind_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-adani-green","record_type":"organisation","jurisdiction":"IN","data":{"id":"org-adani-green","name":"Adani Green","roles":["developer"],"country":"India","jurisdiction":"IN","project_count":1,"tender_count":0,"pipeline_mw":1126.0,"pipeline_mwh":3530.0,"states":["Gujarat"],"stages":["operational"],"source":"https://www.energy-storage.news/adani-green-energy-reaches-3-37gwh-of-cumulative-bess-capacity-at-indias-khavda-giga-scale-renewable-energy-park/"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-adani-green-energy","record_type":"organisation","jurisdiction":"IN","data":{"id":"org-adani-green-energy","name":"Adani Green Energy","roles":["developer"],"country":"India","jurisdiction":"IN","project_count":36,"tender_count":0,"pipeline_mw":9397.5,"pipeline_mwh":3370.0,"states":["Gujarat","Karnataka","Madhya Pradesh","Rajasthan"],"stages":["cancelled","committed","operational","under_construction","withdrawn"],"source":"https://www.energy-storage.news/adani-green-energy-reaches-3-37gwh-of-cumulative-bess-capacity-at-indias-khavda-giga-scale-renewable-energy-park/"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-adani-group","record_type":"organisation","jurisdiction":"IN","data":{"id":"org-adani-group","name":"Adani Group","roles":["developer"],"country":"India","jurisdiction":"IN","project_count":58,"tender_count":0,"pipeline_mw":13803.0,"states":["Andhra Pradesh","Chhattisgarh","Gujarat","Karnataka","Odisha","Rajasthan","Tamil Nadu","Telangana","Uttar Pradesh"],"stages":["announced","committed","operational","under_construction","withdrawn"],"source":"https://www.gem.wiki/Kamuthi_(Adani)_solar_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-adani-renewable-energy-eight-ltd","record_type":"organisation","jurisdiction":"IN","data":{"id":"org-adani-renewable-energy-eight-ltd","name":"Adani Renewable Energy Eight Ltd","roles":["developer"],"country":"India","jurisdiction":"IN","project_count":1,"tender_count":0,"pipeline_mw":115.0,"states":["Gujarat"],"stages":["under_construction"],"source":"https://www.gem.wiki/Gujarat_(Adani)_II_solar_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-adani-renewable-energy-holding-eighteen-ltd","record_type":"organisation","jurisdiction":"IN","data":{"id":"org-adani-renewable-energy-holding-eighteen-ltd","name":"Adani Renewable Energy Holding Eighteen Ltd","roles":["developer"],"country":"India","jurisdiction":"IN","project_count":1,"tender_count":0,"pipeline_mw":50.0,"states":["Rajasthan"],"stages":["under_construction"],"source":"https://www.gem.wiki/Rajasthan_(Adani)_XIV_solar_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-adani-renewable-energy-holding-four-ltd","record_type":"organisation","jurisdiction":"IN","data":{"id":"org-adani-renewable-energy-holding-four-ltd","name":"Adani Renewable Energy Holding Four Ltd","roles":["developer"],"country":"India","jurisdiction":"IN","project_count":9,"tender_count":0,"pipeline_mw":6016.0,"states":["Gujarat","Rajasthan"],"stages":["operational","under_construction"],"source":"https://www.gem.wiki/Rajasthan_(Adani)_V_solar_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-adani-renewable-energy-holding-twelve-ltd","record_type":"organisation","jurisdiction":"IN","data":{"id":"org-adani-renewable-energy-holding-twelve-ltd","name":"Adani Renewable Energy Holding Twelve Ltd","roles":["developer"],"country":"India","jurisdiction":"IN","project_count":1,"tender_count":0,"pipeline_mw":400.0,"states":["Rajasthan"],"stages":["announced"],"source":"https://www.gem.wiki/Rajasthan_(Adani)_XV_solar_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-adani-renewable-energy-park-rajasthan-ltd","record_type":"organisation","jurisdiction":"IN","data":{"id":"org-adani-renewable-energy-park-rajasthan-ltd","name":"Adani Renewable Energy Park Rajasthan Ltd","roles":["developer"],"country":"India","jurisdiction":"IN","project_count":2,"tender_count":0,"pipeline_mw":2000.0,"states":["Rajasthan"],"stages":["announced"],"source":"https://www.gem.wiki/Rajasthan_(Adani)_X_solar_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-adani-renewable-energy-two-ltd","record_type":"organisation","jurisdiction":"IN","data":{"id":"org-adani-renewable-energy-two-ltd","name":"Adani Renewable Energy Two Ltd","roles":["developer"],"country":"India","jurisdiction":"IN","project_count":1,"tender_count":0,"pipeline_mw":600.0,"states":["Rajasthan"],"stages":["under_construction"],"source":"https://www.gem.wiki/Rajasthan_(Adani)_wind_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-adani-rugby-run-pty-ltd","record_type":"organisation","jurisdiction":"AU","data":{"id":"org-adani-rugby-run-pty-ltd","name":"Adani Rugby Run Pty Ltd","roles":["developer"],"country":"Australia","jurisdiction":"AU","project_count":1,"tender_count":0,"pipeline_mw":65.0,"states":["QLD"],"stages":["operational"],"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-adani-solar-energy-ap-three","record_type":"organisation","jurisdiction":"IN","data":{"id":"org-adani-solar-energy-ap-three","name":"Adani Solar Energy AP Three","roles":["developer"],"country":"India","jurisdiction":"IN","project_count":1,"tender_count":0,"pipeline_mw":150.0,"states":["Rajasthan"],"stages":["under_construction"],"source":"https://www.gem.wiki/Rajasthan_(Adani)_XIII_solar_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-adeje-solar-sl","record_type":"organisation","jurisdiction":"ES","data":{"id":"org-adeje-solar-sl","name":"Adeje Solar SL","roles":["developer"],"country":"Spain","jurisdiction":"ES","project_count":1,"tender_count":0,"pipeline_mw":50.0,"states":["Cataluña"],"stages":["committed"],"source":"https://www.gem.wiki/Adeje_solar_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-adelanta-corporacion-sa","record_type":"organisation","jurisdiction":"ES","data":{"id":"org-adelanta-corporacion-sa","name":"Adelanta Corporación SA","roles":["developer"],"country":"Spain","jurisdiction":"ES","project_count":1,"tender_count":0,"pipeline_mw":50.0,"states":["Galicia"],"stages":["committed"],"source":"https://www.gem.wiki/Coto_Loureiro_wind_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-adelanta-group","record_type":"organisation","jurisdiction":"ES","data":{"id":"org-adelanta-group","name":"Adelanta Group","roles":["developer"],"country":"Spain","jurisdiction":"ES","project_count":1,"tender_count":0,"pipeline_mw":40.0,"states":["Galicia"],"stages":["operational"],"source":"https://www.gem.wiki/Montouto_2000_wind_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-aditya-birla-management-corporation-pvt-ltd","record_type":"organisation","jurisdiction":"IN","data":{"id":"org-aditya-birla-management-corporation-pvt-ltd","name":"Aditya Birla Management Corporation Pvt Ltd","roles":["developer"],"country":"India","jurisdiction":"IN","project_count":1,"tender_count":0,"pipeline_mw":300.0,"states":["Gujarat"],"stages":["withdrawn"],"source":"https://www.gem.wiki/Gujarat_GUVNL_XIV_(Aditya_Birla)_solar_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-aditya-birla-renewables","record_type":"organisation","jurisdiction":"IN","data":{"id":"org-aditya-birla-renewables","name":"Aditya Birla Renewables","roles":["developer"],"country":"India","jurisdiction":"IN","project_count":4,"tender_count":0,"pipeline_mw":519.0,"states":["Gujarat","Karnataka","Rajasthan"],"stages":["committed","under_construction"],"source":"https://www.gem.wiki/Gujarat_GUVNL_XI_(Aditya_Birla)_solar_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-adtek-limited","record_type":"organisation","jurisdiction":"GB","data":{"id":"org-adtek-limited","name":"ADTEK LIMITED","roles":["developer"],"country":"United Kingdom","jurisdiction":"GB","project_count":1,"tender_count":0,"pipeline_mw":49.9,"states":[],"stages":["announced"],"source":"https://www.neso.energy/data-portal/transmission-entry-capacity-tec-register"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-adv-004-limited","record_type":"organisation","jurisdiction":"GB","data":{"id":"org-adv-004-limited","name":"ADV 004 LIMITED","roles":["developer"],"country":"United Kingdom","jurisdiction":"GB","project_count":1,"tender_count":0,"pipeline_mw":150.0,"states":[],"stages":["committed"],"source":"https://www.neso.energy/data-portal/transmission-entry-capacity-tec-register"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-advance-grid-solutions-limited","record_type":"organisation","jurisdiction":"GB","data":{"id":"org-advance-grid-solutions-limited","name":"Advance Grid Solutions Limited","roles":["developer"],"country":"United Kingdom","jurisdiction":"GB","project_count":6,"tender_count":0,"pipeline_mw":783.0,"states":[],"stages":["announced"],"source":"https://www.neso.energy/data-portal/transmission-entry-capacity-tec-register"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-adwea","record_type":"organisation","jurisdiction":"AE","data":{"id":"org-adwea","name":"ADWEA","roles":["developer"],"country":"United Arab Emirates","jurisdiction":"AE","project_count":2,"tender_count":0,"pipeline_mw":2279.0,"states":[],"stages":["operational"],"source":"http://www.auptde.org/NewsDetails.aspx?lang=en&NID=283"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-adwea-taqa-cms-generation-taweelah-limited","record_type":"organisation","jurisdiction":"AE","data":{"id":"org-adwea-taqa-cms-generation-taweelah-limited","name":"ADWEA  TAQA  & CMS Generation Taweelah Limited","roles":["developer"],"country":"United Arab Emirates","jurisdiction":"AE","project_count":1,"tender_count":0,"pipeline_mw":2200.0,"states":[],"stages":["operational"],"source":"http://www.auptde.org/NewsDetails.aspx?lang=en&NID=283"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-adyant-enersol-pvt-ltd","record_type":"organisation","jurisdiction":"IN","data":{"id":"org-adyant-enersol-pvt-ltd","name":"Adyant Enersol Pvt Ltd","roles":["developer"],"country":"India","jurisdiction":"IN","project_count":1,"tender_count":0,"pipeline_mw":50.0,"states":["Rajasthan"],"stages":["committed"],"source":"https://www.gem.wiki/Pratapgarh_(Adyant_Enersol)_wind_farm"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-ae-bess-10-as-trustee-for-ae-bess-10-unit-trust","record_type":"organisation","jurisdiction":"AU","data":{"id":"org-ae-bess-10-as-trustee-for-ae-bess-10-unit-trust","name":"AE BESS 10 as Trustee for AE BESS 10 Unit Trust","roles":["developer"],"country":"Australia","jurisdiction":"AU","project_count":1,"tender_count":0,"pipeline_mw":120.0,"pipeline_mwh":480.0,"states":["VIC"],"stages":["announced"],"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-ae-bess-12-pty-ltd-as-trustee-of-ae-bess-12-unit-trust","record_type":"organisation","jurisdiction":"AU","data":{"id":"org-ae-bess-12-pty-ltd-as-trustee-of-ae-bess-12-unit-trust","name":"AE BESS 12 Pty Ltd as trustee of AE BESS 12 Unit Trust","roles":["developer"],"country":"Australia","jurisdiction":"AU","project_count":1,"tender_count":0,"pipeline_mw":319.2,"states":["NSW"],"stages":["announced"],"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-ae-bess-2-pty-ltd-as-trustee-for-ae-bess-2-unit-trust","record_type":"organisation","jurisdiction":"AU","data":{"id":"org-ae-bess-2-pty-ltd-as-trustee-for-ae-bess-2-unit-trust","name":"AE BESS 2 PTY LTD AS TRUSTEE FOR AE BESS 2 UNIT TRUST","roles":["developer"],"country":"Australia","jurisdiction":"AU","project_count":1,"tender_count":0,"pipeline_mw":120.0,"pipeline_mwh":480.0,"states":["NSW"],"stages":["announced"],"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"org-ae-bess-3-pty-ltd-as-trustee-for-ae-bess-3-unit-trust","record_type":"organisation","jurisdiction":"AU","data":{"id":"org-ae-bess-3-pty-ltd-as-trustee-for-ae-bess-3-unit-trust","name":"AE BESS 3 Pty Ltd as Trustee for AE BESS 3 Unit Trust","roles":["developer"],"country":"Australia","jurisdiction":"AU","project_count":1,"tender_count":0,"pipeline_mw":100.0,"states":["VIC"],"stages":["announced"],"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information"},"source_url":"https://ai-root.com/developer","publisher":"derived from the tender + project layers; OEM list per SPRINT.md","fetched_at":"2026-10-12T01:20:05.593552+00:00","confidence":"medium"},{"entity_id":"battery-alpha-ess-smile-b3","record_type":"product","jurisdiction":"AU","data":{"id":"battery-alpha-ess-smile-b3","category":"battery","brand":"Alpha ESS","model":"SMILE-B3","usable_kwh":2.9,"chemistry":"LFP","vpp_capable":true,"approx_price_aud":"~$7,480 RRP","approval_note":"CEC approved; CHB eligible; scalable","jurisdiction":"AU"},"source_url":"https://www.cleanenergycouncil.org.au/industry/products","publisher":"Clean Energy Council","fetched_at":"2026-08-30T10:16:53.648136+00:00","confidence":"medium"},{"entity_id":"battery-alpha-ess-smile-g3","record_type":"product","jurisdiction":"AU","data":{"id":"battery-alpha-ess-smile-g3","category":"battery","brand":"Alpha ESS","model":"SMILE-G3","usable_kwh":9.6,"chemistry":"LFP","vpp_capable":true,"approx_price_aud":"~$10,000-14,000 installed","approval_note":"CEC approved; CHB eligible; 30+ VPP platforms","jurisdiction":"AU"},"source_url":"https://www.cleanenergycouncil.org.au/industry/products","publisher":"Clean Energy Council","fetched_at":"2026-08-30T10:16:53.648136+00:00","confidence":"medium"},{"entity_id":"battery-alpha-ess-smile-t10","record_type":"product","jurisdiction":"AU","data":{"id":"battery-alpha-ess-smile-t10","category":"battery","brand":"Alpha ESS","model":"SMILE-T10","usable_kwh":10.1,"chemistry":"LFP","vpp_capable":true,"approx_price_aud":"~$10,000-14,000 installed","approval_note":"CEC approved; CHB eligible; three-phase","jurisdiction":"AU"},"source_url":"https://www.cleanenergycouncil.org.au/industry/products","publisher":"Clean Energy Council","fetched_at":"2026-08-30T10:16:53.648136+00:00","confidence":"medium"},{"entity_id":"battery-byd-battery-box-premium-hvm-16-6","record_type":"product","jurisdiction":"AU","data":{"id":"battery-byd-battery-box-premium-hvm-16-6","category":"battery","brand":"BYD","model":"Battery-Box Premium HVM 16.6","usable_kwh":16.56,"chemistry":"LFP","vpp_capable":true,"approx_price_aud":"~$8,500 supply","approval_note":"CEC approved; CHB eligible; modular 8.3-22.1 kWh","jurisdiction":"AU"},"source_url":"https://www.cleanenergycouncil.org.au/industry/products","publisher":"Clean Energy Council","fetched_at":"2026-08-30T10:16:53.648136+00:00","confidence":"medium"},{"entity_id":"battery-byd-battery-box-premium-hvs-10-2","record_type":"product","jurisdiction":"AU","data":{"id":"battery-byd-battery-box-premium-hvs-10-2","category":"battery","brand":"BYD","model":"Battery-Box Premium HVS 10.2","usable_kwh":10.24,"chemistry":"LFP","vpp_capable":true,"approx_price_aud":"~$8,000-12,000 installed","approval_note":"CEC approved; CHB eligible; modular 5.1-12.8 kWh","jurisdiction":"AU"},"source_url":"https://www.cleanenergycouncil.org.au/industry/products","publisher":"Clean Energy Council","fetched_at":"2026-08-30T10:16:53.648136+00:00","confidence":"medium"},{"entity_id":"battery-byd-battery-box-premium-lvl-15-4","record_type":"product","jurisdiction":"AU","data":{"id":"battery-byd-battery-box-premium-lvl-15-4","category":"battery","brand":"BYD","model":"Battery-Box Premium LVL 15.4","usable_kwh":15.36,"chemistry":"LFP","vpp_capable":true,"approx_price_aud":"from ~$5,700 supply","approval_note":"CEC approved; larger residential/light-commercial","jurisdiction":"AU"},"source_url":"https://www.cleanenergycouncil.org.au/industry/products","publisher":"Clean Energy Council","fetched_at":"2026-08-30T10:16:53.648136+00:00","confidence":"medium"},{"entity_id":"battery-byd-battery-box-premium-lvs","record_type":"product","jurisdiction":"AU","data":{"id":"battery-byd-battery-box-premium-lvs","category":"battery","brand":"BYD","model":"Battery-Box Premium LVS","usable_kwh":12.0,"chemistry":"LFP","vpp_capable":true,"approx_price_aud":"LVS 4.0 ~$2,900; 24.0 ~$15,600","approval_note":"CEC approved; CHB eligible; modular 4-24 kWh","jurisdiction":"AU"},"source_url":"https://www.cleanenergycouncil.org.au/industry/products","publisher":"Clean Energy Council","fetched_at":"2026-08-30T10:16:53.648136+00:00","confidence":"medium"},{"entity_id":"battery-deye-ess-lv-se-g5-1","record_type":"product","jurisdiction":"AU","data":{"id":"battery-deye-ess-lv-se-g5-1","category":"battery","brand":"Deye","model":"ESS LV (SE-G5.1)","usable_kwh":10.2,"chemistry":"LFP","vpp_capable":true,"approval_note":"listed - verify; modular","jurisdiction":"AU"},"source_url":"https://www.cleanenergycouncil.org.au/industry/products","publisher":"Clean Energy Council","fetched_at":"2026-08-30T10:16:53.648136+00:00","confidence":"medium"},{"entity_id":"battery-enphase-iq-battery-10t","record_type":"product","jurisdiction":"AU","data":{"id":"battery-enphase-iq-battery-10t","category":"battery","brand":"Enphase","model":"IQ Battery 10T","usable_kwh":10.08,"chemistry":"LFP","vpp_capable":true,"approx_price_aud":"~$1,400-1,500/kWh installed","approval_note":"CEC approved; CHB eligible","jurisdiction":"AU"},"source_url":"https://www.cleanenergycouncil.org.au/industry/products","publisher":"Clean Energy Council","fetched_at":"2026-08-30T10:16:53.648136+00:00","confidence":"medium"},{"entity_id":"battery-enphase-iq-battery-5p","record_type":"product","jurisdiction":"AU","data":{"id":"battery-enphase-iq-battery-5p","category":"battery","brand":"Enphase","model":"IQ Battery 5P","usable_kwh":5.0,"chemistry":"LFP","vpp_capable":true,"approx_price_aud":"~$5,000-8,000/unit supply","approval_note":"CEC approved; CHB eligible; stackable","jurisdiction":"AU"},"source_url":"https://www.cleanenergycouncil.org.au/industry/products","publisher":"Clean Energy Council","fetched_at":"2026-08-30T10:16:53.648136+00:00","confidence":"medium"},{"entity_id":"battery-foxess-cq6","record_type":"product","jurisdiction":"AU","data":{"id":"battery-foxess-cq6","category":"battery","brand":"FoxESS","model":"CQ6","usable_kwh":12.0,"chemistry":"LFP","vpp_capable":true,"approx_price_aud":"budget tier","approval_note":"CEC approved; 12-year warranty; stackable","jurisdiction":"AU"},"source_url":"https://www.cleanenergycouncil.org.au/industry/products","publisher":"Clean Energy Council","fetched_at":"2026-08-30T10:16:53.648136+00:00","confidence":"medium"},{"entity_id":"battery-foxess-ecs-eq-ep","record_type":"product","jurisdiction":"AU","data":{"id":"battery-foxess-ecs-eq-ep","category":"battery","brand":"FoxESS","model":"ECS (EQ/EP)","usable_kwh":9.3,"chemistry":"LFP","vpp_capable":true,"approx_price_aud":"budget tier","approval_note":"CEC approved; CHB eligible; stackable","jurisdiction":"AU"},"source_url":"https://www.cleanenergycouncil.org.au/industry/products","publisher":"Clean Energy Council","fetched_at":"2026-08-30T10:16:53.648136+00:00","confidence":"medium"},{"entity_id":"battery-fronius-reserva","record_type":"product","jurisdiction":"AU","data":{"id":"battery-fronius-reserva","category":"battery","brand":"Fronius","model":"Reserva","usable_kwh":12.6,"chemistry":"LFP","vpp_capable":true,"approx_price_aud":"~$5,800-11,800 hardware","approval_note":"CEC approved (AU Oct 2025); CHB eligible; to 63 kWh","jurisdiction":"AU"},"source_url":"https://www.cleanenergycouncil.org.au/industry/products","publisher":"Clean Energy Council","fetched_at":"2026-08-30T10:16:53.648136+00:00","confidence":"medium"},{"entity_id":"battery-goodwe-lynx-home-f-series","record_type":"product","jurisdiction":"AU","data":{"id":"battery-goodwe-lynx-home-f-series","category":"battery","brand":"GoodWe","model":"Lynx Home F series","usable_kwh":13.1,"chemistry":"LFP","vpp_capable":true,"approx_price_aud":"12.8 kWh ~$7,900 after rebate","approval_note":"CEC approved; CHB eligible; modular 6.6-16.4 kWh","jurisdiction":"AU"},"source_url":"https://www.cleanenergycouncil.org.au/industry/products","publisher":"Clean Energy Council","fetched_at":"2026-08-30T10:16:53.648136+00:00","confidence":"medium"},{"entity_id":"battery-growatt-apx-hv-series","record_type":"product","jurisdiction":"AU","data":{"id":"battery-growatt-apx-hv-series","category":"battery","brand":"Growatt","model":"APX HV series","usable_kwh":9.6,"chemistry":"LFP","vpp_capable":true,"approx_price_aud":"~$4,500 supply (10.24 kWh)","approval_note":"CEC approved; CHB eligible; modular","jurisdiction":"AU"},"source_url":"https://www.cleanenergycouncil.org.au/industry/products","publisher":"Clean Energy Council","fetched_at":"2026-08-30T10:16:53.648136+00:00","confidence":"medium"},{"entity_id":"battery-growatt-ark-xh-hv","record_type":"product","jurisdiction":"AU","data":{"id":"battery-growatt-ark-xh-hv","category":"battery","brand":"Growatt","model":"ARK XH (HV)","usable_kwh":10.24,"chemistry":"LFP","vpp_capable":true,"approx_price_aud":"~$2,499-10,589 supply","approval_note":"CEC approved; CHB eligible; modular 5.1-25.6 kWh","jurisdiction":"AU"},"source_url":"https://www.cleanenergycouncil.org.au/industry/products","publisher":"Clean Energy Council","fetched_at":"2026-08-30T10:16:53.648136+00:00","confidence":"medium"},{"entity_id":"battery-huawei-luna2000-s0-s1","record_type":"product","jurisdiction":"AU","data":{"id":"battery-huawei-luna2000-s0-s1","category":"battery","brand":"Huawei","model":"LUNA2000 (S0/S1)","usable_kwh":10.0,"chemistry":"LFP","vpp_capable":true,"approx_price_aud":"~$5,500-16,000 installed","approval_note":"CEC approved; CHB eligible; modular to 30 kWh","jurisdiction":"AU"},"source_url":"https://www.cleanenergycouncil.org.au/industry/products","publisher":"Clean Energy Council","fetched_at":"2026-08-30T10:16:53.648136+00:00","confidence":"medium"},{"entity_id":"battery-lg-energy-solution-resu-flex","record_type":"product","jurisdiction":"AU","data":{"id":"battery-lg-energy-solution-resu-flex","category":"battery","brand":"LG Energy Solution","model":"RESU FLEX","usable_kwh":8.6,"chemistry":"NMC","vpp_capable":true,"approval_note":"listed - verify; modular to 17.2 kWh","jurisdiction":"AU"},"source_url":"https://www.cleanenergycouncil.org.au/industry/products","publisher":"Clean Energy Council","fetched_at":"2026-08-30T10:16:53.648136+00:00","confidence":"medium"},{"entity_id":"battery-lg-energy-solution-resu10h-prime","record_type":"product","jurisdiction":"AU","data":{"id":"battery-lg-energy-solution-resu10h-prime","category":"battery","brand":"LG Energy Solution","model":"RESU10H Prime","usable_kwh":9.6,"chemistry":"NMC","vpp_capable":true,"approx_price_aud":"~$9,000-11,000 installed","approval_note":"CEC approved; CHB eligible","jurisdiction":"AU"},"source_url":"https://www.cleanenergycouncil.org.au/industry/products","publisher":"Clean Energy Council","fetched_at":"2026-08-30T10:16:53.648136+00:00","confidence":"medium"},{"entity_id":"battery-lg-energy-solution-resu16h-prime","record_type":"product","jurisdiction":"AU","data":{"id":"battery-lg-energy-solution-resu16h-prime","category":"battery","brand":"LG Energy Solution","model":"RESU16H Prime","usable_kwh":16.0,"chemistry":"NMC","vpp_capable":true,"approx_price_aud":"~$12,000-14,000 installed","approval_note":"CEC approved; CHB eligible","jurisdiction":"AU"},"source_url":"https://www.cleanenergycouncil.org.au/industry/products","publisher":"Clean Energy Council","fetched_at":"2026-08-30T10:16:53.648136+00:00","confidence":"medium"},{"entity_id":"battery-powerplus-energy-eco-4840p","record_type":"product","jurisdiction":"AU","data":{"id":"battery-powerplus-energy-eco-4840p","category":"battery","brand":"PowerPlus Energy","model":"ECO 4840P","usable_kwh":3.76,"chemistry":"LFP","vpp_capable":false,"approx_price_aud":"~$1,000-1,400/usable kWh","approval_note":"CEC approved; Australian-made; hybrid/off-grid","jurisdiction":"AU"},"source_url":"https://www.cleanenergycouncil.org.au/industry/products","publisher":"Clean Energy Council","fetched_at":"2026-08-30T10:16:53.648136+00:00","confidence":"medium"},{"entity_id":"battery-pylontech-force-h2-hv","record_type":"product","jurisdiction":"AU","data":{"id":"battery-pylontech-force-h2-hv","category":"battery","brand":"Pylontech","model":"Force-H2 (HV)","usable_kwh":3.4,"chemistry":"LFP","vpp_capable":true,"approval_note":"CEC approved; CHB eligible; to 28.4 kWh","jurisdiction":"AU"},"source_url":"https://www.cleanenergycouncil.org.au/industry/products","publisher":"Clean Energy Council","fetched_at":"2026-08-30T10:16:53.648136+00:00","confidence":"medium"},{"entity_id":"battery-pylontech-us5000","record_type":"product","jurisdiction":"AU","data":{"id":"battery-pylontech-us5000","category":"battery","brand":"Pylontech","model":"US5000","usable_kwh":4.8,"chemistry":"LFP","vpp_capable":true,"approx_price_aud":"~$1,300-1,600 supply/module","approval_note":"CEC approved; CHB eligible; parallel-stackable","jurisdiction":"AU"},"source_url":"https://www.cleanenergycouncil.org.au/industry/products","publisher":"Clean Energy Council","fetched_at":"2026-08-30T10:16:53.648136+00:00","confidence":"medium"},{"entity_id":"battery-qcells-q-home-core","record_type":"product","jurisdiction":"AU","data":{"id":"battery-qcells-q-home-core","category":"battery","brand":"Qcells","model":"Q.HOME CORE","usable_kwh":13.6,"chemistry":"LFP","vpp_capable":true,"approx_price_aud":"~$10,500-18,300 system","approval_note":"listed - verify; modular 6.8-20.4 kWh","jurisdiction":"AU"},"source_url":"https://www.cleanenergycouncil.org.au/industry/products","publisher":"Clean Energy Council","fetched_at":"2026-08-30T10:16:53.648136+00:00","confidence":"medium"},{"entity_id":"battery-redback-smart-battery-system-modular","record_type":"product","jurisdiction":"AU","data":{"id":"battery-redback-smart-battery-system-modular","category":"battery","brand":"Redback","model":"Smart Battery System (modular)","usable_kwh":14.0,"chemistry":"LFP","vpp_capable":true,"approval_note":"CEC approved; CHB eligible; modular 9.6-25 kWh","jurisdiction":"AU"},"source_url":"https://www.cleanenergycouncil.org.au/industry/products","publisher":"Clean Energy Council","fetched_at":"2026-08-30T10:16:53.648136+00:00","confidence":"medium"},{"entity_id":"battery-redback-smart-hybrid-battery","record_type":"product","jurisdiction":"AU","data":{"id":"battery-redback-smart-hybrid-battery","category":"battery","brand":"Redback","model":"Smart Hybrid Battery","usable_kwh":5.5,"chemistry":"LFP","vpp_capable":true,"approx_price_aud":"~$8,000-12,000 installed w/ inverter","approval_note":"CEC approved; CHB eligible","jurisdiction":"AU"},"source_url":"https://www.cleanenergycouncil.org.au/industry/products","publisher":"Clean Energy Council","fetched_at":"2026-08-30T10:16:53.648136+00:00","confidence":"medium"},{"entity_id":"battery-sigenergy-sigenstor","record_type":"product","jurisdiction":"AU","data":{"id":"battery-sigenergy-sigenstor","category":"battery","brand":"Sigenergy","model":"SigenStor","usable_kwh":17.5,"chemistry":"LFP","vpp_capable":true,"approx_price_aud":"~$11,990+ installed (17.5 kWh)","approval_note":"CEC approved; CHB eligible; V2H bidirectional; to 48 kWh","jurisdiction":"AU"},"source_url":"https://www.cleanenergycouncil.org.au/industry/products","publisher":"Clean Energy Council","fetched_at":"2026-08-30T10:16:53.648136+00:00","confidence":"medium"},{"entity_id":"battery-solaredge-home-battery-48v","record_type":"product","jurisdiction":"AU","data":{"id":"battery-solaredge-home-battery-48v","category":"battery","brand":"SolarEdge","model":"Home Battery 48V","usable_kwh":9.7,"chemistry":"NMC","vpp_capable":true,"approx_price_aud":"~$4,500 supply (battery only)","approval_note":"CEC approved; CHB eligible; scalable x3","jurisdiction":"AU"},"source_url":"https://www.cleanenergycouncil.org.au/industry/products","publisher":"Clean Energy Council","fetched_at":"2026-08-30T10:16:53.648136+00:00","confidence":"medium"},{"entity_id":"battery-solax-triple-power-t58","record_type":"product","jurisdiction":"AU","data":{"id":"battery-solax-triple-power-t58","category":"battery","brand":"SolaX","model":"Triple Power T58","usable_kwh":5.8,"chemistry":"LFP","vpp_capable":true,"approx_price_aud":"~$4,000-5,000 supply/module","approval_note":"CEC approved; CHB eligible; to 34.6 kWh cluster","jurisdiction":"AU"},"source_url":"https://www.cleanenergycouncil.org.au/industry/products","publisher":"Clean Energy Council","fetched_at":"2026-08-30T10:16:53.648136+00:00","confidence":"medium"},{"entity_id":"battery-solax-triple-power-t63","record_type":"product","jurisdiction":"AU","data":{"id":"battery-solax-triple-power-t63","category":"battery","brand":"SolaX","model":"Triple Power T63","usable_kwh":6.3,"chemistry":"LFP","vpp_capable":true,"approval_note":"CEC approved; CHB eligible; modular","jurisdiction":"AU"},"source_url":"https://www.cleanenergycouncil.org.au/industry/products","publisher":"Clean Energy Council","fetched_at":"2026-08-30T10:16:53.648136+00:00","confidence":"medium"},{"entity_id":"battery-sonnen-sonnenbatterie-evo-10","record_type":"product","jurisdiction":"AU","data":{"id":"battery-sonnen-sonnenbatterie-evo-10","category":"battery","brand":"sonnen","model":"sonnenBatterie Evo 10","usable_kwh":10.0,"chemistry":"LFP","vpp_capable":true,"approx_price_aud":"~$12,300 RRP","approval_note":"CEC approved; CHB eligible","jurisdiction":"AU"},"source_url":"https://www.cleanenergycouncil.org.au/industry/products","publisher":"Clean Energy Council","fetched_at":"2026-08-30T10:16:53.648136+00:00","confidence":"medium"},{"entity_id":"battery-sungrow-sbh-series","record_type":"product","jurisdiction":"AU","data":{"id":"battery-sungrow-sbh-series","category":"battery","brand":"Sungrow","model":"SBH series","usable_kwh":25.0,"chemistry":"LFP","vpp_capable":true,"approx_price_aud":"~$15,000-22,500 installed","approval_note":"CEC approved; CHB eligible; modular 20-40 kWh","jurisdiction":"AU"},"source_url":"https://www.cleanenergycouncil.org.au/industry/products","publisher":"Clean Energy Council","fetched_at":"2026-08-30T10:16:53.648136+00:00","confidence":"medium"},{"entity_id":"battery-sungrow-sbr-series","record_type":"product","jurisdiction":"AU","data":{"id":"battery-sungrow-sbr-series","category":"battery","brand":"Sungrow","model":"SBR series","usable_kwh":12.8,"chemistry":"LFP","vpp_capable":true,"approx_price_aud":"SBR128 ~$8,999 installed","approval_note":"CEC approved; CHB eligible; modular 9.6-25.6 kWh","jurisdiction":"AU"},"source_url":"https://www.cleanenergycouncil.org.au/industry/products","publisher":"Clean Energy Council","fetched_at":"2026-08-30T10:16:53.648136+00:00","confidence":"medium"},{"entity_id":"battery-tesla-powerwall-3","record_type":"product","jurisdiction":"AU","data":{"id":"battery-tesla-powerwall-3","category":"battery","brand":"Tesla","model":"Powerwall 3","usable_kwh":13.5,"chemistry":"LFP","vpp_capable":true,"approx_price_aud":"$13,500-15,500 installed","approval_note":"CEC approved; Cheaper Home Batteries eligible","jurisdiction":"AU"},"source_url":"https://www.cleanenergycouncil.org.au/industry/products","publisher":"Clean Energy Council","fetched_at":"2026-08-30T10:16:53.648136+00:00","confidence":"medium"},{"entity_id":"battery-zenaji-aeon-a48-40","record_type":"product","jurisdiction":"AU","data":{"id":"battery-zenaji-aeon-a48-40","category":"battery","brand":"Zenaji","model":"Aeon A48-40","usable_kwh":2.0,"chemistry":"LTO","vpp_capable":false,"approval_note":"CEC approved; LTO chemistry; off-grid/commercial focus","jurisdiction":"AU"},"source_url":"https://www.cleanenergycouncil.org.au/industry/products","publisher":"Clean Energy Council","fetched_at":"2026-08-30T10:16:53.648136+00:00","confidence":"medium"},{"entity_id":"670mw-hydrogen-ready-ccgt-with-integrated-battery-storage","record_type":"project","jurisdiction":"SG","data":{"id":"670mw-hydrogen-ready-ccgt-with-integrated-battery-storage","name":"670MW hydrogen-ready CCGT with integrated battery storage","asset_class":"gas","technology":"hydrogen-ready CCGT with integrated battery storage","mw":670.0,"country":"Singapore","stage":"awarded","source":"https://www.energy-storage.news/singapore-670mw-hydrogen-ready-ccgt-with-integrated-battery-storage-inertia-trial-at-southeast-asias-biggest-bess/","note":"670MW figure is the CCGT turbine rating; the integrated battery is not separately sized in the source. Same item reports an inertia trial at Southeast Asia's biggest BESS.","jurisdiction":"SG"},"source_url":"https://www.energy-storage.news/tag/singapore/feed/","publisher":"Energy-Storage.news (Solar Media) — Singapore tag","fetched_at":"2026-09-19T20:24:55.172636+00:00","confidence":"medium"},{"entity_id":"acme-solar-bess","record_type":"project","jurisdiction":"IN","data":{"id":"acme-solar-bess","name":"ACME Solar BESS","asset_class":"battery","developer":"ACME Solar","mwh":480.0,"country":"India","stage":"operational","source":"https://www.energy-storage.news/india-acme-solar-commissions-480mwh-of-bess-readies-for-fdre-and-peak-supply-deals/","note":"Commissioned ahead of FDRE and peak supply deals","jurisdiction":"IN"},"source_url":"https://www.energy-storage.news/tag/india/feed/","publisher":"Energy-Storage.news (Solar Media) — India tag","fetched_at":"2026-09-02T15:01:23.338590+00:00","confidence":"medium"},{"entity_id":"adani-green-khavda-bess","record_type":"project","jurisdiction":"IN","data":{"id":"adani-green-khavda-bess","name":"Adani Green Khavda BESS","asset_class":"battery","developer":"Adani Green Energy","mwh":3370.0,"state":"Gujarat","country":"India","stage":"operational","source":"https://www.energy-storage.news/adani-green-energy-reaches-3-37gwh-of-cumulative-bess-capacity-at-indias-khavda-giga-scale-renewable-energy-park/","note":"Cumulative BESS capacity reached at the Khavda giga-scale renewable energy park","jurisdiction":"IN"},"source_url":"https://www.energy-storage.news/tag/india/feed/","publisher":"Energy-Storage.news (Solar Media) — India tag","fetched_at":"2026-09-02T15:01:23.338590+00:00","confidence":"medium"},{"entity_id":"ae-gem-solar-g100000804630","record_type":"project","jurisdiction":"AE","data":{"id":"ae-gem-solar-g100000804630","name":"Mohammed Bin Rashid Al Maktoum Solar Park — 4b","asset_class":"solar","technology":"Solar PV","developer":"Dubai Electricity and Water Authority PJSC","mw":100.0,"state":"Emirate of Dubai","country":"United Arab Emirates","stage":"operational","cod":"2023","source":"https://www.gem.wiki/Mohammed_Bin_Rashid_Al_Maktoum_Solar_Park","note":"Solar — Global Energy Monitor tracker (current, Feb 2026). Ownership: Dubai Electricity and Water Authority PJSC [100%]. Global Solar Power Tracker, Global Energy Monitor, February 2026, CC BY 4.0.","jurisdiction":"AE"},"source_url":"https://globalenergymonitor.org/projects/global-solar-power-tracker/","publisher":"Global Energy Monitor","fetched_at":"2026-09-12T14:23:52.807356+00:00","confidence":"medium"},{"entity_id":"ae-gem-solar-g100000804631","record_type":"project","jurisdiction":"AE","data":{"id":"ae-gem-solar-g100000804631","name":"Mohammed Bin Rashid Al Maktoum Solar Park — 4c","asset_class":"solar","technology":"Solar PV","developer":"Dubai Electricity and Water Authority PJSC","mw":250.0,"state":"Emirate of Dubai","country":"United Arab Emirates","stage":"operational","cod":"2023","source":"https://www.gem.wiki/Mohammed_Bin_Rashid_Al_Maktoum_Solar_Park","note":"Solar — Global Energy Monitor tracker (current, Feb 2026). Ownership: Dubai Electricity and Water Authority PJSC [100%]. Global Solar Power Tracker, Global Energy Monitor, February 2026, CC BY 4.0.","jurisdiction":"AE"},"source_url":"https://globalenergymonitor.org/projects/global-solar-power-tracker/","publisher":"Global Energy Monitor","fetched_at":"2026-09-12T14:23:52.807356+00:00","confidence":"medium"},{"entity_id":"ae-gem-solar-g100000804635","record_type":"project","jurisdiction":"AE","data":{"id":"ae-gem-solar-g100000804635","name":"Al Saja Landfill solar farm — 1","asset_class":"solar","technology":"Solar PV","developer":"Bee'ah","mw":60.0,"state":"Sharjah","country":"United Arab Emirates","stage":"under_construction","source":"https://www.gem.wiki/Al_Saja_Landfill_solar_farm","note":"Solar — Global Energy Monitor tracker (current, Feb 2026). Ownership: Bee'ah; Sharjah Electricity & Water Authority; Masdar Clean Energy. Global Solar Power Tracker, Global Energy Monitor, February 2026, CC BY 4.0.","jurisdiction":"AE"},"source_url":"https://globalenergymonitor.org/projects/global-solar-power-tracker/","publisher":"Global Energy Monitor","fetched_at":"2026-09-12T14:23:52.807356+00:00","confidence":"medium"},{"entity_id":"ae-gem-solar-g100000804636","record_type":"project","jurisdiction":"AE","data":{"id":"ae-gem-solar-g100000804636","name":"Al Saja Landfill solar farm — 2","asset_class":"solar","technology":"Solar PV","developer":"Bee'ah","mw":30.0,"state":"Sharjah","country":"United Arab Emirates","stage":"announced","source":"https://www.gem.wiki/Al_Saja_Landfill_solar_farm","note":"Solar — Global Energy Monitor tracker (current, Feb 2026). Ownership: Bee'ah; Sharjah Electricity & Water Authority; Masdar Clean Energy. Global Solar Power Tracker, Global Energy Monitor, February 2026, CC BY 4.0.","jurisdiction":"AE"},"source_url":"https://globalenergymonitor.org/projects/global-solar-power-tracker/","publisher":"Global Energy Monitor","fetched_at":"2026-09-12T14:23:52.807356+00:00","confidence":"medium"},{"entity_id":"ae-gem-solar-g100000804637","record_type":"project","jurisdiction":"AE","data":{"id":"ae-gem-solar-g100000804637","name":"Al Saja Landfill solar farm — 3","asset_class":"solar","technology":"Solar PV","developer":"Bee'ah","mw":30.0,"state":"Sharjah","country":"United Arab Emirates","stage":"announced","source":"https://www.gem.wiki/Al_Saja_Landfill_solar_farm","note":"Solar — Global Energy Monitor tracker (current, Feb 2026). Ownership: Bee'ah; Sharjah Electricity & Water Authority; Masdar Clean Energy. Global Solar Power Tracker, Global Energy Monitor, February 2026, CC BY 4.0.","jurisdiction":"AE"},"source_url":"https://globalenergymonitor.org/projects/global-solar-power-tracker/","publisher":"Global Energy Monitor","fetched_at":"2026-09-12T14:23:52.807356+00:00","confidence":"medium"},{"entity_id":"ae-gem-solar-g100000811471","record_type":"project","jurisdiction":"AE","data":{"id":"ae-gem-solar-g100000811471","name":"Al Ajban PV solar farm","asset_class":"solar","technology":"Solar PV","developer":"Masdar Clean Energy","mw":1500.0,"state":"Abu Dhabi","country":"United Arab Emirates","stage":"under_construction","cod":"2026","source":"https://www.gem.wiki/Al_Ajban_PV_solar_farm","note":"Solar — Global Energy Monitor tracker (current, Feb 2026). Ownership: Korea Western Power Co Ltd [20%]; EDF Renewables [20%]; Masdar Clean Energy [60%]. Global Solar Power Tracker, Global Energy Monitor, February 2026, CC BY 4.0.","jurisdiction":"AE"},"source_url":"https://globalenergymonitor.org/projects/global-solar-power-tracker/","publisher":"Global Energy Monitor","fetched_at":"2026-09-12T14:23:52.807356+00:00","confidence":"medium"},{"entity_id":"ae-gem-solar-g100000811472","record_type":"project","jurisdiction":"AE","data":{"id":"ae-gem-solar-g100000811472","name":"Al Taweelah solar farm","asset_class":"solar","technology":"Solar PV","developer":"ACWA Power Co","mw":70.0,"state":"Abu Dhabi","country":"United Arab Emirates","stage":"operational","cod":"2024","source":"https://www.gem.wiki/Al_Taweelah_solar_farm","note":"Solar — Global Energy Monitor tracker (current, Feb 2026). Ownership: Abu Dhabi National Energy Company PJSC [30%]; Mubadala Capital LLC [30%]; ACWA Power Co [40%]. Global Solar Power Tracker, Global Energy Monitor, February 2026, CC BY 4.0.","jurisdiction":"AE"},"source_url":"https://globalenergymonitor.org/projects/global-solar-power-tracker/","publisher":"Global Energy Monitor","fetched_at":"2026-09-12T14:23:52.807356+00:00","confidence":"medium"},{"entity_id":"ae-gem-solar-g100000835485","record_type":"project","jurisdiction":"AE","data":{"id":"ae-gem-solar-g100000835485","name":"Al Fattan Green Hydrogen solar farm","asset_class":"solar","technology":"Solar PV","developer":"","mw":200.0,"state":"Abu Dhabi","country":"United Arab Emirates","stage":"announced","source":"https://www.gem.wiki/Al_Fattan_Green_Hydrogen_solar_farm","note":"Solar — Global Energy Monitor tracker (current, Feb 2026). Global Solar Power Tracker, Global Energy Monitor, February 2026, CC BY 4.0.","jurisdiction":"AE"},"source_url":"https://globalenergymonitor.org/projects/global-solar-power-tracker/","publisher":"Global Energy Monitor","fetched_at":"2026-09-12T14:23:52.807356+00:00","confidence":"medium"},{"entity_id":"ae-gem-solar-g100000835486","record_type":"project","jurisdiction":"AE","data":{"id":"ae-gem-solar-g100000835486","name":"Brooge Green Ammonia solar farm","asset_class":"solar","technology":"Solar PV","developer":"Brooge Renewable Energy (BRE)","mw":650.0,"state":"Abu Dhabi","country":"United Arab Emirates","stage":"committed","source":"https://www.gem.wiki/Brooge_Green_Ammonia_solar_farm","note":"Solar — Global Energy Monitor tracker (current, Feb 2026). Ownership: Brooge Renewable Energy (BRE) [100%]. Global Solar Power Tracker, Global Energy Monitor, February 2026, CC BY 4.0.","jurisdiction":"AE"},"source_url":"https://globalenergymonitor.org/projects/global-solar-power-tracker/","publisher":"Global Energy Monitor","fetched_at":"2026-09-12T14:23:52.807356+00:00","confidence":"medium"},{"entity_id":"ae-gem-solar-g100000835487","record_type":"project","jurisdiction":"AE","data":{"id":"ae-gem-solar-g100000835487","name":"Helios Green Ammonia solar farm — 1","asset_class":"solar","technology":"Solar PV","developer":"Khalifa Industrial Zone Abu Dhabi (KIZAD)","mw":100.0,"state":"Abu Dhabi","country":"United Arab Emirates","stage":"withdrawn","source":"https://www.gem.wiki/Helios_Green_Ammonia_solar_farm","note":"Solar — Global Energy Monitor tracker (current, Feb 2026). Ownership: Khalifa Industrial Zone Abu Dhabi (KIZAD) [100%]. Global Solar Power Tracker, Global Energy Monitor, February 2026, CC BY 4.0.","jurisdiction":"AE"},"source_url":"https://globalenergymonitor.org/projects/global-solar-power-tracker/","publisher":"Global Energy Monitor","fetched_at":"2026-09-12T14:23:52.807356+00:00","confidence":"medium"},{"entity_id":"ae-gem-solar-g100000835488","record_type":"project","jurisdiction":"AE","data":{"id":"ae-gem-solar-g100000835488","name":"Helios Green Ammonia solar farm — 2","asset_class":"solar","technology":"Solar PV","developer":"Khalifa Industrial Zone Abu Dhabi (KIZAD)","mw":700.0,"state":"Abu Dhabi Emirate","country":"United Arab Emirates","stage":"withdrawn","source":"https://www.gem.wiki/Helios_Green_Ammonia_solar_farm","note":"Solar — Global Energy Monitor tracker (current, Feb 2026). Ownership: Khalifa Industrial Zone Abu Dhabi (KIZAD) [100%]. Global Solar Power Tracker, Global Energy Monitor, February 2026, CC BY 4.0.","jurisdiction":"AE"},"source_url":"https://globalenergymonitor.org/projects/global-solar-power-tracker/","publisher":"Global Energy Monitor","fetched_at":"2026-09-12T14:23:52.807356+00:00","confidence":"medium"},{"entity_id":"ae-gem-solar-g100000835489","record_type":"project","jurisdiction":"AE","data":{"id":"ae-gem-solar-g100000835489","name":"Hydrogen Hub solar farm","asset_class":"solar","technology":"Solar PV","developer":"","mw":1000.0,"state":"Abu Dhabi Emirate","country":"United Arab Emirates","stage":"withdrawn","source":"https://www.gem.wiki/Hydrogen_Hub_solar_farm","note":"Solar — Global Energy Monitor tracker (current, Feb 2026). Global Solar Power Tracker, Global Energy Monitor, February 2026, CC BY 4.0.","jurisdiction":"AE"},"source_url":"https://globalenergymonitor.org/projects/global-solar-power-tracker/","publisher":"Global Energy Monitor","fetched_at":"2026-09-12T14:23:52.807356+00:00","confidence":"medium"},{"entity_id":"ae-gem-solar-g100000835490","record_type":"project","jurisdiction":"AE","data":{"id":"ae-gem-solar-g100000835490","name":"Masdar-Engie Green Hydrogen solar farm — 1","asset_class":"solar","technology":"Solar PV","developer":"","mw":200.0,"state":"Abu Dhabi Emirate","country":"United Arab Emirates","stage":"withdrawn","source":"https://www.gem.wiki/Masdar-Engie_Green_Hydrogen_solar_farm","note":"Solar — Global Energy Monitor tracker (current, Feb 2026). Global Solar Power Tracker, Global Energy Monitor, February 2026, CC BY 4.0.","jurisdiction":"AE"},"source_url":"https://globalenergymonitor.org/projects/global-solar-power-tracker/","publisher":"Global Energy Monitor","fetched_at":"2026-09-12T14:23:52.807356+00:00","confidence":"medium"},{"entity_id":"ae-gem-solar-g100000835491","record_type":"project","jurisdiction":"AE","data":{"id":"ae-gem-solar-g100000835491","name":"Masdar-Engie Green Hydrogen solar farm — 2","asset_class":"solar","technology":"Solar PV","developer":"","mw":1800.0,"state":"Abu Dhabi Emirate","country":"United Arab Emirates","stage":"announced","cod":"2030","source":"https://www.gem.wiki/Masdar-Engie_Green_Hydrogen_solar_farm","note":"Solar — Global Energy Monitor tracker (current, Feb 2026). Global Solar Power Tracker, Global Energy Monitor, February 2026, CC BY 4.0.","jurisdiction":"AE"},"source_url":"https://globalenergymonitor.org/projects/global-solar-power-tracker/","publisher":"Global Energy Monitor","fetched_at":"2026-09-12T14:23:52.807356+00:00","confidence":"medium"},{"entity_id":"ae-gem-solar-g100000835492","record_type":"project","jurisdiction":"AE","data":{"id":"ae-gem-solar-g100000835492","name":"Mohammed Bin Rashid Al Maktoum Solar Park — 4d","asset_class":"solar","technology":"Solar PV","developer":"Dubai Electricity and Water Authority PJSC","mw":183.0,"state":"Emirate of Dubai","country":"United Arab Emirates","stage":"operational","cod":"2023","source":"https://www.gem.wiki/Mohammed_Bin_Rashid_Al_Maktoum_Solar_Park","note":"Solar — Global Energy Monitor tracker (current, Feb 2026). Ownership: Dubai Electricity and Water Authority PJSC [100%]. Global Solar Power Tracker, Global Energy Monitor, February 2026, CC BY 4.0.","jurisdiction":"AE"},"source_url":"https://globalenergymonitor.org/projects/global-solar-power-tracker/","publisher":"Global Energy Monitor","fetched_at":"2026-09-12T14:23:52.807356+00:00","confidence":"medium"},{"entity_id":"ae-gem-solar-g100000835494","record_type":"project","jurisdiction":"AE","data":{"id":"ae-gem-solar-g100000835494","name":"Mohammed Bin Rashid Al Maktoum Solar Park — 6a","asset_class":"solar","technology":"Solar PV","developer":"Dubai Electricity and Water Authority PJSC","mw":600.0,"state":"Emirate of Dubai","country":"United Arab Emirates","stage":"operational","cod":"2025","source":"https://www.gem.wiki/Mohammed_Bin_Rashid_Al_Maktoum_Solar_Park","note":"Solar — Global Energy Monitor tracker (current, Feb 2026). Ownership: Dubai Electricity and Water Authority PJSC [100%]. Global Solar Power Tracker, Global Energy Monitor, February 2026, CC BY 4.0.","jurisdiction":"AE"},"source_url":"https://globalenergymonitor.org/projects/global-solar-power-tracker/","publisher":"Global Energy Monitor","fetched_at":"2026-09-12T14:23:52.807356+00:00","confidence":"medium"},{"entity_id":"ae-gem-solar-g100000835495","record_type":"project","jurisdiction":"AE","data":{"id":"ae-gem-solar-g100000835495","name":"Mohammed Bin Rashid Al Maktoum Solar Park — 6b","asset_class":"solar","technology":"Solar PV","developer":"Dubai Electricity and Water Authority PJSC","mw":1200.0,"state":"Emirate of Dubai","country":"United Arab Emirates","stage":"under_construction","cod":"2026","source":"https://www.gem.wiki/Mohammed_Bin_Rashid_Al_Maktoum_Solar_Park","note":"Solar — Global Energy Monitor tracker (current, Feb 2026). Ownership: Dubai Electricity and Water Authority PJSC [100%]. Global Solar Power Tracker, Global Energy Monitor, February 2026, CC BY 4.0.","jurisdiction":"AE"},"source_url":"https://globalenergymonitor.org/projects/global-solar-power-tracker/","publisher":"Global Energy Monitor","fetched_at":"2026-09-12T14:23:52.807356+00:00","confidence":"medium"},{"entity_id":"ae-gem-solar-g100000835496","record_type":"project","jurisdiction":"AE","data":{"id":"ae-gem-solar-g100000835496","name":"Taqa-KIZAD Green Ammonia solar farm","asset_class":"solar","technology":"Solar PV","developer":"Abu Dhabi Ports (ADP)","mw":2000.0,"state":"Abu Dhabi","country":"United Arab Emirates","stage":"withdrawn","source":"https://www.gem.wiki/Taqa-KIZAD_Green_Ammonia_solar_farm","note":"Solar — Global Energy Monitor tracker (current, Feb 2026). Ownership: Abu Dhabi Ports (ADP) [100%]. Global Solar Power Tracker, Global Energy Monitor, February 2026, CC BY 4.0.","jurisdiction":"AE"},"source_url":"https://globalenergymonitor.org/projects/global-solar-power-tracker/","publisher":"Global Energy Monitor","fetched_at":"2026-09-12T14:23:52.807356+00:00","confidence":"medium"},{"entity_id":"ae-gem-solar-g100001021094","record_type":"project","jurisdiction":"AE","data":{"id":"ae-gem-solar-g100001021094","name":"Al Khazna solar farm","asset_class":"solar","technology":"Solar PV","developer":"Emirates Water and Electricity Company PJSC","mw":1500.0,"state":"Abu Dhabi Emirate","country":"United Arab Emirates","stage":"committed","cod":"2027","source":"https://www.gem.wiki/Al_Khazna_solar_farm","note":"Solar — Global Energy Monitor tracker (current, Feb 2026). Global Solar Power Tracker, Global Energy Monitor, February 2026, CC BY 4.0.","jurisdiction":"AE"},"source_url":"https://globalenergymonitor.org/projects/global-solar-power-tracker/","publisher":"Global Energy Monitor","fetched_at":"2026-09-12T14:23:52.807356+00:00","confidence":"medium"},{"entity_id":"ae-gem-solar-g100001021099","record_type":"project","jurisdiction":"AE","data":{"id":"ae-gem-solar-g100001021099","name":"Umm Al Quwain solar farm","asset_class":"solar","technology":"Solar PV","developer":"","mw":500.0,"state":"Umm Al Quwain Emirate","country":"United Arab Emirates","stage":"announced","source":"https://www.gem.wiki/Umm_Al_Quwain_solar_farm","note":"Solar — Global Energy Monitor tracker (current, Feb 2026). Global Solar Power Tracker, Global Energy Monitor, February 2026, CC BY 4.0.","jurisdiction":"AE"},"source_url":"https://globalenergymonitor.org/projects/global-solar-power-tracker/","publisher":"Global Energy Monitor","fetched_at":"2026-09-12T14:23:52.807356+00:00","confidence":"medium"},{"entity_id":"ae-gem-solar-g100001021106","record_type":"project","jurisdiction":"AE","data":{"id":"ae-gem-solar-g100001021106","name":"Uniper-Masdar Hydrogen solar farm","asset_class":"solar","technology":"Solar PV","developer":"","mw":1300.0,"country":"United Arab Emirates","stage":"committed","cod":"2026","source":"https://www.gem.wiki/Uniper-Masdar_Hydrogen_solar_farm","note":"Solar — Global Energy Monitor tracker (current, Feb 2026). Global Solar Power Tracker, Global Energy Monitor, February 2026, CC BY 4.0.","jurisdiction":"AE"},"source_url":"https://globalenergymonitor.org/projects/global-solar-power-tracker/","publisher":"Global Energy Monitor","fetched_at":"2026-09-12T14:23:52.807356+00:00","confidence":"medium"},{"entity_id":"ae-gem-solar-g100001021109","record_type":"project","jurisdiction":"AE","data":{"id":"ae-gem-solar-g100001021109","name":"Emerge-SNOC solar farm","asset_class":"solar","technology":"Solar PV","developer":"Electricité de France SA","mw":60.0,"country":"United Arab Emirates","stage":"operational","cod":"2025","source":"https://www.gem.wiki/Emerge-SNOC_solar_farm","note":"Solar — Global Energy Monitor tracker (current, Feb 2026). Ownership: Electricité de France SA; Abu Dhabi Future Energy Co; Sharjah National Oil  Corp. Global Solar Power Tracker, Global Energy Monitor, February 2026, CC BY 4.0.","jurisdiction":"AE"},"source_url":"https://globalenergymonitor.org/projects/global-solar-power-tracker/","publisher":"Global Energy Monitor","fetched_at":"2026-09-12T14:23:52.807356+00:00","confidence":"medium"},{"entity_id":"ae-gem-solar-g100001051527","record_type":"project","jurisdiction":"AE","data":{"id":"ae-gem-solar-g100001051527","name":"Etihad-Dubai Airports solar farm","asset_class":"solar","technology":"Solar PV","developer":"","mw":39.0,"state":"Dubai","country":"United Arab Emirates","stage":"announced","cod":"2026","source":"https://www.gem.wiki/Etihad-Dubai_Airports_solar_farm","note":"Solar — Global Energy Monitor tracker (current, Feb 2026). Global Solar Power Tracker, Global Energy Monitor, February 2026, CC BY 4.0.","jurisdiction":"AE"},"source_url":"https://globalenergymonitor.org/projects/global-solar-power-tracker/","publisher":"Global Energy Monitor","fetched_at":"2026-09-12T14:23:52.807356+00:00","confidence":"medium"},{"entity_id":"ae-gem-solar-g100001051529","record_type":"project","jurisdiction":"AE","data":{"id":"ae-gem-solar-g100001051529","name":"Mohammed Bin Rashid Al Maktoum Solar Park — 7a","asset_class":"solar","technology":"Solar PV","developer":"Dubai Electricity and Water Authority PJSC","mw":1600.0,"state":"Emirate of Dubai","country":"United Arab Emirates","stage":"committed","cod":"2027","source":"https://www.gem.wiki/Mohammed_Bin_Rashid_Al_Maktoum_Solar_Park","note":"Solar — Global Energy Monitor tracker (current, Feb 2026). Ownership: Dubai Electricity and Water Authority PJSC [100%]. Global Solar Power Tracker, Global Energy Monitor, February 2026, CC BY 4.0.","jurisdiction":"AE"},"source_url":"https://globalenergymonitor.org/projects/global-solar-power-tracker/","publisher":"Global Energy Monitor","fetched_at":"2026-09-12T14:23:52.807356+00:00","confidence":"medium"},{"entity_id":"ae-gem-solar-g100001051531","record_type":"project","jurisdiction":"AE","data":{"id":"ae-gem-solar-g100001051531","name":"Mohammed Bin Rashid Al Maktoum Solar Park — 7b","asset_class":"solar","technology":"Solar PV","developer":"Dubai Electricity and Water Authority PJSC","mw":400.0,"state":"Emirate of Dubai","country":"United Arab Emirates","stage":"committed","cod":"2029","source":"https://www.gem.wiki/Mohammed_Bin_Rashid_Al_Maktoum_Solar_Park","note":"Solar — Global Energy Monitor tracker (current, Feb 2026). Ownership: Dubai Electricity and Water Authority PJSC [100%]. Global Solar Power Tracker, Global Energy Monitor, February 2026, CC BY 4.0.","jurisdiction":"AE"},"source_url":"https://globalenergymonitor.org/projects/global-solar-power-tracker/","publisher":"Global Energy Monitor","fetched_at":"2026-09-12T14:23:52.807356+00:00","confidence":"medium"},{"entity_id":"ae-gem-solar-g100001051534","record_type":"project","jurisdiction":"AE","data":{"id":"ae-gem-solar-g100001051534","name":"Abu Dhabi solar farm","asset_class":"solar","technology":"Solar PV","developer":"Emirates Water and Electricity Company PJSC","mw":1000.0,"state":"Abu Dhabi","country":"United Arab Emirates","stage":"under_construction","cod":"2027","source":"https://www.gem.wiki/Abu_Dhabi_solar_farm","note":"Solar — Global Energy Monitor tracker (current, Feb 2026). Ownership: Emirates Water and Electricity Company PJSC; Masdar Clean Energy. Global Solar Power Tracker, Global Energy Monitor, February 2026, CC BY 4.0.","jurisdiction":"AE"},"source_url":"https://globalenergymonitor.org/projects/global-solar-power-tracker/","publisher":"Global Energy Monitor","fetched_at":"2026-09-12T14:23:52.807356+00:00","confidence":"medium"},{"entity_id":"ae-gem-solar-g100001051535","record_type":"project","jurisdiction":"AE","data":{"id":"ae-gem-solar-g100001051535","name":"Zarraf Solar PV farm","asset_class":"solar","technology":"Solar PV","developer":"Emirates Water and Electricity Company PJSC","mw":1500.0,"state":"Abu Dhabi","country":"United Arab Emirates","stage":"committed","source":"https://www.gem.wiki/Zarraf_Solar_PV_farm","note":"Solar — Global Energy Monitor tracker (current, Feb 2026). Ownership: EDF Power Solutions [20%]; Korea Western Power Co Ltd [20%]; Emirates Water and Electricity Company PJSC [60%]. Global Solar Power Tracker, Global Energy Monitor, February 2026, CC BY 4.0.","jurisdiction":"AE"},"source_url":"https://globalenergymonitor.org/projects/global-solar-power-tracker/","publisher":"Global Energy Monitor","fetched_at":"2026-09-12T14:23:52.807356+00:00","confidence":"medium"},{"entity_id":"ae-gem-solar-g100001073128","record_type":"project","jurisdiction":"AE","data":{"id":"ae-gem-solar-g100001073128","name":"Al Faya solar farm","asset_class":"solar","technology":"Solar PV","developer":"","mw":1500.0,"state":"Sharjah","country":"United Arab Emirates","stage":"announced","source":"https://www.gem.wiki/Al_Faya_solar_farm","note":"Solar — Global Energy Monitor tracker (current, Feb 2026). Global Solar Power Tracker, Global Energy Monitor, February 2026, CC BY 4.0.","jurisdiction":"AE"},"source_url":"https://globalenergymonitor.org/projects/global-solar-power-tracker/","publisher":"Global Energy Monitor","fetched_at":"2026-09-12T14:23:52.807356+00:00","confidence":"medium"},{"entity_id":"ae-gem-solar-g100001073136","record_type":"project","jurisdiction":"AE","data":{"id":"ae-gem-solar-g100001073136","name":"Masdar-Abu Dhabi solar farm","asset_class":"solar","technology":"Solar PV","developer":"Masdar Clean Energy","mw":5200.0,"state":"Abu Dhabi","country":"United Arab Emirates","stage":"under_construction","cod":"2027","source":"https://www.gem.wiki/Masdar-Abu_Dhabi_solar_farm","note":"Solar — Global Energy Monitor tracker (current, Feb 2026). Global Solar Power Tracker, Global Energy Monitor, February 2026, CC BY 4.0.","jurisdiction":"AE"},"source_url":"https://globalenergymonitor.org/projects/global-solar-power-tracker/","publisher":"Global Energy Monitor","fetched_at":"2026-09-12T14:23:52.807356+00:00","confidence":"medium"},{"entity_id":"ae-gem-solar-g100001073145","record_type":"project","jurisdiction":"AE","data":{"id":"ae-gem-solar-g100001073145","name":"EMSTEEL solar PV rooftop","asset_class":"solar","technology":"Solar PV","developer":"","mw":31.5,"country":"United Arab Emirates","stage":"committed","cod":"2026","source":"https://www.gem.wiki/EMSTEEL_solar_PV_rooftop","note":"Solar — Global Energy Monitor tracker (current, Feb 2026). Global Solar Power Tracker, Global Energy Monitor, February 2026, CC BY 4.0.","jurisdiction":"AE"},"source_url":"https://globalenergymonitor.org/projects/global-solar-power-tracker/","publisher":"Global Energy Monitor","fetched_at":"2026-09-12T14:23:52.807356+00:00","confidence":"medium"},{"entity_id":"ae-gem-wind-g100000908143","record_type":"project","jurisdiction":"AE","data":{"id":"ae-gem-wind-g100000908143","name":"Sir Bani Yas Island wind farm","asset_class":"wind","technology":"Wind","developer":"Abu Dhabi Tourism Development and Investment Co","mw":45.0,"state":"Abu Dhabi","country":"United Arab Emirates","stage":"operational","cod":"2023","source":"https://www.gem.wiki/Sir_Bani_Yas_Island_wind_farm","note":"Wind — Global Energy Monitor tracker (current, Feb 2026). Ownership: Abu Dhabi Tourism Development and Investment Co; Masdar Clean Energy. Global Wind Power Tracker, Global Energy Monitor, February 2026, CC BY 4.0.","jurisdiction":"AE"},"source_url":"https://globalenergymonitor.org/projects/global-wind-power-tracker/","publisher":"Global Energy Monitor","fetched_at":"2026-09-12T14:23:52.814512+00:00","confidence":"medium"},{"entity_id":"ae-gem-wind-g100001051536","record_type":"project","jurisdiction":"AE","data":{"id":"ae-gem-wind-g100001051536","name":"New Al Sila wind farm","asset_class":"wind","technology":"Wind","developer":"Emirates Water and Electricity Company PJSC","mw":140.0,"state":"Abu Dhabi","country":"United Arab Emirates","stage":"committed","source":"https://www.gem.wiki/New_Al_Sila_wind_farm","note":"Wind — Global Energy Monitor tracker (current, Feb 2026). Global Wind Power Tracker, Global Energy Monitor, February 2026, CC BY 4.0.","jurisdiction":"AE"},"source_url":"https://globalenergymonitor.org/projects/global-wind-power-tracker/","publisher":"Global Energy Monitor","fetched_at":"2026-09-12T14:23:52.814512+00:00","confidence":"medium"},{"entity_id":"ae-wri-wri1008724","record_type":"project","jurisdiction":"AE","data":{"id":"ae-wri-wri1008724","name":"Aweer \"H\" - Ph l","asset_class":"gas","technology":"Gas","developer":"DEWA","mw":607.0,"country":"United Arab Emirates","stage":"operational","cod":"1998","source":"http://www.auptde.org/NewsDetails.aspx?lang=en&NID=280","note":"Installed generation, WRI Global Power Plant Database (static ~2021 baseline; the live BESS layer is what moves). Originally compiled from: Arab Union of Electricity. Global Power Plant Database v1.3.0, World Resources Institute (WRI), licensed CC BY 4.0. Static ~2021 snapshot.","jurisdiction":"AE"},"source_url":"https://datasets.wri.org/dataset/globalpowerplantdatabase","publisher":"World Resources Institute","fetched_at":"2026-09-12T14:23:45.158354+00:00","confidence":"low"},{"entity_id":"ae-wri-wri1008726","record_type":"project","jurisdiction":"AE","data":{"id":"ae-wri-wri1008726","name":"Aweer \"H\" - Ph lll","asset_class":"gas","technology":"Gas","developer":"DEWA","mw":818.0,"country":"United Arab Emirates","stage":"operational","cod":"2008","source":"http://www.auptde.org/NewsDetails.aspx?lang=en&NID=282","note":"Installed generation, WRI Global Power Plant Database (static ~2021 baseline; the live BESS layer is what moves). Originally compiled from: Arab Union of Electricity. Global Power Plant Database v1.3.0, World Resources Institute (WRI), licensed CC BY 4.0. Static ~2021 snapshot.","jurisdiction":"AE"},"source_url":"https://datasets.wri.org/dataset/globalpowerplantdatabase","publisher":"World Resources Institute","fetched_at":"2026-09-12T14:23:45.158354+00:00","confidence":"low"},{"entity_id":"ae-wri-wri1008727","record_type":"project","jurisdiction":"AE","data":{"id":"ae-wri-wri1008727","name":"Al Mirfa Power Company","asset_class":"gas","technology":"Gas","developer":"ADWEA","mw":551.0,"country":"United Arab Emirates","stage":"operational","cod":"1998","source":"http://www.auptde.org/NewsDetails.aspx?lang=en&NID=283","note":"Installed generation, WRI Global Power Plant Database (static ~2021 baseline; the live BESS layer is what moves). Originally compiled from: Arab Union of Electricity. Global Power Plant Database v1.3.0, World Resources Institute (WRI), licensed CC BY 4.0. Static ~2021 snapshot.","jurisdiction":"AE"},"source_url":"https://datasets.wri.org/dataset/globalpowerplantdatabase","publisher":"World Resources Institute","fetched_at":"2026-09-12T14:23:45.158354+00:00","confidence":"low"},{"entity_id":"ae-wri-wri1008730","record_type":"project","jurisdiction":"AE","data":{"id":"ae-wri-wri1008730","name":"ESWPC (Fuj F1)","asset_class":"gas","technology":"Gas","developer":"Emirates SembCorp Water & Power Company  ADWEA & SembCorp Gulf Holding Co Ltd","mw":861.0,"country":"United Arab Emirates","stage":"operational","cod":"2004","source":"http://www.auptde.org/NewsDetails.aspx?lang=en&NID=283","note":"Installed generation, WRI Global Power Plant Database (static ~2021 baseline; the live BESS layer is what moves). Originally compiled from: Arab Union of Electricity. Global Power Plant Database v1.3.0, World Resources Institute (WRI), licensed CC BY 4.0. Static ~2021 snapshot.","jurisdiction":"AE"},"source_url":"https://datasets.wri.org/dataset/globalpowerplantdatabase","publisher":"World Resources Institute","fetched_at":"2026-09-12T14:23:45.158354+00:00","confidence":"low"},{"entity_id":"ae-wri-wri1008731","record_type":"project","jurisdiction":"AE","data":{"id":"ae-wri-wri1008731","name":"FAPCO (Fuj F2)","asset_class":"gas","technology":"Gas","developer":"Fujairah Asia Power Company  ADWEA &Fujairah F2 CV","mw":2114.0,"country":"United Arab Emirates","stage":"operational","cod":"2011","source":"http://www.auptde.org/NewsDetails.aspx?lang=en&NID=283","note":"Installed generation, WRI Global Power Plant Database (static ~2021 baseline; the live BESS layer is what moves). Originally compiled from: Arab Union of Electricity. Global Power Plant Database v1.3.0, World Resources Institute (WRI), licensed CC BY 4.0. Static ~2021 snapshot.","jurisdiction":"AE"},"source_url":"https://datasets.wri.org/dataset/globalpowerplantdatabase","publisher":"World Resources Institute","fetched_at":"2026-09-12T14:23:45.158354+00:00","confidence":"low"},{"entity_id":"ae-wri-wri1008732","record_type":"project","jurisdiction":"AE","data":{"id":"ae-wri-wri1008732","name":"Jebel Ali \"D\"","asset_class":"gas","technology":"Gas","developer":"DEWA","mw":1027.0,"country":"United Arab Emirates","stage":"operational","cod":"1979","source":"http://www.auptde.org/NewsDetails.aspx?lang=en&NID=284","note":"Installed generation, WRI Global Power Plant Database (static ~2021 baseline; the live BESS layer is what moves). Originally compiled from: Arab Union of Electricity. Global Power Plant Database v1.3.0, World Resources Institute (WRI), licensed CC BY 4.0. Static ~2021 snapshot.","jurisdiction":"AE"},"source_url":"https://datasets.wri.org/dataset/globalpowerplantdatabase","publisher":"World Resources Institute","fetched_at":"2026-09-12T14:23:45.158354+00:00","confidence":"low"},{"entity_id":"ae-wri-wri1008733","record_type":"project","jurisdiction":"AE","data":{"id":"ae-wri-wri1008733","name":"Jebel Ali \"E\"","asset_class":"gas","technology":"Gas","developer":"DEWA","mw":616.0,"country":"United Arab Emirates","stage":"operational","cod":"1989","source":"http://www.auptde.org/NewsDetails.aspx?lang=en&NID=285","note":"Installed generation, WRI Global Power Plant Database (static ~2021 baseline; the live BESS layer is what moves). Originally compiled from: Arab Union of Electricity. Global Power Plant Database v1.3.0, World Resources Institute (WRI), licensed CC BY 4.0. Static ~2021 snapshot.","jurisdiction":"AE"},"source_url":"https://datasets.wri.org/dataset/globalpowerplantdatabase","publisher":"World Resources Institute","fetched_at":"2026-09-12T14:23:45.158354+00:00","confidence":"low"},{"entity_id":"ae-wri-wri1008734","record_type":"project","jurisdiction":"AE","data":{"id":"ae-wri-wri1008734","name":"Jebel Ali \"G\"","asset_class":"gas","technology":"Gas","developer":"DEWA","mw":818.0,"country":"United Arab Emirates","stage":"operational","cod":"1993","source":"http://www.auptde.org/NewsDetails.aspx?lang=en&NID=286","note":"Installed generation, WRI Global Power Plant Database (static ~2021 baseline; the live BESS layer is what moves). Originally compiled from: Arab Union of Electricity. Global Power Plant Database v1.3.0, World Resources Institute (WRI), licensed CC BY 4.0. Static ~2021 snapshot.","jurisdiction":"AE"},"source_url":"https://datasets.wri.org/dataset/globalpowerplantdatabase","publisher":"World Resources Institute","fetched_at":"2026-09-12T14:23:45.158354+00:00","confidence":"low"},{"entity_id":"ae-wri-wri1008735","record_type":"project","jurisdiction":"AE","data":{"id":"ae-wri-wri1008735","name":"Jebel Ali \"K\"","asset_class":"gas","technology":"Gas","developer":"DEWA","mw":918.0,"country":"United Arab Emirates","stage":"operational","cod":"2002","source":"http://www.auptde.org/NewsDetails.aspx?lang=en&NID=287","note":"Installed generation, WRI Global Power Plant Database (static ~2021 baseline; the live BESS layer is what moves). Originally compiled from: Arab Union of Electricity. Global Power Plant Database v1.3.0, World Resources Institute (WRI), licensed CC BY 4.0. Static ~2021 snapshot.","jurisdiction":"AE"},"source_url":"https://datasets.wri.org/dataset/globalpowerplantdatabase","publisher":"World Resources Institute","fetched_at":"2026-09-12T14:23:45.158354+00:00","confidence":"low"},{"entity_id":"ae-wri-wri1008736","record_type":"project","jurisdiction":"AE","data":{"id":"ae-wri-wri1008736","name":"Jebel Ali \"L\" - Ph I","asset_class":"gas","technology":"Gas","developer":"DEWA","mw":969.0,"country":"United Arab Emirates","stage":"operational","cod":"2005","source":"http://www.auptde.org/NewsDetails.aspx?lang=en&NID=288","note":"Installed generation, WRI Global Power Plant Database (static ~2021 baseline; the live BESS layer is what moves). Originally compiled from: Arab Union of Electricity. Global Power Plant Database v1.3.0, World Resources Institute (WRI), licensed CC BY 4.0. Static ~2021 snapshot.","jurisdiction":"AE"},"source_url":"https://datasets.wri.org/dataset/globalpowerplantdatabase","publisher":"World Resources Institute","fetched_at":"2026-09-12T14:23:45.158354+00:00","confidence":"low"},{"entity_id":"ae-wri-wri1008737","record_type":"project","jurisdiction":"AE","data":{"id":"ae-wri-wri1008737","name":"Jebel Ali \"L\" - Ph ll","asset_class":"gas","technology":"Gas","developer":"DEWA","mw":1393.0,"country":"United Arab Emirates","stage":"operational","cod":"2007","source":"http://www.auptde.org/NewsDetails.aspx?lang=en&NID=289","note":"Installed generation, WRI Global Power Plant Database (static ~2021 baseline; the live BESS layer is what moves). Originally compiled from: Arab Union of Electricity. Global Power Plant Database v1.3.0, World Resources Institute (WRI), licensed CC BY 4.0. Static ~2021 snapshot.","jurisdiction":"AE"},"source_url":"https://datasets.wri.org/dataset/globalpowerplantdatabase","publisher":"World Resources Institute","fetched_at":"2026-09-12T14:23:45.158354+00:00","confidence":"low"},{"entity_id":"ae-wri-wri1008738","record_type":"project","jurisdiction":"AE","data":{"id":"ae-wri-wri1008738","name":"Jebel Ali \"M\"","asset_class":"gas","technology":"Gas","developer":"DEWA","mw":2060.0,"country":"United Arab Emirates","stage":"operational","cod":"2010","source":"http://www.auptde.org/NewsDetails.aspx?lang=en&NID=290","note":"Installed generation, WRI Global Power Plant Database (static ~2021 baseline; the live BESS layer is what moves). Originally compiled from: Arab Union of Electricity. Global Power Plant Database v1.3.0, World Resources Institute (WRI), licensed CC BY 4.0. Static ~2021 snapshot.","jurisdiction":"AE"},"source_url":"https://datasets.wri.org/dataset/globalpowerplantdatabase","publisher":"World Resources Institute","fetched_at":"2026-09-12T14:23:45.158354+00:00","confidence":"low"},{"entity_id":"ae-wri-wri1008743","record_type":"project","jurisdiction":"AE","data":{"id":"ae-wri-wri1008743","name":"Shuweihat S1","asset_class":"gas","technology":"Gas","developer":"Shuweihat CMS International Power Company","mw":4889.0,"country":"United Arab Emirates","stage":"operational","cod":"2005","source":"http://www.auptde.org/NewsDetails.aspx?lang=en&NID=292","note":"Installed generation, WRI Global Power Plant Database (static ~2021 baseline; the live BESS layer is what moves). Originally compiled from: Arab Union of Electricity. Global Power Plant Database v1.3.0, World Resources Institute (WRI), licensed CC BY 4.0. Static ~2021 snapshot.","jurisdiction":"AE"},"source_url":"https://datasets.wri.org/dataset/globalpowerplantdatabase","publisher":"World Resources Institute","fetched_at":"2026-09-12T14:23:45.158354+00:00","confidence":"low"},{"entity_id":"ae-wri-wri1008744","record_type":"project","jurisdiction":"AE","data":{"id":"ae-wri-wri1008744","name":"Taweelah A1","asset_class":"gas","technology":"Gas","developer":"Gulf Total Tractebel Power Company  ADWEA","mw":1671.0,"country":"United Arab Emirates","stage":"operational","cod":"2000","source":"http://www.auptde.org/NewsDetails.aspx?lang=en&NID=283","note":"Installed generation, WRI Global Power Plant Database (static ~2021 baseline; the live BESS layer is what moves). Originally compiled from: Arab Union of Electricity. Global Power Plant Database v1.3.0, World Resources Institute (WRI), licensed CC BY 4.0. Static ~2021 snapshot.","jurisdiction":"AE"},"source_url":"https://datasets.wri.org/dataset/globalpowerplantdatabase","publisher":"World Resources Institute","fetched_at":"2026-09-12T14:23:45.158354+00:00","confidence":"low"},{"entity_id":"ae-wri-wri1008745","record_type":"project","jurisdiction":"AE","data":{"id":"ae-wri-wri1008745","name":"Taweelah A2","asset_class":"gas","technology":"Gas","developer":"Emirates CMS Power Company","mw":760.0,"country":"United Arab Emirates","stage":"operational","cod":"2001","source":"http://www.auptde.org/NewsDetails.aspx?lang=en&NID=283","note":"Installed generation, WRI Global Power Plant Database (static ~2021 baseline; the live BESS layer is what moves). Originally compiled from: Arab Union of Electricity. Global Power Plant Database v1.3.0, World Resources Institute (WRI), licensed CC BY 4.0. Static ~2021 snapshot.","jurisdiction":"AE"},"source_url":"https://datasets.wri.org/dataset/globalpowerplantdatabase","publisher":"World Resources Institute","fetched_at":"2026-09-12T14:23:45.158354+00:00","confidence":"low"},{"entity_id":"ae-wri-wri1008746","record_type":"project","jurisdiction":"AE","data":{"id":"ae-wri-wri1008746","name":"TAPCO","asset_class":"gas","technology":"Gas","developer":"ADWEA  TAQA  & CMS Generation Taweelah Limited","mw":2200.0,"country":"United Arab Emirates","stage":"operational","cod":"2005","source":"http://www.auptde.org/NewsDetails.aspx?lang=en&NID=283","note":"Installed generation, WRI Global Power Plant Database (static ~2021 baseline; the live BESS layer is what moves). Originally compiled from: Arab Union of Electricity. Global Power Plant Database v1.3.0, World Resources Institute (WRI), licensed CC BY 4.0. Static ~2021 snapshot.","jurisdiction":"AE"},"source_url":"https://datasets.wri.org/dataset/globalpowerplantdatabase","publisher":"World Resources Institute","fetched_at":"2026-09-12T14:23:45.158354+00:00","confidence":"low"},{"entity_id":"ae-wri-wri1008747","record_type":"project","jurisdiction":"AE","data":{"id":"ae-wri-wri1008747","name":"APC UAN","asset_class":"gas","technology":"Gas","developer":"Arabian power Company  ADWEA  IPR  TEPCO  and Mitsui","mw":2430.0,"country":"United Arab Emirates","stage":"operational","cod":"2003","source":"http://www.auptde.org/NewsDetails.aspx?lang=en&NID=283","note":"Installed generation, WRI Global Power Plant Database (static ~2021 baseline; the live BESS layer is what moves). Originally compiled from: Arab Union of Electricity. Global Power Plant Database v1.3.0, World Resources Institute (WRI), licensed CC BY 4.0. Static ~2021 snapshot.","jurisdiction":"AE"},"source_url":"https://datasets.wri.org/dataset/globalpowerplantdatabase","publisher":"World Resources Institute","fetched_at":"2026-09-12T14:23:45.158354+00:00","confidence":"low"},{"entity_id":"ae-wri-wri1023580","record_type":"project","jurisdiction":"AE","data":{"id":"ae-wri-wri1023580","name":"Ajman","asset_class":"gas","technology":"Gas","developer":"FEWA","mw":116.0,"country":"United Arab Emirates","stage":"operational","cod":"1980","source":"http://www.auptde.org/NewsDetails.aspx?lang=en&NID=283","note":"Installed generation, WRI Global Power Plant Database (static ~2021 baseline; the live BESS layer is what moves). Originally compiled from: Arab Union of Electricity. Global Power Plant Database v1.3.0, World Resources Institute (WRI), licensed CC BY 4.0. Static ~2021 snapshot.","jurisdiction":"AE"},"source_url":"https://datasets.wri.org/dataset/globalpowerplantdatabase","publisher":"World Resources Institute","fetched_at":"2026-09-12T14:23:45.158354+00:00","confidence":"low"},{"entity_id":"ae-wri-wri1023581","record_type":"project","jurisdiction":"AE","data":{"id":"ae-wri-wri1023581","name":"Hamriyah Power Station (HPS)","asset_class":"gas","technology":"Gas","developer":"SEWA","mw":504.0,"country":"United Arab Emirates","stage":"operational","cod":"2006","source":"http://www.auptde.org/NewsDetails.aspx?lang=en&NID=283","note":"Installed generation, WRI Global Power Plant Database (static ~2021 baseline; the live BESS layer is what moves). Originally compiled from: Arab Union of Electricity. Global Power Plant Database v1.3.0, World Resources Institute (WRI), licensed CC BY 4.0. Static ~2021 snapshot.","jurisdiction":"AE"},"source_url":"https://datasets.wri.org/dataset/globalpowerplantdatabase","publisher":"World Resources Institute","fetched_at":"2026-09-12T14:23:45.158354+00:00","confidence":"low"},{"entity_id":"ae-wri-wri1023583","record_type":"project","jurisdiction":"AE","data":{"id":"ae-wri-wri1023583","name":"Khorfakkan Station (KHPS)","asset_class":"gas","technology":"Gas","developer":"SEWA","mw":144.0,"country":"United Arab Emirates","stage":"operational","cod":"1987","source":"http://www.auptde.org/NewsDetails.aspx?lang=en&NID=283","note":"Installed generation, WRI Global Power Plant Database (static ~2021 baseline; the live BESS layer is what moves). Originally compiled from: Arab Union of Electricity. Global Power Plant Database v1.3.0, World Resources Institute (WRI), licensed CC BY 4.0. Static ~2021 snapshot.","jurisdiction":"AE"},"source_url":"https://datasets.wri.org/dataset/globalpowerplantdatabase","publisher":"World Resources Institute","fetched_at":"2026-09-12T14:23:45.158354+00:00","confidence":"low"},{"entity_id":"ae-wri-wri1023584","record_type":"project","jurisdiction":"AE","data":{"id":"ae-wri-wri1023584","name":"Layyah Power Station (LPS)","asset_class":"gas","technology":"Gas","developer":"SEWA","mw":911.0,"country":"United Arab Emirates","stage":"operational","cod":"1977","source":"http://www.auptde.org/NewsDetails.aspx?lang=en&NID=283","note":"Installed generation, WRI Global Power Plant Database (static ~2021 baseline; the live BESS layer is what moves). Originally compiled from: Arab Union of Electricity. Global Power Plant Database v1.3.0, World Resources Institute (WRI), licensed CC BY 4.0. Static ~2021 snapshot.","jurisdiction":"AE"},"source_url":"https://datasets.wri.org/dataset/globalpowerplantdatabase","publisher":"World Resources Institute","fetched_at":"2026-09-12T14:23:45.158354+00:00","confidence":"low"},{"entity_id":"ae-wri-wri1023586","record_type":"project","jurisdiction":"AE","data":{"id":"ae-wri-wri1023586","name":"New Mirfah (MIPCO)","asset_class":"gas","technology":"Gas","developer":"ADWEA","mw":1728.0,"country":"United Arab Emirates","stage":"operational","cod":"2016","source":"http://www.auptde.org/NewsDetails.aspx?lang=en&NID=283","note":"Installed generation, WRI Global Power Plant Database (static ~2021 baseline; the live BESS layer is what moves). Originally compiled from: Arab Union of Electricity. Global Power Plant Database v1.3.0, World Resources Institute (WRI), licensed CC BY 4.0. Static ~2021 snapshot.","jurisdiction":"AE"},"source_url":"https://datasets.wri.org/dataset/globalpowerplantdatabase","publisher":"World Resources Institute","fetched_at":"2026-09-12T14:23:45.158354+00:00","confidence":"low"},{"entity_id":"ae-wri-wri1023589","record_type":"project","jurisdiction":"AE","data":{"id":"ae-wri-wri1023589","name":"Wasit Power Station (WPS)","asset_class":"gas","technology":"Gas","developer":"SEWA","mw":1182.0,"country":"United Arab Emirates","stage":"operational","cod":"1998","source":"http://www.auptde.org/NewsDetails.aspx?lang=en&NID=285","note":"Installed generation, WRI Global Power Plant Database (static ~2021 baseline; the live BESS layer is what moves). Originally compiled from: Arab Union of Electricity. Global Power Plant Database v1.3.0, World Resources Institute (WRI), licensed CC BY 4.0. Static ~2021 snapshot.","jurisdiction":"AE"},"source_url":"https://datasets.wri.org/dataset/globalpowerplantdatabase","publisher":"World Resources Institute","fetched_at":"2026-09-12T14:23:45.158354+00:00","confidence":"low"},{"entity_id":"ae-wri-wri1023590","record_type":"project","jurisdiction":"AE","data":{"id":"ae-wri-wri1023590","name":"zawra","asset_class":"gas","technology":"Gas","developer":"FEWA","mw":200.0,"country":"United Arab Emirates","stage":"operational","cod":"1980","source":"http://www.auptde.org/NewsDetails.aspx?lang=en&NID=286","note":"Installed generation, WRI Global Power Plant Database (static ~2021 baseline; the live BESS layer is what moves). Originally compiled from: Arab Union of Electricity. Global Power Plant Database v1.3.0, World Resources Institute (WRI), licensed CC BY 4.0. Static ~2021 snapshot.","jurisdiction":"AE"},"source_url":"https://datasets.wri.org/dataset/globalpowerplantdatabase","publisher":"World Resources Institute","fetched_at":"2026-09-12T14:23:45.158354+00:00","confidence":"low"},{"entity_id":"aemo-abermain-bess","record_type":"project","jurisdiction":"AU-QLD","data":{"id":"aemo-abermain-bess","name":"Abermain BESS","asset_class":"battery","technology":"Battery Storage","developer":"Firm Power P/L","mw":127.4,"mwh":254.1,"state":"QLD","country":"Australia","stage":"announced","cod":"2029-12-28","source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","jurisdiction":"AU-QLD"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","publisher":"AEMO","fetched_at":"2026-10-05T00:28:16.697779+00:00","confidence":"high"},{"entity_id":"aemo-act-bess","record_type":"project","jurisdiction":"AU-NSW","data":{"id":"aemo-act-bess","name":"ACT BESS","asset_class":"battery","technology":"Battery Storage","developer":"Berrybank 2 Asset Pty Ltd as Trustee for Berrybank 2 Asset Trust","mw":10.0,"mwh":20.0,"state":"NSW","country":"Australia","stage":"operational","source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","jurisdiction":"AU-NSW"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","publisher":"AEMO","fetched_at":"2026-10-05T00:28:16.697779+00:00","confidence":"high"},{"entity_id":"aemo-adelaide-desalination-plant","record_type":"project","jurisdiction":"AU-SA","data":{"id":"aemo-adelaide-desalination-plant","name":"Adelaide Desalination Plant","asset_class":"battery","technology":"Battery Storage","developer":"South Australian Water Corporation","mw":6.3,"mwh":12.6,"state":"SA","country":"Australia","stage":"operational","source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","jurisdiction":"AU-SA"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","publisher":"AEMO","fetched_at":"2026-10-05T00:28:16.697779+00:00","confidence":"high"},{"entity_id":"aemo-alberton-wind-farm","record_type":"project","jurisdiction":"AU-VIC","data":{"id":"aemo-alberton-wind-farm","name":"Alberton Wind Farm","asset_class":"wind","technology":"Wind","developer":"Synergy Wind Pty Ltd","mw":122.4,"state":"VIC","country":"Australia","stage":"announced","source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","jurisdiction":"AU-VIC"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","publisher":"AEMO","fetched_at":"2026-10-05T00:28:16.697779+00:00","confidence":"high"},{"entity_id":"aemo-albury-mill-bess-kci","record_type":"project","jurisdiction":"AU-NSW","data":{"id":"aemo-albury-mill-bess-kci","name":"Albury Mill BESS - KCI","asset_class":"battery","technology":"Battery Storage","developer":"VISY PULP AND PAPER PTY. LTD.","mw":350.0,"state":"NSW","country":"Australia","stage":"announced","source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","jurisdiction":"AU-NSW"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","publisher":"AEMO","fetched_at":"2026-10-05T00:28:16.697779+00:00","confidence":"high"},{"entity_id":"aemo-aldoga-bess","record_type":"project","jurisdiction":"AU-QLD","data":{"id":"aemo-aldoga-bess","name":"Aldoga BESS","asset_class":"battery","technology":"Battery Storage","developer":"Acciona Energy Australia Global","mw":400.0,"mwh":800.0,"state":"QLD","country":"Australia","stage":"announced","cod":"2030-12-31","source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","jurisdiction":"AU-QLD"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","publisher":"AEMO","fetched_at":"2026-10-05T00:28:16.697779+00:00","confidence":"high"},{"entity_id":"aemo-aldoga-solar-farm","record_type":"project","jurisdiction":"AU-QLD","data":{"id":"aemo-aldoga-solar-farm","name":"Aldoga Solar Farm","asset_class":"solar","technology":"Solar PV","developer":"Acciona Energy Australia Global Pty Ltd","mw":387.8,"state":"QLD","country":"Australia","stage":"operational","cod":"2025-09-29","source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","jurisdiction":"AU-QLD"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","publisher":"AEMO","fetched_at":"2026-10-05T00:28:16.697779+00:00","confidence":"high"},{"entity_id":"aemo-alligator-creek-bess","record_type":"project","jurisdiction":"AU-QLD","data":{"id":"aemo-alligator-creek-bess","name":"Alligator Creek BESS","asset_class":"battery","technology":"Battery Storage","developer":"Alligator Creek BESS Pty Ltd","mw":120.0,"state":"QLD","country":"Australia","stage":"announced","source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","jurisdiction":"AU-QLD"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","publisher":"AEMO","fetched_at":"2026-10-05T00:28:16.697779+00:00","confidence":"high"},{"entity_id":"aemo-angaston","record_type":"project","jurisdiction":"AU-SA","data":{"id":"aemo-angaston","name":"Angaston","asset_class":"gas","technology":"Gas Turbine","developer":"Snowy Hydro Ltd","mw":30.8,"state":"SA","country":"Australia","stage":"operational","source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","jurisdiction":"AU-SA"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","publisher":"AEMO","fetched_at":"2026-10-05T00:28:16.697779+00:00","confidence":"high"},{"entity_id":"aemo-appin","record_type":"project","jurisdiction":"AU-NSW","data":{"id":"aemo-appin","name":"Appin","asset_class":"other","technology":"Other","developer":"EDL CSM NSW Pty Ltd","mw":55.6,"state":"NSW","country":"Australia","stage":"operational","source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","jurisdiction":"AU-NSW"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","publisher":"AEMO","fetched_at":"2026-10-05T00:28:16.697779+00:00","confidence":"high"},{"entity_id":"aemo-apsley-bess-project","record_type":"project","jurisdiction":"AU-NSW","data":{"id":"aemo-apsley-bess-project","name":"Apsley BESS Project","asset_class":"battery","technology":"Battery Storage","developer":"BW Ess Australia Pty Ltd","mw":120.0,"mwh":260.0,"state":"NSW","country":"Australia","stage":"announced","source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","jurisdiction":"AU-NSW"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","publisher":"AEMO","fetched_at":"2026-10-05T00:28:16.697779+00:00","confidence":"high"},{"entity_id":"aemo-aquila-wind","record_type":"project","jurisdiction":"AU-NSW","data":{"id":"aemo-aquila-wind","name":"Aquila Wind","asset_class":"wind","technology":"Wind","developer":"ACEN Australia Pty Ltd","mw":201.6,"state":"NSW","country":"Australia","stage":"announced","cod":"2032-12-01","source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","jurisdiction":"AU-NSW"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","publisher":"AEMO","fetched_at":"2026-10-05T00:28:16.697779+00:00","confidence":"high"},{"entity_id":"aemo-aramara-solar-farm","record_type":"project","jurisdiction":"AU-QLD","data":{"id":"aemo-aramara-solar-farm","name":"Aramara Solar Farm","asset_class":"solar","technology":"Solar PV","developer":"Aramara Solar Pty Ltd","mw":132.0,"state":"QLD","country":"Australia","stage":"anticipated","cod":"2028-06-15","source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","jurisdiction":"AU-QLD"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","publisher":"AEMO","fetched_at":"2026-10-05T00:28:16.697779+00:00","confidence":"high"},{"entity_id":"aemo-ararat-wind-farm","record_type":"project","jurisdiction":"AU-VIC","data":{"id":"aemo-ararat-wind-farm","name":"Ararat Wind Farm","asset_class":"wind","technology":"Wind","developer":"Ararat Wind Farm Pty Ltd","mw":240.0,"state":"VIC","country":"Australia","stage":"operational","source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","jurisdiction":"AU-VIC"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","publisher":"AEMO","fetched_at":"2026-10-05T00:28:16.697779+00:00","confidence":"high"},{"entity_id":"aemo-ardandra-solar-farm-and-bess","record_type":"project","jurisdiction":"AU-QLD","data":{"id":"aemo-ardandra-solar-farm-and-bess","name":"Ardandra Solar Farm And BESS","asset_class":"battery","technology":"Battery Storage","developer":"Ardandra SF Pty Ltd as trustee for Ardandra SF Trust","mw":75.0,"mwh":150.0,"state":"QLD","country":"Australia","stage":"announced","cod":"2029-05-18","source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","jurisdiction":"AU-QLD"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","publisher":"AEMO","fetched_at":"2026-10-05T00:28:16.697779+00:00","confidence":"high"},{"entity_id":"aemo-argoon-wind-farm-res-group-kci","record_type":"project","jurisdiction":"AU-NSW","data":{"id":"aemo-argoon-wind-farm-res-group-kci","name":"Argoon Wind Farm (RES Group) - KCI","asset_class":"wind","technology":"Wind","developer":"Argoon Wind Farm Project Co Pty Ltd as trustee of the Argoon Wind Farm Project Trust","mw":763.2,"state":"NSW","country":"Australia","stage":"announced","source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","jurisdiction":"AU-NSW"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","publisher":"AEMO","fetched_at":"2026-10-05T00:28:16.697779+00:00","confidence":"high"},{"entity_id":"aemo-argyle-solar-farm","record_type":"project","jurisdiction":"AU-NSW","data":{"id":"aemo-argyle-solar-farm","name":"Argyle Solar Farm","asset_class":"solar","technology":"Solar PV","developer":"Argyle Solar Farm Pty Ltd","mw":59.8,"state":"NSW","country":"Australia","stage":"announced","source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","jurisdiction":"AU-NSW"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","publisher":"AEMO","fetched_at":"2026-10-05T00:28:16.697779+00:00","confidence":"high"},{"entity_id":"aemo-armidale-bess","record_type":"project","jurisdiction":"AU-NSW","data":{"id":"aemo-armidale-bess","name":"Armidale BESS","asset_class":"battery","technology":"Battery Storage","developer":"Armidale BESS Project Pty Ltd","mw":150.0,"mwh":750.0,"state":"NSW","country":"Australia","stage":"announced","cod":"2028-03-31","source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","jurisdiction":"AU-NSW"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","publisher":"AEMO","fetched_at":"2026-10-05T00:28:16.697779+00:00","confidence":"high"},{"entity_id":"aemo-armidale-east-bess","record_type":"project","jurisdiction":"AU-NSW","data":{"id":"aemo-armidale-east-bess","name":"Armidale East BESS","asset_class":"battery","technology":"Battery Storage","developer":"FRV Services Australia","mw":382.7,"mwh":1890.0,"state":"NSW","country":"Australia","stage":"anticipated","cod":"2030-08-30","source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","jurisdiction":"AU-NSW"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","publisher":"AEMO","fetched_at":"2026-10-05T00:28:16.697779+00:00","confidence":"high"},{"entity_id":"aemo-arthur-s-hill-energy-park-kci","record_type":"project","jurisdiction":"AU-NSW","data":{"id":"aemo-arthur-s-hill-energy-park-kci","name":"Arthur's Hill Energy Park - KCI","asset_class":"battery","technology":"Battery Storage","developer":"Pacific Green Energy Parks Developments Pty Ltd","mw":500.0,"state":"NSW","country":"Australia","stage":"announced","source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","jurisdiction":"AU-NSW"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","publisher":"AEMO","fetched_at":"2026-10-05T00:28:16.697779+00:00","confidence":"high"},{"entity_id":"aemo-ashleigh-park-bess-kci","record_type":"project","jurisdiction":"AU-NSW","data":{"id":"aemo-ashleigh-park-bess-kci","name":"Ashleigh Park BESS - KCI","asset_class":"battery","technology":"Battery Storage","developer":"Ashleigh Park Beef Pty Ltd","mw":300.0,"state":"NSW","country":"Australia","stage":"announced","source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","jurisdiction":"AU-NSW"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","publisher":"AEMO","fetched_at":"2026-10-05T00:28:16.697779+00:00","confidence":"high"},{"entity_id":"aemo-augusta-bess","record_type":"project","jurisdiction":"AU-SA","data":{"id":"aemo-augusta-bess","name":"Augusta BESS","asset_class":"battery","technology":"Battery Storage","developer":"Augusta BESS Pty Ltd","mw":269.8,"mwh":1080.0,"state":"SA","country":"Australia","stage":"announced","cod":"2029-04-23","source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","jurisdiction":"AU-SA"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","publisher":"AEMO","fetched_at":"2026-10-05T00:28:16.697779+00:00","confidence":"high"},{"entity_id":"aemo-aurora-solar-energy-project-phase-1","record_type":"project","jurisdiction":"AU-SA","data":{"id":"aemo-aurora-solar-energy-project-phase-1","name":"Aurora Solar Energy Project - Phase 1","asset_class":"battery","technology":"Battery Storage","developer":"SiliconAurora","mw":140.0,"mwh":140.0,"state":"SA","country":"Australia","stage":"announced","source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","jurisdiction":"AU-SA"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","publisher":"AEMO","fetched_at":"2026-10-05T00:28:16.697779+00:00","confidence":"high"},{"entity_id":"aemo-australia-plains-solar-farm","record_type":"project","jurisdiction":"AU-SA","data":{"id":"aemo-australia-plains-solar-farm","name":"Australia Plains Solar Farm","asset_class":"solar","technology":"Solar PV","developer":"Gree","mw":200.0,"state":"SA","country":"Australia","stage":"announced","source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","jurisdiction":"AU-SA"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","publisher":"AEMO","fetched_at":"2026-10-05T00:28:16.697779+00:00","confidence":"high"},{"entity_id":"aemo-avonlie-solar-farm","record_type":"project","jurisdiction":"AU-NSW","data":{"id":"aemo-avonlie-solar-farm","name":"Avonlie Solar Farm","asset_class":"solar","technology":"Solar PV","developer":"Iberdrola Australia Limited","mw":254.1,"state":"NSW","country":"Australia","stage":"operational","source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","jurisdiction":"AU-NSW"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","publisher":"AEMO","fetched_at":"2026-10-05T00:28:16.697779+00:00","confidence":"high"},{"entity_id":"aemo-awaba-bess","record_type":"project","jurisdiction":"AU-NSW","data":{"id":"aemo-awaba-bess","name":"Awaba BESS","asset_class":"battery","technology":"Battery Storage","developer":"firmpower_NR","mw":54.0,"mwh":107.8,"state":"NSW","country":"Australia","stage":"announced","cod":"2028-12-22","source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","jurisdiction":"AU-NSW"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","publisher":"AEMO","fetched_at":"2026-10-05T00:28:16.697779+00:00","confidence":"high"},{"entity_id":"aemo-axedale-solar-farm-and-battery-energy-storage-system","record_type":"project","jurisdiction":"AU-VIC","data":{"id":"aemo-axedale-solar-farm-and-battery-energy-storage-system","name":"Axedale Solar Farm and Battery Energy Storage System","asset_class":"battery","technology":"Battery Storage","developer":"FRV Services Australia","mw":49.9,"mwh":99.8,"state":"VIC","country":"Australia","stage":"anticipated","cod":"2028-08-31","source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","jurisdiction":"AU-VIC"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","publisher":"AEMO","fetched_at":"2026-10-05T00:28:16.697779+00:00","confidence":"high"},{"entity_id":"aemo-bairnsdale","record_type":"project","jurisdiction":"AU-VIC","data":{"id":"aemo-bairnsdale","name":"Bairnsdale","asset_class":"gas","technology":"Gas Turbine","developer":"Alinta DEBO","mw":47.0,"state":"VIC","country":"Australia","stage":"operational","source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","jurisdiction":"AU-VIC"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","publisher":"AEMO","fetched_at":"2026-10-05T00:28:16.697779+00:00","confidence":"high"},{"entity_id":"aemo-bairnsdale-bess","record_type":"project","jurisdiction":"AU-VIC","data":{"id":"aemo-bairnsdale-bess","name":"Bairnsdale BESS","asset_class":"battery","technology":"Battery Storage","developer":"Bison Energy","mw":65.0,"mwh":260.0,"state":"VIC","country":"Australia","stage":"announced","source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","jurisdiction":"AU-VIC"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","publisher":"AEMO","fetched_at":"2026-10-05T00:28:16.697779+00:00","confidence":"high"},{"entity_id":"aemo-baking-board-solar-farm-chinchilla","record_type":"project","jurisdiction":"AU-QLD","data":{"id":"aemo-baking-board-solar-farm-chinchilla","name":"Baking Board Solar Farm Chinchilla","asset_class":"solar","technology":"Solar PV","developer":"Chinchilla Solar Pty Ltd","mw":14.7,"state":"QLD","country":"Australia","stage":"operational","source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","jurisdiction":"AU-QLD"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","publisher":"AEMO","fetched_at":"2026-10-05T00:28:16.697779+00:00","confidence":"high"},{"entity_id":"aemo-bald-hills-wind-farm","record_type":"project","jurisdiction":"AU-VIC","data":{"id":"aemo-bald-hills-wind-farm","name":"Bald Hills Wind Farm","asset_class":"wind","technology":"Wind","developer":"Bald Hills Wind Farm Pty Ltd","mw":106.6,"state":"VIC","country":"Australia","stage":"operational","source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","jurisdiction":"AU-VIC"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","publisher":"AEMO","fetched_at":"2026-10-05T00:28:16.697779+00:00","confidence":"high"},{"entity_id":"aemo-baldon-wind-farm","record_type":"project","jurisdiction":"AU-NSW","data":{"id":"aemo-baldon-wind-farm","name":"Baldon Wind Farm","asset_class":"wind","technology":"Wind","developer":"Baldon Wind Farm Pty Ltd","mw":360.0,"state":"NSW","country":"Australia","stage":"announced","cod":"2029-06-30","source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","jurisdiction":"AU-NSW"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","publisher":"AEMO","fetched_at":"2026-10-05T00:28:16.697779+00:00","confidence":"high"},{"entity_id":"aemo-baldon-wind-farm-stage-2","record_type":"project","jurisdiction":"AU-NSW","data":{"id":"aemo-baldon-wind-farm-stage-2","name":"Baldon Wind Farm Stage 2","asset_class":"wind","technology":"Wind","developer":"Baldon Wind Farm Pty Ltd","mw":1040.0,"state":"NSW","country":"Australia","stage":"announced","cod":"2029-07-28","source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","jurisdiction":"AU-NSW"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","publisher":"AEMO","fetched_at":"2026-10-05T00:28:16.697779+00:00","confidence":"high"},{"entity_id":"aemo-baldon-wind-farm-stage-2-bess","record_type":"project","jurisdiction":"AU-NSW","data":{"id":"aemo-baldon-wind-farm-stage-2-bess","name":"Baldon Wind Farm Stage 2 - BESS","asset_class":"battery","technology":"Battery Storage","developer":"Baldon Wind Farm Pty Ltd","mw":500.0,"mwh":1000.0,"state":"NSW","country":"Australia","stage":"announced","cod":"2030-07-27","source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","jurisdiction":"AU-NSW"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","publisher":"AEMO","fetched_at":"2026-10-05T00:28:16.697779+00:00","confidence":"high"},{"entity_id":"aemo-ballarat-base-hospital-plant","record_type":"project","jurisdiction":"AU-VIC","data":{"id":"aemo-ballarat-base-hospital-plant","name":"Ballarat Base Hospital Plant","asset_class":"gas","technology":"Gas Turbine","developer":"Ballarat Health Services","mw":1.6,"state":"VIC","country":"Australia","stage":"operational","source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","jurisdiction":"AU-VIC"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","publisher":"AEMO","fetched_at":"2026-10-05T00:28:16.697779+00:00","confidence":"high"},{"entity_id":"aemo-ballarat-energy-storage-system","record_type":"project","jurisdiction":"AU-VIC","data":{"id":"aemo-ballarat-energy-storage-system","name":"Ballarat Energy Storage System","asset_class":"battery","technology":"Battery Storage","developer":"Ausnet Transmission Group Pty Ltd","mw":30.1,"mwh":30.1,"state":"VIC","country":"Australia","stage":"operational","source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","jurisdiction":"AU-VIC"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","publisher":"AEMO","fetched_at":"2026-10-05T00:28:16.697779+00:00","confidence":"high"},{"entity_id":"aemo-banana-range-wind-farm","record_type":"project","jurisdiction":"AU-QLD","data":{"id":"aemo-banana-range-wind-farm","name":"Banana Range Wind Farm","asset_class":"wind","technology":"Wind","developer":"Orange Creek Energy Pty Ltd","mw":273.0,"state":"QLD","country":"Australia","stage":"announced","cod":"2029-12-31","source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","jurisdiction":"AU-QLD"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","publisher":"AEMO","fetched_at":"2026-10-05T00:28:16.697779+00:00","confidence":"high"},{"entity_id":"aemo-bango-973-wind-farm","record_type":"project","jurisdiction":"AU-NSW","data":{"id":"aemo-bango-973-wind-farm","name":"Bango 973 Wind Farm","asset_class":"wind","technology":"Wind","developer":"BWF Nominees Pty Ltd as trustee for the BWF Trust","mw":159.0,"state":"NSW","country":"Australia","stage":"operational","source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","jurisdiction":"AU-NSW"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","publisher":"AEMO","fetched_at":"2026-10-05T00:28:16.697779+00:00","confidence":"high"},{"entity_id":"aemo-bango-999-wind-farm","record_type":"project","jurisdiction":"AU-NSW","data":{"id":"aemo-bango-999-wind-farm","name":"Bango 999 Wind Farm","asset_class":"wind","technology":"Wind","developer":"BWF Nominees Pty Ltd as trustee for the BWF Trust","mw":84.8,"state":"NSW","country":"Australia","stage":"operational","source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","jurisdiction":"AU-NSW"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","publisher":"AEMO","fetched_at":"2026-10-05T00:28:16.697779+00:00","confidence":"high"},{"entity_id":"aemo-banimboola","record_type":"project","jurisdiction":"AU-VIC","data":{"id":"aemo-banimboola","name":"Banimboola","asset_class":"hydro","technology":"Hydro","developer":"AGL Hydro Partnership","mw":10.0,"state":"VIC","country":"Australia","stage":"operational","source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","jurisdiction":"AU-VIC"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","publisher":"AEMO","fetched_at":"2026-10-05T00:28:16.697779+00:00","confidence":"high"},{"entity_id":"aemo-banksia-solar-farm","record_type":"project","jurisdiction":"AU-QLD","data":{"id":"aemo-banksia-solar-farm","name":"Banksia Solar Farm","asset_class":"solar","technology":"Solar PV","developer":"Venn Energy Pty / Banksia Solar Project Pty Ltd","mw":70.4,"state":"QLD","country":"Australia","stage":"committed","cod":"2027-12-16","source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","jurisdiction":"AU-QLD"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information","publisher":"AEMO","fetched_at":"2026-10-05T00:28:16.697779+00:00","confidence":"high"},{"entity_id":"act-home-energy-support","record_type":"rebate_scheme","jurisdiction":"AU-ACT","data":{"id":"act-home-energy-support","name":"Home Energy Support Program","jurisdiction":"AU-ACT","applies_in":["ACT"],"rebate_type":"solar_pv","status":"active","headline":"50% of supply+install up to $2,500 for rooftop solar (up to $5,000 total across products)","requires":"Owner-occupier holding a Pensioner Concession / DVA Gold / Health Care Card","stacks_with":["act-sustainable-household-scheme"]},"source_url":"https://www.climatechoices.act.gov.au/policy-programs/home-energy-support-rebates-for-homeowners","publisher":"ACT Government","fetched_at":"2026-08-30T10:16:53.591650+00:00","confidence":"high"},{"entity_id":"act-sustainable-household-scheme","record_type":"rebate_scheme","jurisdiction":"AU-ACT","data":{"id":"act-sustainable-household-scheme","name":"Sustainable Household Scheme","jurisdiction":"AU-ACT","applies_in":["ACT"],"rebate_type":"loan","status":"active","mechanism":"Low-interest loan (not interest-free for general households)","headline":"Loan up to $20,000 at 3% interest (zero-interest up to $10,000 for concession holders)","requires":"ACT homeowner; batteries / heat pumps / induction / EV — NOT rooftop solar","amount":"Up to $20,000 at 3% p.a., up to 10-yr term, no fees (raised from $15k on 2026-07-01)","stacks_with":[]},"source_url":"https://www.climatechoices.act.gov.au/policy-programs/sustainable-household-scheme","publisher":"ACT Government","fetched_at":"2026-08-30T10:16:53.578687+00:00","confidence":"high"},{"entity_id":"federal-cheaper-home-batteries","record_type":"rebate_scheme","jurisdiction":"AU-federal","data":{"id":"au-federal-cheaper-home-batteries","name":"Cheaper Home Batteries Program","jurisdiction":"AU-federal","applies_in":["NSW"],"rebate_type":"battery","status":"active","mechanism":"STCs, point-of-sale discount","headline":"~30% off an eligible battery","rate":{"stc_per_kwh":6.8,"effective_from":"2026-05-01"},"size_kwh":{"min":5,"max":100,"stc_capped_at":50},"capacity_tiers":{"0_14kWh":"100%","14_28kWh":"60%","28_50kWh":"15%"},"requires":"Paired with solar PV","stacks_with":["nsw-vpp-connection-incentive"]},"source_url":"https://cer.gov.au/batteries","publisher":"Clean Energy Regulator","fetched_at":"2026-08-30T10:16:53.495649+00:00","confidence":"high"},{"entity_id":"federal-stc-solar","record_type":"rebate_scheme","jurisdiction":"AU-federal","data":{"id":"au-federal-stc-solar","name":"Small-scale certificates (solar PV)","jurisdiction":"AU-federal","applies_in":["NSW"],"rebate_type":"solar_pv","status":"active","mechanism":"STCs by system size; upfront discount","headline":"Upfront discount on solar panels","stacks_with":[]},"source_url":"https://cer.gov.au","publisher":"Clean Energy Regulator","fetched_at":"2026-08-30T10:16:53.510022+00:00","confidence":"high"},{"entity_id":"nsw-battery-incentives","record_type":"rebate_scheme","jurisdiction":"AU-NSW","data":{"id":"nsw-standalone-battery-install-rebate","name":"NSW battery installation incentive","jurisdiction":"AU-NSW","applies_in":["NSW"],"rebate_type":"battery","status":"ended","stacks_with":[],"effective_to":"2025-07-01","ended_reason":"Replaced by the federal Cheaper Home Batteries Program."},"source_url":"https://www.energy.nsw.gov.au/households/rebates-grants-and-schemes/household-energy-saving-upgrades/incentives-residential","publisher":"NSW Climate & Energy Action","fetched_at":"2026-08-30T10:16:53.470584+00:00","confidence":"high"},{"entity_id":"nsw-vpp-incentive","record_type":"rebate_scheme","jurisdiction":"AU-NSW","data":{"id":"nsw-vpp-connection-incentive","name":"NSW VPP connection incentive","jurisdiction":"AU-NSW","applies_in":["NSW"],"rebate_type":"battery_vpp","status":"active","mechanism":"Peak Reduction Certificates (PRCs)","amount":"Provider- and capacity-dependent; dollar value not on the landing page.","stacks_with":["au-federal-cheaper-home-batteries"]},"source_url":"https://www.energy.nsw.gov.au/households/grants-rebates/household-energy-saving-upgrades/virtual-power-plant-vpp-incentive","publisher":"NSW Climate & Energy Action","fetched_at":"2026-08-30T10:16:53.484619+00:00","confidence":"high"},{"entity_id":"nt-home-business-battery-scheme","record_type":"rebate_scheme","jurisdiction":"AU-NT","data":{"id":"nt-home-business-battery-scheme","name":"Home and Business Battery Scheme","jurisdiction":"AU-NT","applies_in":["NT"],"rebate_type":"battery_vpp","status":"ended","amount":"(was) $400 per kWh usable, max $12,000","stacks_with":[],"ended_reason":"Currently closed to applications ($6M allocated); NT households rely on the federal program — still advertised as claimable by secondary sites"},"source_url":"https://nt.gov.au/industry/business-grants-funding/home-and-business-battery-scheme","publisher":"Northern Territory Government","fetched_at":"2026-08-30T10:16:53.601901+00:00","confidence":"high"},{"entity_id":"qld-battery-booster","record_type":"rebate_scheme","jurisdiction":"AU-QLD","data":{"id":"qld-battery-booster","name":"Battery Booster Rebate","jurisdiction":"AU-QLD","applies_in":["QLD"],"rebate_type":"battery","status":"ended","amount":"(was) up to $4,000 for an approved home battery","stacks_with":[],"effective_to":"2024-05-08","ended_reason":"Funding fully allocated; no current QLD state rebate — households use the federal program"},"source_url":"https://www.qld.gov.au/housing/home-modifications-energy-savings/battery-booster-program","publisher":"Queensland Government","fetched_at":"2026-08-30T10:16:53.540422+00:00","confidence":"high"},{"entity_id":"sa-home-battery-scheme","record_type":"rebate_scheme","jurisdiction":"AU-SA","data":{"id":"sa-home-battery-scheme","name":"Home Battery Scheme","jurisdiction":"AU-SA","applies_in":["SA"],"rebate_type":"battery","status":"ended","stacks_with":[],"effective_to":"2022-09-01","ended_reason":"Closed to new applications; SA has no current state household battery/solar rebate"},"source_url":"https://energymining.sa.gov.au/consumers/hbs-closed","publisher":"SA Dept for Energy and Mining","fetched_at":"2026-08-30T10:16:53.553755+00:00","confidence":"high"},{"entity_id":"tas-energy-saver-loan","record_type":"rebate_scheme","jurisdiction":"AU-TAS","data":{"id":"tas-energy-saver-loan","name":"Energy Saver Loan Scheme","jurisdiction":"AU-TAS","applies_in":["TAS"],"rebate_type":"loan","status":"ended","amount":"(was) interest-free loan $500-$10,000","stacks_with":[],"ended_reason":"Funding exhausted (~$62M / 7,500 loans); closed to new applications — still marketed as open by some installers"},"source_url":"https://www.recfit.tas.gov.au/grants_programs/energy-efficiency/energy_saver_loan_scheme","publisher":"ReCFIT (Tasmania)","fetched_at":"2026-08-30T10:16:53.570346+00:00","confidence":"medium"},{"entity_id":"vic-solar-battery-loan","record_type":"rebate_scheme","jurisdiction":"AU-VIC","data":{"id":"vic-solar-battery-loan","name":"Solar Victoria interest-free solar battery loan","jurisdiction":"AU-VIC","applies_in":["VIC"],"rebate_type":"battery","status":"ended","stacks_with":[],"ended_reason":"No longer taking applications (targets met); redirects to the federal Cheaper Home Batteries Program"},"source_url":"https://www.solar.vic.gov.au/solar-battery-loan","publisher":"Solar Victoria","fetched_at":"2026-08-30T10:16:53.530640+00:00","confidence":"high"},{"entity_id":"vic-solar-pv-rebate","record_type":"rebate_scheme","jurisdiction":"AU-VIC","data":{"id":"vic-solar-pv-rebate","name":"Solar Homes — Solar panel (PV) rebate","jurisdiction":"AU-VIC","applies_in":["VIC"],"rebate_type":"solar_pv","status":"active","mechanism":"Point-of-sale rebate via Solar Victoria","headline":"Up to $1,400 rebate + optional interest-free loan up to $1,400","requires":"Authorised retailer + eligible products; household income <= $150,000/yr (cut from $210k on 2026-07-01)","stacks_with":[]},"source_url":"https://www.solar.vic.gov.au/solar-panel-rebate","publisher":"Solar Victoria","fetched_at":"2026-08-30T10:16:53.519485+00:00","confidence":"high"},{"entity_id":"wa-residential-battery-scheme","record_type":"rebate_scheme","jurisdiction":"AU-WA","data":{"id":"wa-residential-battery-scheme","name":"WA Residential Battery Scheme","jurisdiction":"AU-WA","applies_in":["WA"],"rebate_type":"battery_vpp","status":"active","headline":"State rebate up to $1,300 (Synergy) / $3,800 (Horizon) for a 10 kWh battery + interest-free loan up to $10,000","requires":"Mandatory VPP participation; battery >= 5 kWh usable; installed on/after 2025-07-01","amount":"State-only rebate $1,300 (Synergy) / $3,800 (Horizon) — NOT the $5,000/$7,500 combined-with-federal figure","stacks_with":["au-federal-cheaper-home-batteries"],"effective_from":"2025-07-01"},"source_url":"https://www.wa.gov.au/organisation/energy-policy-wa/wa-residential-battery-scheme","publisher":"Energy Policy WA","fetched_at":"2026-08-30T10:16:53.561975+00:00","confidence":"high"},{"entity_id":"signal-0082a6bb7c46","record_type":"signal","jurisdiction":"AE","data":{"id":"signal-0082a6bb7c46","title":"Masdar agrees to develop 200 MWh BESS, 100 MW ’round-the-clock’ power project in Azerbaijan","link":"https://www.ess-news.com/2026/09/16/masdar-agrees-to-develop-200-mwh-bess-100-mw-round-the-clock-power-project-in-azerbaijan/","publisher":"ESS News","published":"2026-09-16","kind":"other","country":"Middle East","jurisdiction":"AE","source":"https://www.ess-news.com/2026/09/16/masdar-agrees-to-develop-200-mwh-bess-100-mw-round-the-clock-power-project-in-azerbaijan/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-16T21:23:18.522795+00:00","confidence":"low"},{"entity_id":"signal-026aa1a176de","record_type":"signal","jurisdiction":"GB","data":{"id":"signal-026aa1a176de","title":"UK regulator plans BESS fees to cut grid connection queue","link":"https://www.pv-magazine-india.com/2026/09/23/uk-regulator-plans-bess-fees-to-cut-grid-connection-queue/","publisher":"pv magazine India","published":"2026-09-23","kind":"tender","country":"United Kingdom","jurisdiction":"GB","source":"https://www.pv-magazine-india.com/2026/09/23/uk-regulator-plans-bess-fees-to-cut-grid-connection-queue/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-24T03:20:20.361842+00:00","confidence":"low"},{"entity_id":"signal-0329e949f04f","record_type":"signal","jurisdiction":"AU","data":{"id":"signal-0329e949f04f","title":"Biggest ever battery project – up to 4,800 megawatt hours – seeks federal and state planning approvals","link":"https://reneweconomy.com.au/what-could-be-australias-biggest-battery-project-seeks-federal-and-state-planning-approvals/?utm_source=rss&utm_medium=rss&utm_campaign=what-could-be-australias-biggest-battery-project-seeks-federal-and-state-planning-approvals","publisher":"RenewEconomy","published":"2026-09-07","kind":"tender","country":"Australia","jurisdiction":"AU","source":"https://reneweconomy.com.au/what-could-be-australias-biggest-battery-project-seeks-federal-and-state-planning-approvals/?utm_source=rss&utm_medium=rss&utm_campaign=what-could-be-australias-biggest-battery-project-seeks-federal-and-state-planning-approvals"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-07T16:49:27.225882+00:00","confidence":"low"},{"entity_id":"signal-036256e3bf2b","record_type":"signal","jurisdiction":"AU","data":{"id":"signal-036256e3bf2b","title":"Aula Energy plans 1.8 GWh battery to ‘optimise’ 330 MW solar farm","link":"https://www.pv-magazine-australia.com/2026/10/06/aula-energy-plans-1-8-gwh-battery-to-optimise-330-mw-solar-farm/","publisher":"pv magazine Australia","published":"2026-10-06","kind":"tender","country":"Australia","jurisdiction":"AU","source":"https://www.pv-magazine-australia.com/2026/10/06/aula-energy-plans-1-8-gwh-battery-to-optimise-330-mw-solar-farm/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-10-07T17:20:19.284645+00:00","confidence":"low"},{"entity_id":"signal-038730c8eef3","record_type":"signal","jurisdiction":"ES","data":{"id":"signal-038730c8eef3","title":"Tera Batteries nears completion of southern Europe’s largest grid battery","link":"https://www.ess-news.com/2026/09/18/tera-batteries-nears-completion-of-southern-europes-largest-grid-battery/","publisher":"ESS News","published":"2026-09-18","kind":"commissioning","country":"Spain","jurisdiction":"ES","source":"https://www.ess-news.com/2026/09/18/tera-batteries-nears-completion-of-southern-europes-largest-grid-battery/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-21T00:20:14.076736+00:00","confidence":"low"},{"entity_id":"signal-05491990c184","record_type":"signal","jurisdiction":"EU","data":{"id":"signal-05491990c184","title":"EU approves German capacity mechanism","link":"https://www.ess-news.com/2026/09/02/eu-approves-german-capacity-mechanism/","publisher":"ESS News","published":"2026-09-02","kind":"tender","country":"Europe","jurisdiction":"EU","source":"https://www.ess-news.com/2026/09/02/eu-approves-german-capacity-mechanism/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-02T23:46:01.374147+00:00","confidence":"low"},{"entity_id":"signal-061f222e1292","record_type":"signal","jurisdiction":"ES","data":{"id":"signal-061f222e1292","title":"Spanish giant withdraws 2,000 MWh battery project after being “called in” by LNP planning minister","link":"https://reneweconomy.com.au/spanish-giant-withdraws-2000-mwh-battery-project-after-being-called-in-by-lnp-planning-minister/?utm_source=rss&utm_medium=rss&utm_campaign=spanish-giant-withdraws-2000-mwh-battery-project-after-being-called-in-by-lnp-planning-minister","publisher":"RenewEconomy","published":"2026-09-10","kind":"other","country":"Spain","jurisdiction":"ES","source":"https://reneweconomy.com.au/spanish-giant-withdraws-2000-mwh-battery-project-after-being-called-in-by-lnp-planning-minister/?utm_source=rss&utm_medium=rss&utm_campaign=spanish-giant-withdraws-2000-mwh-battery-project-after-being-called-in-by-lnp-planning-minister"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-11T04:20:18.160074+00:00","confidence":"low"},{"entity_id":"signal-069434357968","record_type":"signal","jurisdiction":"IN","data":{"id":"signal-069434357968","title":"Ayana Seeks Partner for 2.5 GWh Battery Cell Manufacturing Facility","link":"https://www.mercomindia.com/ayana-seeks-partner-for-2-5-gwh-battery-cell-manufacturing-facility","publisher":"Mercom India","published":"2026-09-22","kind":"award","country":"India","jurisdiction":"IN","source":"https://www.mercomindia.com/ayana-seeks-partner-for-2-5-gwh-battery-cell-manufacturing-facility"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-23T02:20:14.775948+00:00","confidence":"low"},{"entity_id":"signal-06a2e20c5dfd","record_type":"signal","jurisdiction":"GLOBAL","data":{"id":"signal-06a2e20c5dfd","title":"CATL targets opportunities in Brazil’s capacity reserve auction, as regulator receives nearly 300GW of bids","link":"https://www.energy-storage.news/catl-targets-opportunities-in-brazils-capacity-reserve-auction-as-regulator-receives-nearly-300gw-of-bids/","publisher":"Energy-Storage.news","published":"2026-08-31","kind":"award","country":"Global","jurisdiction":"GLOBAL","source":"https://www.energy-storage.news/catl-targets-opportunities-in-brazils-capacity-reserve-auction-as-regulator-receives-nearly-300gw-of-bids/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-10-11T22:20:49.029975+00:00","confidence":"low"},{"entity_id":"signal-0943e8eeb402","record_type":"signal","jurisdiction":"EU","data":{"id":"signal-0943e8eeb402","title":"GIGA Storage advances 350 MW / 1.4 GWh Albatross project in Lower Saxony to construction-ready stage","link":"https://www.ess-news.com/2026/10/02/giga-storage-advances-350-mw-1-4-gwh-albatross-project-in-lower-saxony-to-construction-ready-stage/","publisher":"ESS News","published":"2026-10-02","kind":"other","country":"Europe","jurisdiction":"EU","source":"https://www.ess-news.com/2026/10/02/giga-storage-advances-350-mw-1-4-gwh-albatross-project-in-lower-saxony-to-construction-ready-stage/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-10-04T14:24:20.164576+00:00","confidence":"low"},{"entity_id":"signal-0a80e2964ca1","record_type":"signal","jurisdiction":"AU","data":{"id":"signal-0a80e2964ca1","title":"Australia’s NSW firming tender delivers 3GWh of battery storage as all Round 2 projects go operational","link":"https://www.energy-storage.news/australias-nsw-firming-tender-delivers-3gwh-of-battery-storage-as-all-round-2-projects-go-operational/","publisher":"Energy-Storage.news","published":"2026-09-18","kind":"tender","country":"Australia","jurisdiction":"AU","source":"https://www.energy-storage.news/australias-nsw-firming-tender-delivers-3gwh-of-battery-storage-as-all-round-2-projects-go-operational/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-10-11T22:20:49.029975+00:00","confidence":"low"},{"entity_id":"signal-0c4638fbb997","record_type":"signal","jurisdiction":"IN","data":{"id":"signal-0c4638fbb997","title":"Premier Energies, RCT India Plan 12 GWh Battery Storage Unit in Telangana","link":"https://www.mercomindia.com/premier-energies-rct-india-plan-12-gwh-battery-storage-unit-in-telangana","publisher":"Mercom India","published":"2026-09-11","kind":"other","country":"India","jurisdiction":"IN","source":"https://www.mercomindia.com/premier-energies-rct-india-plan-12-gwh-battery-storage-unit-in-telangana"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-14T16:34:33.633301+00:00","confidence":"low"},{"entity_id":"signal-0c66c21269f3","record_type":"signal","jurisdiction":"AU","data":{"id":"signal-0c66c21269f3","title":"Biggest wind farm in two years reaches financial close, the ninth in last 12 months, and a new big battery","link":"https://reneweconomy.com.au/biggest-wind-farm-in-two-years-reaches-financial-close-the-ninth-in-last-12-months/?utm_source=rss&utm_medium=rss&utm_campaign=biggest-wind-farm-in-two-years-reaches-financial-close-the-ninth-in-last-12-months","publisher":"RenewEconomy","published":"2026-10-02","kind":"other","country":"Australia","jurisdiction":"AU","source":"https://reneweconomy.com.au/biggest-wind-farm-in-two-years-reaches-financial-close-the-ninth-in-last-12-months/?utm_source=rss&utm_medium=rss&utm_campaign=biggest-wind-farm-in-two-years-reaches-financial-close-the-ninth-in-last-12-months"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-10-04T14:24:20.164576+00:00","confidence":"low"},{"entity_id":"signal-0f230fea3f17","record_type":"signal","jurisdiction":"DE","data":{"id":"signal-0f230fea3f17","title":"German startup wins grant for grid-charging sodium-ion home battery","link":"https://www.pv-magazine-india.com/2026/10/05/german-startup-wins-grant-for-grid-charging-sodium-ion-home-battery/","publisher":"pv magazine India","published":"2026-10-05","kind":"award","country":"Germany","jurisdiction":"DE","source":"https://www.pv-magazine-india.com/2026/10/05/german-startup-wins-grant-for-grid-charging-sodium-ion-home-battery/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-10-06T16:20:14.201246+00:00","confidence":"low"},{"entity_id":"signal-109a75ff2b1d","record_type":"signal","jurisdiction":"AU","data":{"id":"signal-109a75ff2b1d","title":"Hithium launches 4 MWh sodium-ion BESS with new 785Ah cell","link":"https://www.pv-magazine-australia.com/2026/09/17/hithium-launches-4-mwh-sodium-ion-bess-with-new-785ah-cell/","publisher":"pv magazine Australia","published":"2026-09-16","kind":"other","country":"Australia","jurisdiction":"AU","source":"https://www.pv-magazine-australia.com/2026/09/17/hithium-launches-4-mwh-sodium-ion-bess-with-new-785ah-cell/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-21T00:20:14.076736+00:00","confidence":"low"},{"entity_id":"signal-1145bbc43b94","record_type":"signal","jurisdiction":"IN","data":{"id":"signal-1145bbc43b94","title":"SECI Seeks 100 MWh Standalone Storage for Short-Term Use","link":"https://www.mercomindia.com/seci-seeks-100-mwh-standalone-storage-for-short-term-use","publisher":"Mercom India","published":"2026-08-28","kind":"tender","country":"India","jurisdiction":"IN","source":"https://www.mercomindia.com/seci-seeks-100-mwh-standalone-storage-for-short-term-use"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-08-31T02:38:44.295914+00:00","confidence":"low"},{"entity_id":"signal-125e97f2ea27","record_type":"signal","jurisdiction":"GLOBAL","data":{"id":"signal-125e97f2ea27","title":"Axpo and energieUri commission Switzerland’s largest operational BESS facility","link":"https://www.energy-storage.news/axpo-and-energieuri-commission-switzerlands-largest-operational-bess-facility/","publisher":"Energy-Storage.news","published":"2026-09-11","kind":"commissioning","country":"Global","jurisdiction":"GLOBAL","source":"https://www.energy-storage.news/axpo-and-energieuri-commission-switzerlands-largest-operational-bess-facility/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-10-11T22:20:49.029975+00:00","confidence":"low"},{"entity_id":"signal-13bdc184c9b1","record_type":"signal","jurisdiction":"US","data":{"id":"signal-13bdc184c9b1","title":"Inside the six-week commissioning of a 160 MW Texas battery","link":"https://www.ess-news.com/2026/10/06/inside-the-six-week-commissioning-of-a-160-mw-texas-battery/","publisher":"ESS News","published":"2026-10-06","kind":"commissioning","country":"United States","jurisdiction":"US","source":"https://www.ess-news.com/2026/10/06/inside-the-six-week-commissioning-of-a-160-mw-texas-battery/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-10-06T16:20:14.201246+00:00","confidence":"low"},{"entity_id":"signal-1560d79d00ce","record_type":"signal","jurisdiction":"GLOBAL","data":{"id":"signal-1560d79d00ce","title":"Brazil allocates $860 million for batteries under investment program","link":"https://www.ess-news.com/2026/10/09/brazil-allocates-860-million-for-batteries-under-eco-invest-program/","publisher":"ESS News","published":"2026-10-09","kind":"tender","country":"Global","jurisdiction":"GLOBAL","source":"https://www.ess-news.com/2026/10/09/brazil-allocates-860-million-for-batteries-under-eco-invest-program/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-10-11T22:20:49.029975+00:00","confidence":"low"},{"entity_id":"signal-158ac66ced22","record_type":"signal","jurisdiction":"GLOBAL","data":{"id":"signal-158ac66ced22","title":"Renalfa and Eurowind Energy inaugurate 773 MWh double-battery hybrid park","link":"https://www.ess-news.com/2026/10/05/renalfa-and-eurowind-energy-inaugurate-773-mwh-double-battery-hybrid-park/","publisher":"ESS News","published":"2026-10-05","kind":"other","country":"Global","jurisdiction":"GLOBAL","source":"https://www.ess-news.com/2026/10/05/renalfa-and-eurowind-energy-inaugurate-773-mwh-double-battery-hybrid-park/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-10-05T15:20:15.080739+00:00","confidence":"low"},{"entity_id":"signal-15d5ef6fe229","record_type":"signal","jurisdiction":"GLOBAL","data":{"id":"signal-15d5ef6fe229","title":"Brazil hits 56 GW of connection headroom for battery auctions","link":"https://www.ess-news.com/2026/10/02/brazil-hits-56-gw-of-connection-headroom-for-battery-auctions/","publisher":"ESS News","published":"2026-10-02","kind":"analysis","country":"Global","jurisdiction":"GLOBAL","source":"https://www.ess-news.com/2026/10/02/brazil-hits-56-gw-of-connection-headroom-for-battery-auctions/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-10-04T14:24:20.164576+00:00","confidence":"low"},{"entity_id":"signal-1638384a0be2","record_type":"signal","jurisdiction":"IN","data":{"id":"signal-1638384a0be2","title":"Trentar signs INR 30,000 crore MoU for 500 MW green data center in Maharashtra","link":"https://www.pv-magazine-india.com/2026/10/06/trentar-signs-inr-30000-crore-mou-for-500-mw-green-data-center-in-maharashtra/","publisher":"pv magazine India","published":"2026-10-06","kind":"contract","country":"India","jurisdiction":"IN","source":"https://www.pv-magazine-india.com/2026/10/06/trentar-signs-inr-30000-crore-mou-for-500-mw-green-data-center-in-maharashtra/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-10-06T16:20:14.201246+00:00","confidence":"low"},{"entity_id":"signal-18a9bafed351","record_type":"signal","jurisdiction":"IN","data":{"id":"signal-18a9bafed351","title":"Bihar Proposes Storage-Linked Renewable Purchase Obligation Targets","link":"https://www.mercomindia.com/bihar-proposes-storage-linked-renewable-purchase-obligation-targets","publisher":"Mercom India","published":"2026-09-18","kind":"commissioning","country":"India","jurisdiction":"IN","source":"https://www.mercomindia.com/bihar-proposes-storage-linked-renewable-purchase-obligation-targets"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-21T00:20:14.076736+00:00","confidence":"low"},{"entity_id":"signal-19ddf6c8807b","record_type":"signal","jurisdiction":"GB","data":{"id":"signal-19ddf6c8807b","title":"Eelpower acquires 50 MW/200 MWh battery storage project in UK","link":"https://www.ess-news.com/2026/09/04/eelpower-energy-acquires-uk-bess-project/","publisher":"ESS News","published":"2026-09-04","kind":"other","country":"United Kingdom","jurisdiction":"GB","source":"https://www.ess-news.com/2026/09/04/eelpower-energy-acquires-uk-bess-project/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-06T14:20:17.852788+00:00","confidence":"low"},{"entity_id":"signal-19e586aae91c","record_type":"signal","jurisdiction":"AU","data":{"id":"signal-19e586aae91c","title":"EPEC Group lands grid connection contract for 843MWh solar-plus-storage site in Queensland, Australia","link":"https://www.energy-storage.news/epec-group-lands-grid-connection-contract-for-843mwh-solar-plus-storage-site-in-queensland-australia/","publisher":"Energy-Storage.news","published":"2026-08-12","kind":"award","country":"Australia","jurisdiction":"AU","source":"https://www.energy-storage.news/epec-group-lands-grid-connection-contract-for-843mwh-solar-plus-storage-site-in-queensland-australia/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-10-07T17:20:19.284645+00:00","confidence":"low"},{"entity_id":"signal-1f3b49c5b58d","record_type":"signal","jurisdiction":"AU","data":{"id":"signal-1f3b49c5b58d","title":"UGL bags EPC job on APA’s Sybella solar and 104 MWh battery project in Australia","link":"https://www.ess-news.com/2026/09/14/ugl-bags-epc-job-on-apas-sybella-solar-and-104-mwh-battery-project-in-australia/","publisher":"ESS News","published":"2026-09-14","kind":"other","country":"Australia","jurisdiction":"AU","source":"https://www.ess-news.com/2026/09/14/ugl-bags-epc-job-on-apas-sybella-solar-and-104-mwh-battery-project-in-australia/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-14T16:34:33.633301+00:00","confidence":"low"},{"entity_id":"signal-20a43953de30","record_type":"signal","jurisdiction":"SA","data":{"id":"signal-20a43953de30","title":"Gotion to supply 6GWh of battery storage for Saudi Arabia’s first utility-scale BESS tender","link":"https://www.energy-storage.news/gotion-to-supply-6gwh-of-battery-storage-for-saudi-arabias-first-utility-scale-bess-tender/","publisher":"Energy-Storage.news","published":"2026-09-30","kind":"award","country":"Saudi Arabia","jurisdiction":"SA","source":"https://www.energy-storage.news/gotion-to-supply-6gwh-of-battery-storage-for-saudi-arabias-first-utility-scale-bess-tender/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-10-11T22:20:49.029975+00:00","confidence":"low"},{"entity_id":"signal-2223d56c39bd","record_type":"signal","jurisdiction":"EU","data":{"id":"signal-2223d56c39bd","title":"Quick roundup: 265 MWh comes online in Netherlands, Lithuania","link":"https://www.ess-news.com/2026/10/07/quick-roundup-265-mwh-comes-online-in-netherlands-lithuania/","publisher":"ESS News","published":"2026-10-07","kind":"other","country":"Europe","jurisdiction":"EU","source":"https://www.ess-news.com/2026/10/07/quick-roundup-265-mwh-comes-online-in-netherlands-lithuania/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-10-07T17:20:19.284645+00:00","confidence":"low"},{"entity_id":"signal-2249527f094a","record_type":"signal","jurisdiction":"IN","data":{"id":"signal-2249527f094a","title":"Pace Digitek arm secures INR 488.46 crore BESS order from NTPC GE Power Services","link":"https://www.pv-magazine-india.com/2026/09/22/pace-digitek-arm-secures-inr-488-46-crore-bess-order-from-ntpc-ge-power-services/","publisher":"pv magazine India","published":"2026-09-22","kind":"commissioning","country":"India","jurisdiction":"IN","source":"https://www.pv-magazine-india.com/2026/09/22/pace-digitek-arm-secures-inr-488-46-crore-bess-order-from-ntpc-ge-power-services/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-24T03:20:20.361842+00:00","confidence":"low"},{"entity_id":"signal-2275183d4a1b","record_type":"signal","jurisdiction":"CL","data":{"id":"signal-2275183d4a1b","title":"Metlen sells 725 MWh BESS project in Chile to Copec","link":"https://www.ess-news.com/2026/09/11/metlen-sells-1725-mwh-bess-project-in-chile-to-copec/","publisher":"ESS News","published":"2026-09-11","kind":"other","country":"Chile","jurisdiction":"CL","source":"https://www.ess-news.com/2026/09/11/metlen-sells-1725-mwh-bess-project-in-chile-to-copec/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-13T15:20:26.017504+00:00","confidence":"low"},{"entity_id":"signal-22b626127233","record_type":"signal","jurisdiction":"IN","data":{"id":"signal-22b626127233","title":"India flow battery player Delectrik talks 100MWh NTPC project award, targets gigawatt-hour order book","link":"https://www.energy-storage.news/india-flow-battery-player-delectrik-talks-100mwh-ntpc-project-award-targets-gigawatt-hour-order-book/","publisher":"Energy-Storage.news","published":"2026-09-21","kind":"award","country":"India","jurisdiction":"IN","source":"https://www.energy-storage.news/india-flow-battery-player-delectrik-talks-100mwh-ntpc-project-award-targets-gigawatt-hour-order-book/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-10-11T22:20:49.029975+00:00","confidence":"low"},{"entity_id":"signal-22ee653f0f48","record_type":"signal","jurisdiction":"US","data":{"id":"signal-22ee653f0f48","title":"Lightshift selects FlexGen EMS for 285 MWh BESS portfolio across PJM and ISO-NE","link":"https://www.ess-news.com/2026/09/17/lightshift-selects-flexgen-ems-for-285-mwh-bess-portfolio-across-pjm-and-iso-ne/","publisher":"ESS News","published":"2026-09-17","kind":"award","country":"United States","jurisdiction":"US","source":"https://www.ess-news.com/2026/09/17/lightshift-selects-flexgen-ems-for-285-mwh-bess-portfolio-across-pjm-and-iso-ne/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-17T22:20:29.692035+00:00","confidence":"low"},{"entity_id":"signal-23360a728b2d","record_type":"signal","jurisdiction":"GLOBAL","data":{"id":"signal-23360a728b2d","title":"Econergy signs financing agreements for 150MW solar-plus-storage project in Romania","link":"https://www.energy-storage.news/econergy-signs-financing-agreements-for-150mw-solar-plus-storage-project-in-romania/","publisher":"Energy-Storage.news","published":"2026-08-17","kind":"contract","country":"Global","jurisdiction":"GLOBAL","source":"https://www.energy-storage.news/econergy-signs-financing-agreements-for-150mw-solar-plus-storage-project-in-romania/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-10-11T22:20:49.029975+00:00","confidence":"low"},{"entity_id":"signal-24523121e022","record_type":"signal","jurisdiction":"GB","data":{"id":"signal-24523121e022","title":"Metlen scales BESS across UK, Italy, Greece and Central and Eastern Europe","link":"https://www.ess-news.com/2026/08/28/metlen-scales-bess-across-uk-italy-greece-and-cee/","publisher":"ESS News","published":"2026-08-28","kind":"contract","country":"United Kingdom","jurisdiction":"GB","source":"https://www.ess-news.com/2026/08/28/metlen-scales-bess-across-uk-italy-greece-and-cee/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-08-31T02:38:44.295914+00:00","confidence":"low"},{"entity_id":"signal-2486470d5dd9","record_type":"signal","jurisdiction":"AU","data":{"id":"signal-2486470d5dd9","title":"Rooftop solar, home battery installs hit record highs","link":"https://www.pv-magazine-australia.com/2026/09/29/rooftop-solar-home-battery-installs-hit-record-highs/","publisher":"pv magazine Australia","published":"2026-09-29","kind":"other","country":"Australia","jurisdiction":"AU","source":"https://www.pv-magazine-australia.com/2026/09/29/rooftop-solar-home-battery-installs-hit-record-highs/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-29T08:20:38.927921+00:00","confidence":"low"},{"entity_id":"signal-258bfd882e98","record_type":"signal","jurisdiction":"IN","data":{"id":"signal-258bfd882e98","title":"GMIDC Invites Bids to Upgrade 12 MW Jayakwadi Pumped Storage Project","link":"https://www.mercomindia.com/gmidc-invites-bids-to-upgrade-12-mw-jayakwadi-pumped-storage-project","publisher":"Mercom India","published":"2026-09-01","kind":"tender","country":"India","jurisdiction":"IN","source":"https://www.mercomindia.com/gmidc-invites-bids-to-upgrade-12-mw-jayakwadi-pumped-storage-project"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-01T20:44:47.275051+00:00","confidence":"low"},{"entity_id":"signal-25c20fb8f0a7","record_type":"signal","jurisdiction":"JP","data":{"id":"signal-25c20fb8f0a7","title":"Trina signs 1GWh MoU to help developer meet ‘unique technical and delivery requirements’ of Japan’s battery storage market","link":"https://www.energy-storage.news/trina-signs-1gwh-mou-to-help-developer-meet-unique-technical-and-delivery-requirements-of-japans-battery-storage-market/","publisher":"Energy-Storage.news","published":"2026-09-14","kind":"contract","country":"Japan","jurisdiction":"JP","source":"https://www.energy-storage.news/trina-signs-1gwh-mou-to-help-developer-meet-unique-technical-and-delivery-requirements-of-japans-battery-storage-market/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-10-11T22:20:49.029975+00:00","confidence":"low"},{"entity_id":"signal-26358d6be7d0","record_type":"signal","jurisdiction":"GLOBAL","data":{"id":"signal-26358d6be7d0","title":"INTERVIEW: Hithium’s sodium-ion storage push, where it could win, where it won’t, and path to bankability","link":"https://www.ess-news.com/2026/10/06/interview-hithiums-sodium-ion-storage-push-where-it-could-win-where-it-wont-and-path-to-bankability/","publisher":"ESS News","published":"2026-10-06","kind":"award","country":"Global","jurisdiction":"GLOBAL","source":"https://www.ess-news.com/2026/10/06/interview-hithiums-sodium-ion-storage-push-where-it-could-win-where-it-wont-and-path-to-bankability/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-10-06T16:20:14.201246+00:00","confidence":"low"},{"entity_id":"signal-27d1397e25b1","record_type":"signal","jurisdiction":"IN","data":{"id":"signal-27d1397e25b1","title":"India adds 8.2 GWh of new BESS capacity in H1 2026","link":"https://www.pv-magazine-india.com/2026/09/14/india-adds-8-2-gwh-of-new-bess-capacity-in-h1-2026/","publisher":"pv magazine India","published":"2026-09-14","kind":"analysis","country":"India","jurisdiction":"IN","source":"https://www.pv-magazine-india.com/2026/09/14/india-adds-8-2-gwh-of-new-bess-capacity-in-h1-2026/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-15T17:20:21.452016+00:00","confidence":"low"},{"entity_id":"signal-27d56806ff91","record_type":"signal","jurisdiction":"GLOBAL","data":{"id":"signal-27d56806ff91","title":"Nala Renewables starts construction on 250 MWh Finland BESS","link":"https://www.ess-news.com/2026/10/08/nala-renewables-starts-construction-on-250-mwh-finland-bess/","publisher":"ESS News","published":"2026-10-08","kind":"other","country":"Global","jurisdiction":"GLOBAL","source":"https://www.ess-news.com/2026/10/08/nala-renewables-starts-construction-on-250-mwh-finland-bess/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-10-08T18:20:17.067537+00:00","confidence":"low"},{"entity_id":"signal-295f54c831b0","record_type":"signal","jurisdiction":"AU","data":{"id":"signal-295f54c831b0","title":"Origin plans 4.9 GWh battery expansion in Australia","link":"https://www.ess-news.com/2026/10/06/origin-plans-4-9-gwh-battery-expansion-in-australia/","publisher":"ESS News","published":"2026-10-06","kind":"other","country":"Australia","jurisdiction":"AU","source":"https://www.ess-news.com/2026/10/06/origin-plans-4-9-gwh-battery-expansion-in-australia/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-10-06T16:20:14.201246+00:00","confidence":"low"},{"entity_id":"signal-2a3045f29b81","record_type":"signal","jurisdiction":"AU","data":{"id":"signal-2a3045f29b81","title":"New 2-stage BESS for Victoria to provide 1.4 GWh of capacity","link":"https://www.pv-magazine-australia.com/2026/09/18/new-2-stage-bess-for-victoria-to-provide-1-4-gwh-of-capacity/","publisher":"pv magazine Australia","published":"2026-09-18","kind":"other","country":"Australia","jurisdiction":"AU","source":"https://www.pv-magazine-australia.com/2026/09/18/new-2-stage-bess-for-victoria-to-provide-1-4-gwh-of-capacity/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-22T01:20:13.669467+00:00","confidence":"low"},{"entity_id":"signal-2b4afe264a4f","record_type":"signal","jurisdiction":"EU","data":{"id":"signal-2b4afe264a4f","title":"German startup wins grant for grid-charging sodium-ion home battery","link":"https://www.ess-news.com/2026/10/02/german-startup-wins-grant-for-grid-charging-sodium-ion-home-battery/","publisher":"ESS News","published":"2026-10-02","kind":"award","country":"Europe","jurisdiction":"EU","source":"https://www.ess-news.com/2026/10/02/german-startup-wins-grant-for-grid-charging-sodium-ion-home-battery/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-10-04T14:24:20.164576+00:00","confidence":"low"},{"entity_id":"signal-2b5bd418fa71","record_type":"signal","jurisdiction":"KR","data":{"id":"signal-2b5bd418fa71","title":"South Korean Power Exchange Invites Bids to Procure 6.6 GWh Storage Capacity","link":"https://www.mercomindia.com/south-korean-power-exchange-invites-bids-to-procure-6-6-gwh-storage-capacity","publisher":"Mercom India","published":"2026-09-25","kind":"tender","country":"South Korea","jurisdiction":"KR","source":"https://www.mercomindia.com/south-korean-power-exchange-invites-bids-to-procure-6-6-gwh-storage-capacity"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-28T07:40:40.572624+00:00","confidence":"low"},{"entity_id":"signal-2cc9fcdc2577","record_type":"signal","jurisdiction":"AU","data":{"id":"signal-2cc9fcdc2577","title":"Flow Power begins 223 MWh Australian battery, plans 1.2 GWh expansion","link":"https://www.ess-news.com/2026/09/18/flow-power-begins-223-mwh-australian-battery-plans-1-2-gwh-expansion/","publisher":"ESS News","published":"2026-09-18","kind":"other","country":"Australia","jurisdiction":"AU","source":"https://www.ess-news.com/2026/09/18/flow-power-begins-223-mwh-australian-battery-plans-1-2-gwh-expansion/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-21T00:20:14.076736+00:00","confidence":"low"},{"entity_id":"signal-2d1f9be55be2","record_type":"signal","jurisdiction":"ZA","data":{"id":"signal-2d1f9be55be2","title":"South Africa to procure 4.6 GW of battery storage","link":"https://www.ess-news.com/2026/10/09/south-africa-to-procure-4-6-gw-of-battery-storage/","publisher":"ESS News","published":"2026-10-09","kind":"tender","country":"South Africa","jurisdiction":"ZA","source":"https://www.ess-news.com/2026/10/09/south-africa-to-procure-4-6-gw-of-battery-storage/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-10-11T22:20:49.029975+00:00","confidence":"low"},{"entity_id":"signal-2d27db715a66","record_type":"signal","jurisdiction":"AU","data":{"id":"signal-2d27db715a66","title":"Renewables retailer doubles down on coal country battery plans as huge new BESS prepares to power up","link":"https://reneweconomy.com.au/renewables-retailer-doubles-down-on-coal-country-battery-plans-as-huge-new-bess-prepares-to-power-up/?utm_source=rss&utm_medium=rss&utm_campaign=renewables-retailer-doubles-down-on-coal-country-battery-plans-as-huge-new-bess-prepares-to-power-up","publisher":"RenewEconomy","published":"2026-09-21","kind":"commissioning","country":"Australia","jurisdiction":"AU","source":"https://reneweconomy.com.au/renewables-retailer-doubles-down-on-coal-country-battery-plans-as-huge-new-bess-prepares-to-power-up/?utm_source=rss&utm_medium=rss&utm_campaign=renewables-retailer-doubles-down-on-coal-country-battery-plans-as-huge-new-bess-prepares-to-power-up"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-22T01:20:13.669467+00:00","confidence":"low"},{"entity_id":"signal-2d3646613bdc","record_type":"signal","jurisdiction":"EU","data":{"id":"signal-2d3646613bdc","title":"Zhero and Tesla Energy sign agreement for 3 GWh of BESS in Italy","link":"https://www.ess-news.com/2026/09/10/zhero-and-tesla-energy-sign-agreement-for-3-gwh-of-bess-in-italy/","publisher":"ESS News","published":"2026-09-10","kind":"contract","country":"Europe","jurisdiction":"EU","source":"https://www.ess-news.com/2026/09/10/zhero-and-tesla-energy-sign-agreement-for-3-gwh-of-bess-in-italy/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-13T15:20:26.017504+00:00","confidence":"low"},{"entity_id":"signal-2fcb127c1d19","record_type":"signal","jurisdiction":"AU","data":{"id":"signal-2fcb127c1d19","title":"Australia home battery installs hit 966.5 MWh in September","link":"https://www.ess-news.com/2026/10/08/australia-home-battery-installs-hit-966-5-mwh-in-september/","publisher":"ESS News","published":"2026-10-08","kind":"other","country":"Australia","jurisdiction":"AU","source":"https://www.ess-news.com/2026/10/08/australia-home-battery-installs-hit-966-5-mwh-in-september/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-10-08T18:20:17.067537+00:00","confidence":"low"},{"entity_id":"signal-33a697acb9ac","record_type":"signal","jurisdiction":"SEA","data":{"id":"signal-33a697acb9ac","title":"Blueleaf, Universal Peak achieve financial close for 100 MW/400 MWh BESS project in Malaysia","link":"https://www.pv-magazine-india.com/2026/09/01/blueleaf-universal-peak-achieve-financial-close-for-100-mw-400-mwh-bess-project-in-malaysia/","publisher":"pv magazine India","published":"2026-09-01","kind":"other","country":"Southeast Asia","jurisdiction":"SEA","source":"https://www.pv-magazine-india.com/2026/09/01/blueleaf-universal-peak-achieve-financial-close-for-100-mw-400-mwh-bess-project-in-malaysia/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-01T20:44:47.275051+00:00","confidence":"low"},{"entity_id":"signal-34a4bad40f81","record_type":"signal","jurisdiction":"IN","data":{"id":"signal-34a4bad40f81","title":"TrueRE Oriana Power wins 900 MW/1,800 MWh BESS projects in Maharashtra","link":"https://www.pv-magazine-india.com/2026/09/21/truere-oriana-power-wins-900-mw-1800-mwh-bess-projects-in-maharashtra/","publisher":"pv magazine India","published":"2026-09-21","kind":"award","country":"India","jurisdiction":"IN","source":"https://www.pv-magazine-india.com/2026/09/21/truere-oriana-power-wins-900-mw-1800-mwh-bess-projects-in-maharashtra/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-23T02:20:14.775948+00:00","confidence":"low"},{"entity_id":"signal-34b70d4209b7","record_type":"signal","jurisdiction":"GB","data":{"id":"signal-34b70d4209b7","title":"EDF, Trinasolar sign long‑term optimization deals for UK BESS portfolio","link":"https://www.ess-news.com/2026/09/02/edf-trinasolar-sign-long-term-optimization-deals-for-uk-bess-portfolio/","publisher":"ESS News","published":"2026-09-02","kind":"contract","country":"United Kingdom","jurisdiction":"GB","source":"https://www.ess-news.com/2026/09/02/edf-trinasolar-sign-long-term-optimization-deals-for-uk-bess-portfolio/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-02T23:46:01.374147+00:00","confidence":"low"},{"entity_id":"signal-35935f91af5e","record_type":"signal","jurisdiction":"IN","data":{"id":"signal-35935f91af5e","title":"MSEDCL Invites Bids for Battery Energy Storage Systems","link":"https://www.mercomindia.com/msedcl-invites-bids-for-battery-energy-storage-systems","publisher":"Mercom India","published":"2026-09-25","kind":"tender","country":"India","jurisdiction":"IN","source":"https://www.mercomindia.com/msedcl-invites-bids-for-battery-energy-storage-systems"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-28T07:40:40.572624+00:00","confidence":"low"},{"entity_id":"signal-367ef14b0c54","record_type":"signal","jurisdiction":"AU","data":{"id":"signal-367ef14b0c54","title":"First stage BESS at Mortlake Energy Hub grows to 1,449 MWh as EPC deal signed","link":"https://www.ess-news.com/2026/09/28/first-stage-bess-at-mortlake-energy-hub-grows-to-1449-mwh-as-epc-deal-signed/","publisher":"ESS News","published":"2026-09-28","kind":"other","country":"Australia","jurisdiction":"AU","source":"https://www.ess-news.com/2026/09/28/first-stage-bess-at-mortlake-energy-hub-grows-to-1449-mwh-as-epc-deal-signed/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-29T08:20:38.927921+00:00","confidence":"low"},{"entity_id":"signal-380cf598c0a7","record_type":"signal","jurisdiction":"IN","data":{"id":"signal-380cf598c0a7","title":"Pace Digitek secures 115 MWh utility-scale BESS project from BSES Rajdhani Power","link":"https://www.pv-magazine-india.com/2026/10/08/pace-digitek-secures-115-mwh-utility-scale-bess-project-from-bses-rajdhani-power/","publisher":"pv magazine India","published":"2026-10-08","kind":"other","country":"India","jurisdiction":"IN","source":"https://www.pv-magazine-india.com/2026/10/08/pace-digitek-secures-115-mwh-utility-scale-bess-project-from-bses-rajdhani-power/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-10-11T22:20:49.029975+00:00","confidence":"low"},{"entity_id":"signal-392ed5707557","record_type":"signal","jurisdiction":"CN","data":{"id":"signal-392ed5707557","title":"YOU.ON, HyperStrong partner on local-content BESS for Brazil auction","link":"https://www.ess-news.com/2026/10/08/you-on-hyperstrong-partner-on-local-content-bess-for-brazil-auction/","publisher":"ESS News","published":"2026-10-08","kind":"tender","country":"China","jurisdiction":"CN","source":"https://www.ess-news.com/2026/10/08/you-on-hyperstrong-partner-on-local-content-bess-for-brazil-auction/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-10-08T18:20:17.067537+00:00","confidence":"low"},{"entity_id":"signal-39dddcef4073","record_type":"signal","jurisdiction":"AU","data":{"id":"signal-39dddcef4073","title":"Amazon signs first Asia Pacific standalone battery storage tolling deal for 50MW BESS in Australia","link":"https://www.energy-storage.news/amazon-signs-first-asia-pacific-standalone-battery-storage-tolling-deal-for-50mw-bess-in-australia/","publisher":"Energy-Storage.news","published":"2026-09-03","kind":"contract","country":"Australia","jurisdiction":"AU","source":"https://www.energy-storage.news/amazon-signs-first-asia-pacific-standalone-battery-storage-tolling-deal-for-50mw-bess-in-australia/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-10-11T22:20:49.029975+00:00","confidence":"low"},{"entity_id":"signal-3ab6679bbc53","record_type":"signal","jurisdiction":"AU","data":{"id":"signal-3ab6679bbc53","title":"e-Storage to deliver 200 MWh BESS for OX2 in NSW","link":"https://www.pv-magazine-australia.com/2026/10/07/e-storage-to-deliver-200-mwh-bess-for-ox2-in-nsw/","publisher":"pv magazine Australia","published":"2026-10-07","kind":"other","country":"Australia","jurisdiction":"AU","source":"https://www.pv-magazine-australia.com/2026/10/07/e-storage-to-deliver-200-mwh-bess-for-ox2-in-nsw/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-10-11T22:20:49.029975+00:00","confidence":"low"},{"entity_id":"signal-3b097f43c9a9","record_type":"signal","jurisdiction":"CN","data":{"id":"signal-3b097f43c9a9","title":"Trina Storage, AMP-lify to supply 1 GWh of battery storage in Japan","link":"https://www.pv-magazine-australia.com/2026/09/14/trina-storage-amp-lify-to-supply-1-gwh-of-battery-storage-in-japan/","publisher":"pv magazine Australia","published":"2026-09-14","kind":"contract","country":"China","jurisdiction":"CN","source":"https://www.pv-magazine-australia.com/2026/09/14/trina-storage-amp-lify-to-supply-1-gwh-of-battery-storage-in-japan/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-15T17:20:21.452016+00:00","confidence":"low"},{"entity_id":"signal-3c4b58453705","record_type":"signal","jurisdiction":"AU","data":{"id":"signal-3c4b58453705","title":"Canadian Solar’s e-STORAGE to deliver 200MWh BESS for Australian solar-plus-storage site","link":"https://www.energy-storage.news/canadian-solars-e-storage-to-deliver-200mwh-bess-for-australian-solar-plus-storage-site/","publisher":"Energy-Storage.news","published":"2026-10-06","kind":"commissioning","country":"Australia","jurisdiction":"AU","source":"https://www.energy-storage.news/canadian-solars-e-storage-to-deliver-200mwh-bess-for-australian-solar-plus-storage-site/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-10-11T22:20:49.029975+00:00","confidence":"low"},{"entity_id":"signal-3ce98b291ce0","record_type":"signal","jurisdiction":"GLOBAL","data":{"id":"signal-3ce98b291ce0","title":"Brazil battery auction costs likely to reach consumers, says Absae","link":"https://www.ess-news.com/2026/09/21/brazil-battery-auction-costs-likely-to-reach-consumers-says-absae/","publisher":"ESS News","published":"2026-09-21","kind":"tender","country":"Global","jurisdiction":"GLOBAL","source":"https://www.ess-news.com/2026/09/21/brazil-battery-auction-costs-likely-to-reach-consumers-says-absae/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-22T01:20:13.669467+00:00","confidence":"low"},{"entity_id":"signal-3e6cb828cb43","record_type":"signal","jurisdiction":"US","data":{"id":"signal-3e6cb828cb43","title":"US adds record 20.2 GWh of energy storage capacity in Q2","link":"https://www.ess-news.com/2026/09/01/us-adds-record-20-2-gwh-of-energy-storage-in-q2/","publisher":"ESS News","published":"2026-09-01","kind":"analysis","country":"United States","jurisdiction":"US","source":"https://www.ess-news.com/2026/09/01/us-adds-record-20-2-gwh-of-energy-storage-in-q2/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-01T20:44:47.275051+00:00","confidence":"low"},{"entity_id":"signal-3fad7f984eba","record_type":"signal","jurisdiction":"IN","data":{"id":"signal-3fad7f984eba","title":"CEA Proposes Mandatory Co-located Energy Storage for Solar, Wind Projects","link":"https://www.mercomindia.com/cea-proposes-mandatory-co-located-energy-storage-for-solar-wind-projects","publisher":"Mercom India","published":"2026-09-03","kind":"commissioning","country":"India","jurisdiction":"IN","source":"https://www.mercomindia.com/cea-proposes-mandatory-co-located-energy-storage-for-solar-wind-projects"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-04T00:20:14.865375+00:00","confidence":"low"},{"entity_id":"signal-40291c50872a","record_type":"signal","jurisdiction":"US","data":{"id":"signal-40291c50872a","title":"California Governor Newsom signs VPP and balcony solar bills, vetoes community solar legislation","link":"https://www.energy-storage.news/california-governor-newsom-signs-vpp-and-balcony-solar-bills-vetoes-community-solar-legislation/","publisher":"Energy-Storage.news","published":"2026-10-02","kind":"contract","country":"United States","jurisdiction":"US","source":"https://www.energy-storage.news/california-governor-newsom-signs-vpp-and-balcony-solar-bills-vetoes-community-solar-legislation/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-10-11T22:20:49.029975+00:00","confidence":"low"},{"entity_id":"signal-411d80bea761","record_type":"signal","jurisdiction":"EU","data":{"id":"signal-411d80bea761","title":"Leag starts building 1.6 GWh battery storage system","link":"https://www.ess-news.com/2026/09/01/leag-starts-building-1-6-gwh-battery-storage-system/","publisher":"ESS News","published":"2026-09-01","kind":"other","country":"Europe","jurisdiction":"EU","source":"https://www.ess-news.com/2026/09/01/leag-starts-building-1-6-gwh-battery-storage-system/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-01T20:44:47.275051+00:00","confidence":"low"},{"entity_id":"signal-44400ab5db34","record_type":"signal","jurisdiction":"IN","data":{"id":"signal-44400ab5db34","title":"Cochin Shipyard Invites Bids for Battery Storage Project","link":"https://www.mercomindia.com/cochin-shipyard-invites-bids-for-battery-storage-project","publisher":"Mercom India","published":"2026-09-16","kind":"tender","country":"India","jurisdiction":"IN","source":"https://www.mercomindia.com/cochin-shipyard-invites-bids-for-battery-storage-project"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-16T21:23:18.522795+00:00","confidence":"low"},{"entity_id":"signal-4442a599d9fc","record_type":"signal","jurisdiction":"AU","data":{"id":"signal-4442a599d9fc","title":"Large solar and eight-hour battery hybrid seeks green tick, but local mayor says it will be an eyesore","link":"https://reneweconomy.com.au/large-solar-and-eight-hour-battery-hybrid-seeks-green-tick-but-local-mayor-says-it-will-be-an-eyesore/?utm_source=rss&utm_medium=rss&utm_campaign=large-solar-and-eight-hour-battery-hybrid-seeks-green-tick-but-local-mayor-says-it-will-be-an-eyesore","publisher":"RenewEconomy","published":"2026-09-10","kind":"tender","country":"Australia","jurisdiction":"AU","source":"https://reneweconomy.com.au/large-solar-and-eight-hour-battery-hybrid-seeks-green-tick-but-local-mayor-says-it-will-be-an-eyesore/?utm_source=rss&utm_medium=rss&utm_campaign=large-solar-and-eight-hour-battery-hybrid-seeks-green-tick-but-local-mayor-says-it-will-be-an-eyesore"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-11T04:20:18.160074+00:00","confidence":"low"},{"entity_id":"signal-45ec4df7f1b9","record_type":"signal","jurisdiction":"AU","data":{"id":"signal-45ec4df7f1b9","title":"Amazon inks its first ever standalone battery tolling agreement – with a project in Australia","link":"https://reneweconomy.com.au/amazon-inks-its-first-ever-standalone-battery-tolling-agreement-with-a-project-in-east-gippsland/?utm_source=rss&utm_medium=rss&utm_campaign=amazon-inks-its-first-ever-standalone-battery-tolling-agreement-with-a-project-in-east-gippsland","publisher":"RenewEconomy","published":"2026-09-02","kind":"contract","country":"Australia","jurisdiction":"AU","source":"https://reneweconomy.com.au/amazon-inks-its-first-ever-standalone-battery-tolling-agreement-with-a-project-in-east-gippsland/?utm_source=rss&utm_medium=rss&utm_campaign=amazon-inks-its-first-ever-standalone-battery-tolling-agreement-with-a-project-in-east-gippsland"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-04T00:20:14.865375+00:00","confidence":"low"},{"entity_id":"signal-462b14deac72","record_type":"signal","jurisdiction":"AU","data":{"id":"signal-462b14deac72","title":"Wind giant gets green light to plug batteries into turbines at 300 MW project, deliver an Australian first","link":"https://reneweconomy.com.au/wind-giant-gets-green-light-to-plug-batteries-into-turbines-build-australias-first-grid-scale-wind-storage-hybrid/?utm_source=rss&utm_medium=rss&utm_campaign=wind-giant-gets-green-light-to-plug-batteries-into-turbines-build-australias-first-grid-scale-wind-storage-hybrid","publisher":"RenewEconomy","published":"2026-09-01","kind":"award","country":"Australia","jurisdiction":"AU","source":"https://reneweconomy.com.au/wind-giant-gets-green-light-to-plug-batteries-into-turbines-build-australias-first-grid-scale-wind-storage-hybrid/?utm_source=rss&utm_medium=rss&utm_campaign=wind-giant-gets-green-light-to-plug-batteries-into-turbines-build-australias-first-grid-scale-wind-storage-hybrid"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-01T20:44:47.275051+00:00","confidence":"low"},{"entity_id":"signal-47fe45f5b553","record_type":"signal","jurisdiction":"EU","data":{"id":"signal-47fe45f5b553","title":"Projekt Hoch 4 receives SolaX ESS units for 5 MW/10 MWh standalone project in Germany","link":"https://www.ess-news.com/2026/09/21/projekt-hoch-4-receives-solax-ess-units-for-5-mw-10-mwh-standalone-project-in-germany/","publisher":"ESS News","published":"2026-09-21","kind":"other","country":"Europe","jurisdiction":"EU","source":"https://www.ess-news.com/2026/09/21/projekt-hoch-4-receives-solax-ess-units-for-5-mw-10-mwh-standalone-project-in-germany/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-23T02:20:14.775948+00:00","confidence":"low"},{"entity_id":"signal-484ff2035e67","record_type":"signal","jurisdiction":"AU","data":{"id":"signal-484ff2035e67","title":"Gamuda and Yanara sign EPC contract for 300MW solar-plus-storage project in Australia","link":"https://www.energy-storage.news/gamuda-and-yanara-sign-epc-contract-for-300mw-solar-plus-storage-project-in-australia/","publisher":"Energy-Storage.news","published":"2026-09-29","kind":"contract","country":"Australia","jurisdiction":"AU","source":"https://www.energy-storage.news/gamuda-and-yanara-sign-epc-contract-for-300mw-solar-plus-storage-project-in-australia/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-10-11T22:20:49.029975+00:00","confidence":"low"},{"entity_id":"signal-49b9180225ca","record_type":"signal","jurisdiction":"AU","data":{"id":"signal-49b9180225ca","title":"119 MW Victorian solar farm connects to grid, site prepares for BESS construction","link":"https://www.pv-magazine-australia.com/2026/09/04/119-mw-victorian-solar-farm-connects-to-grid-site-prepares-for-bess-construction/","publisher":"pv magazine Australia","published":"2026-09-03","kind":"other","country":"Australia","jurisdiction":"AU","source":"https://www.pv-magazine-australia.com/2026/09/04/119-mw-victorian-solar-farm-connects-to-grid-site-prepares-for-bess-construction/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-07T16:49:27.225882+00:00","confidence":"low"},{"entity_id":"signal-4a95ec58956a","record_type":"signal","jurisdiction":"AU","data":{"id":"signal-4a95ec58956a","title":"State looks to tariff changes to help take the heat out of decarbonisation for big business","link":"https://reneweconomy.com.au/state-looks-to-tariff-changes-to-help-take-the-heat-out-of-decarbonisation-for-big-business/?utm_source=rss&utm_medium=rss&utm_campaign=state-looks-to-tariff-changes-to-help-take-the-heat-out-of-decarbonisation-for-big-business","publisher":"RenewEconomy","published":"2026-09-02","kind":"other","country":"Australia","jurisdiction":"AU","source":"https://reneweconomy.com.au/state-looks-to-tariff-changes-to-help-take-the-heat-out-of-decarbonisation-for-big-business/?utm_source=rss&utm_medium=rss&utm_campaign=state-looks-to-tariff-changes-to-help-take-the-heat-out-of-decarbonisation-for-big-business"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-02T23:46:01.374147+00:00","confidence":"low"},{"entity_id":"signal-4abf6c6ee07f","record_type":"signal","jurisdiction":"IN","data":{"id":"signal-4abf6c6ee07f","title":"India likely to commission 45-50 GWh of BESS capacity across fiscals 2027 and 2028: Crisil","link":"https://www.pv-magazine-india.com/2026/09/28/india-likely-to-commission-45-50-gwh-of-bess-capacity-in-fiscals-2027-and-2028-crisil/","publisher":"pv magazine India","published":"2026-09-28","kind":"award","country":"India","jurisdiction":"IN","source":"https://www.pv-magazine-india.com/2026/09/28/india-likely-to-commission-45-50-gwh-of-bess-capacity-in-fiscals-2027-and-2028-crisil/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-29T08:20:38.927921+00:00","confidence":"low"},{"entity_id":"signal-4ac9d3447e17","record_type":"signal","jurisdiction":"GLOBAL","data":{"id":"signal-4ac9d3447e17","title":"How competitive is BESS for data centers, really?","link":"https://www.ess-news.com/2026/09/10/how-competitive-is-bess-for-data-centers-really/","publisher":"ESS News","published":"2026-09-10","kind":"award","country":"Global","jurisdiction":"GLOBAL","source":"https://www.ess-news.com/2026/09/10/how-competitive-is-bess-for-data-centers-really/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-13T15:20:26.017504+00:00","confidence":"low"},{"entity_id":"signal-4b00186b2596","record_type":"signal","jurisdiction":"EU","data":{"id":"signal-4b00186b2596","title":"Northland Power closes financing for 1.2 GWh battery storage projects in Poland","link":"https://www.ess-news.com/2026/10/05/northland-power-closes-financing-for-1-2-gwh-battery-storage-projects-in-poland/","publisher":"ESS News","published":"2026-10-05","kind":"other","country":"Europe","jurisdiction":"EU","source":"https://www.ess-news.com/2026/10/05/northland-power-closes-financing-for-1-2-gwh-battery-storage-projects-in-poland/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-10-05T15:20:15.080739+00:00","confidence":"low"},{"entity_id":"signal-4b435cbc37c5","record_type":"signal","jurisdiction":"IN","data":{"id":"signal-4b435cbc37c5","title":"Ahmedabad Municipal Body Floats Tender for Solar-Plus-Storage Project","link":"https://www.mercomindia.com/ahmedabad-municipal-body-floats-tender-for-solar-plus-storage-project","publisher":"Mercom India","published":"2026-09-17","kind":"tender","country":"India","jurisdiction":"IN","source":"https://www.mercomindia.com/ahmedabad-municipal-body-floats-tender-for-solar-plus-storage-project"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-17T22:20:29.692035+00:00","confidence":"low"},{"entity_id":"signal-4c60e6d3dc33","record_type":"signal","jurisdiction":"ES","data":{"id":"signal-4c60e6d3dc33","title":"Zelestra, Salzgitter Flachstahl sign German hybrid solar-plus-storage PPA","link":"https://www.ess-news.com/2026/09/16/zelestra-salzgitter-flachstahl-sign-german-hybrid-solar-plus-storage-ppa/","publisher":"ESS News","published":"2026-09-16","kind":"contract","country":"Spain","jurisdiction":"ES","source":"https://www.ess-news.com/2026/09/16/zelestra-salzgitter-flachstahl-sign-german-hybrid-solar-plus-storage-ppa/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-16T21:23:18.522795+00:00","confidence":"low"},{"entity_id":"signal-4dfbdb7c38cd","record_type":"signal","jurisdiction":"US","data":{"id":"signal-4dfbdb7c38cd","title":"GridStor wins financing for 400 MWh BESS in Arizona, tolling secured with state utility","link":"https://www.ess-news.com/2026/09/22/gridstor-wins-financing-for-400-mwh-bess-in-arizona-tolling-secured-with-state-utility/","publisher":"ESS News","published":"2026-09-22","kind":"award","country":"United States","jurisdiction":"US","source":"https://www.ess-news.com/2026/09/22/gridstor-wins-financing-for-400-mwh-bess-in-arizona-tolling-secured-with-state-utility/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-23T02:20:14.775948+00:00","confidence":"low"},{"entity_id":"signal-4e8685560311","record_type":"signal","jurisdiction":"AU","data":{"id":"signal-4e8685560311","title":"Lava Blue commissions Australia’s first grid NAS battery as ZEBRE sees 360MWh BESS waved through EPBC Act","link":"https://www.energy-storage.news/lava-blue-commissions-australias-first-grid-nas-battery-as-zebre-sees-360mwh-bess-waved-through-epbc-act/","publisher":"Energy-Storage.news","published":"2026-09-14","kind":"commissioning","country":"Australia","jurisdiction":"AU","source":"https://www.energy-storage.news/lava-blue-commissions-australias-first-grid-nas-battery-as-zebre-sees-360mwh-bess-waved-through-epbc-act/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-10-11T22:20:49.029975+00:00","confidence":"low"},{"entity_id":"signal-5005f58934b2","record_type":"signal","jurisdiction":"EU","data":{"id":"signal-5005f58934b2","title":"Statkraft and Greenvolt sign largest EU battery energy storage tolling agreement for projects in Poland","link":"https://www.energy-storage.news/statkraft-and-greenvolt-sign-largest-eu-battery-energy-storage-tolling-agreement-for-projects-in-poland/","publisher":"Energy-Storage.news","published":"2026-10-05","kind":"contract","country":"Europe","jurisdiction":"EU","source":"https://www.energy-storage.news/statkraft-and-greenvolt-sign-largest-eu-battery-energy-storage-tolling-agreement-for-projects-in-poland/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-10-11T22:20:49.029975+00:00","confidence":"low"},{"entity_id":"signal-506caf886ca1","record_type":"signal","jurisdiction":"US","data":{"id":"signal-506caf886ca1","title":"GridStor Secures $220 Million for 400 MWh Arizona Battery Project","link":"https://www.mercomindia.com/gridstor-secures-220-million-400-mwh-arizona-battery-project","publisher":"Mercom India","published":"2026-09-25","kind":"other","country":"United States","jurisdiction":"US","source":"https://www.mercomindia.com/gridstor-secures-220-million-400-mwh-arizona-battery-project"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-28T07:40:40.572624+00:00","confidence":"low"},{"entity_id":"signal-530477cac012","record_type":"signal","jurisdiction":"GLOBAL","data":{"id":"signal-530477cac012","title":"Regulatory hurdles persist in Norway’s battery market","link":"https://www.ess-news.com/2026/09/03/regulatory-hurdles-persist-in-norways-battery-market/","publisher":"ESS News","published":"2026-09-03","kind":"other","country":"Global","jurisdiction":"GLOBAL","source":"https://www.ess-news.com/2026/09/03/regulatory-hurdles-persist-in-norways-battery-market/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-04T00:20:14.865375+00:00","confidence":"low"},{"entity_id":"signal-53ba93f681e3","record_type":"signal","jurisdiction":"CL","data":{"id":"signal-53ba93f681e3","title":"Korkia advances Chilean storage pipeline across two projects for 1.55 GWh","link":"https://www.ess-news.com/2026/09/01/korkia-advances-chilean-storage-pipeline-across-two-projects-for-1-55-gwh/","publisher":"ESS News","published":"2026-09-01","kind":"other","country":"Chile","jurisdiction":"CL","source":"https://www.ess-news.com/2026/09/01/korkia-advances-chilean-storage-pipeline-across-two-projects-for-1-55-gwh/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-01T20:44:47.275051+00:00","confidence":"low"},{"entity_id":"signal-5404ff3facbf","record_type":"signal","jurisdiction":"AU","data":{"id":"signal-5404ff3facbf","title":"Australian state approves 200 MWh battery despite 70-plus objections","link":"https://www.ess-news.com/2026/09/25/australian-state-approves-200-mwh-battery-despite-70-plus-objections/","publisher":"ESS News","published":"2026-09-25","kind":"other","country":"Australia","jurisdiction":"AU","source":"https://www.ess-news.com/2026/09/25/australian-state-approves-200-mwh-battery-despite-70-plus-objections/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-28T07:40:40.572624+00:00","confidence":"low"},{"entity_id":"signal-54fad4043245","record_type":"signal","jurisdiction":"US","data":{"id":"signal-54fad4043245","title":"Energy Vault signs 1.25GW AI data centre power infrastructure agreement in Texas","link":"https://www.energy-storage.news/energy-vault-signs-1-25gw-ai-data-centre-power-infrastructure-agreement-in-texas/","publisher":"Energy-Storage.news","published":"2026-08-11","kind":"contract","country":"United States","jurisdiction":"US","source":"https://www.energy-storage.news/energy-vault-signs-1-25gw-ai-data-centre-power-infrastructure-agreement-in-texas/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-10-06T16:20:14.201246+00:00","confidence":"low"},{"entity_id":"signal-57c54c3b10f7","record_type":"signal","jurisdiction":"AU","data":{"id":"signal-57c54c3b10f7","title":"Squadron lands federal tick for Queensland solar and battery project","link":"https://www.pv-magazine-australia.com/2026/09/28/squadron-lands-federal-tick-for-queensland-solar-and-battery-project/","publisher":"pv magazine Australia","published":"2026-09-28","kind":"other","country":"Australia","jurisdiction":"AU","source":"https://www.pv-magazine-australia.com/2026/09/28/squadron-lands-federal-tick-for-queensland-solar-and-battery-project/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-29T08:20:38.927921+00:00","confidence":"low"},{"entity_id":"signal-5816471a4cc2","record_type":"signal","jurisdiction":"GLOBAL","data":{"id":"signal-5816471a4cc2","title":"FlexGen, Lightshift plan 55 MW/200 MWh of new US batteries","link":"https://www.ess-news.com/2026/09/18/flexgen-lightshift-plan-55-mw-200-mwh-of-new-us-batteries/","publisher":"ESS News","published":"2026-09-18","kind":"other","country":"Global","jurisdiction":"GLOBAL","source":"https://www.ess-news.com/2026/09/18/flexgen-lightshift-plan-55-mw-200-mwh-of-new-us-batteries/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-21T00:20:14.076736+00:00","confidence":"low"},{"entity_id":"signal-5a447dcc8c3b","record_type":"signal","jurisdiction":"IN","data":{"id":"signal-5a447dcc8c3b","title":"Waaree Energies wins 700 MW solar-plus-storage project from SECI, plans $37 million Arizona factory upgrade","link":"https://www.pv-magazine-india.com/2026/09/01/waaree-energies-wins-700-mw-solar-plus-storage-project-from-seci-plans-37-million-arizona-factory-upgrade/","publisher":"pv magazine India","published":"2026-09-01","kind":"award","country":"India","jurisdiction":"IN","source":"https://www.pv-magazine-india.com/2026/09/01/waaree-energies-wins-700-mw-solar-plus-storage-project-from-seci-plans-37-million-arizona-factory-upgrade/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-01T20:44:47.275051+00:00","confidence":"low"},{"entity_id":"signal-5a8e7090a0e4","record_type":"signal","jurisdiction":"IN","data":{"id":"signal-5a8e7090a0e4","title":"Kerala: Indian state proposes five-year electricity tariff framework with new provisions for BESS","link":"https://www.energy-storage.news/kerala-indian-state-proposes-five-year-electricity-tariff-framework-with-new-provisions-for-bess/","publisher":"Energy-Storage.news","published":"2026-09-30","kind":"other","country":"India","jurisdiction":"IN","source":"https://www.energy-storage.news/kerala-indian-state-proposes-five-year-electricity-tariff-framework-with-new-provisions-for-bess/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-10-11T22:20:49.029975+00:00","confidence":"low"},{"entity_id":"signal-5bf9c5bc8f62","record_type":"signal","jurisdiction":"AU","data":{"id":"signal-5bf9c5bc8f62","title":"Community-owned 6.8 MW solar and 10.5 MWh battery mark project completion","link":"https://www.pv-magazine-australia.com/2026/09/16/community-owned-6-8-mw-solar-and-10-5-mwh-battery-mark-project-completion/","publisher":"pv magazine Australia","published":"2026-09-16","kind":"other","country":"Australia","jurisdiction":"AU","source":"https://www.pv-magazine-australia.com/2026/09/16/community-owned-6-8-mw-solar-and-10-5-mwh-battery-mark-project-completion/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-17T22:20:29.692035+00:00","confidence":"low"},{"entity_id":"signal-5bfe070aaa42","record_type":"signal","jurisdiction":"GB","data":{"id":"signal-5bfe070aaa42","title":"UK July Roundup: Engie commissions 100MW, Fidra and Masdar FIDs, Eku buys big, consents for Aura, Starlight","link":"https://www.energy-storage.news/uk-engie-commissions-100mw-fidra-masdar-fids-eku-buys-big-consents-for-aura-starlight/","publisher":"Energy-Storage.news","published":"2026-08-05","kind":"commissioning","country":"United Kingdom","jurisdiction":"GB","source":"https://www.energy-storage.news/uk-engie-commissions-100mw-fidra-masdar-fids-eku-buys-big-consents-for-aura-starlight/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-04T00:20:14.865375+00:00","confidence":"low"},{"entity_id":"signal-5c6f7881a1dc","record_type":"signal","jurisdiction":"IN","data":{"id":"signal-5c6f7881a1dc","title":"Bihar Invites Bids for 500 MWh Standalone Battery Storage Project","link":"https://www.mercomindia.com/bihar-invites-bids-for-500-mwh-standalone-battery-storage-project","publisher":"Mercom India","published":"2026-09-10","kind":"tender","country":"India","jurisdiction":"IN","source":"https://www.mercomindia.com/bihar-invites-bids-for-500-mwh-standalone-battery-storage-project"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-11T04:20:18.160074+00:00","confidence":"low"},{"entity_id":"signal-5c86627e6959","record_type":"signal","jurisdiction":"CN","data":{"id":"signal-5c86627e6959","title":"China’s 700 MW Jintan salt-cavern CAES project completes full-system startup","link":"https://www.ess-news.com/2026/10/05/chinas-700-mw-jintan-salt-cavern-caes-project-completes-full-system-startup/","publisher":"ESS News","published":"2026-10-05","kind":"commissioning","country":"China","jurisdiction":"CN","source":"https://www.ess-news.com/2026/10/05/chinas-700-mw-jintan-salt-cavern-caes-project-completes-full-system-startup/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-10-05T15:20:15.080739+00:00","confidence":"low"},{"entity_id":"signal-5cf48e2c6150","record_type":"signal","jurisdiction":"US","data":{"id":"signal-5cf48e2c6150","title":"Linea Energy closes financing for 250 MW/500 MWh Texas BESS","link":"https://www.ess-news.com/2026/10/08/linea-energy-closes-financing-for-250-mw-500-mwh-texas-bess/","publisher":"ESS News","published":"2026-10-08","kind":"other","country":"United States","jurisdiction":"US","source":"https://www.ess-news.com/2026/10/08/linea-energy-closes-financing-for-250-mw-500-mwh-texas-bess/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-10-08T18:20:17.067537+00:00","confidence":"low"},{"entity_id":"signal-5dbf55569b1a","record_type":"signal","jurisdiction":"KR","data":{"id":"signal-5dbf55569b1a","title":"SK On signs 18GWh reciprocal LFP supply deal with NeoVolta Power for US-made battery storage","link":"https://www.energy-storage.news/sk-on-signs-18gwh-reciprocal-lfp-supply-deal-with-neovolta-power-for-us-made-battery-storage/","publisher":"Energy-Storage.news","published":"2026-09-01","kind":"contract","country":"South Korea","jurisdiction":"KR","source":"https://www.energy-storage.news/sk-on-signs-18gwh-reciprocal-lfp-supply-deal-with-neovolta-power-for-us-made-battery-storage/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-10-11T22:20:49.029975+00:00","confidence":"low"},{"entity_id":"signal-5f23e460db93","record_type":"signal","jurisdiction":"ES","data":{"id":"signal-5f23e460db93","title":"Spain awards €265 million for 49.9 GWh of pumped hydro storage","link":"https://www.ess-news.com/2026/09/25/spain-awards-e265-million-for-49-9-gwh-of-pumped-hydro-storage/","publisher":"ESS News","published":"2026-09-25","kind":"award","country":"Spain","jurisdiction":"ES","source":"https://www.ess-news.com/2026/09/25/spain-awards-e265-million-for-49-9-gwh-of-pumped-hydro-storage/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-28T07:40:40.572624+00:00","confidence":"low"},{"entity_id":"signal-5f2e5f8a7a40","record_type":"signal","jurisdiction":"AU","data":{"id":"signal-5f2e5f8a7a40","title":"1GWh battery energy storage system gets green tick to start construction in NSW","link":"https://www.pv-magazine-australia.com/2026/10/01/1gwh-battery-energy-storage-system-gets-green-tick-to-start-construction-in-nsw/","publisher":"pv magazine Australia","published":"2026-10-01","kind":"award","country":"Australia","jurisdiction":"AU","source":"https://www.pv-magazine-australia.com/2026/10/01/1gwh-battery-energy-storage-system-gets-green-tick-to-start-construction-in-nsw/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-10-04T14:24:20.164576+00:00","confidence":"low"},{"entity_id":"signal-60da7beaf537","record_type":"signal","jurisdiction":"AU","data":{"id":"signal-60da7beaf537","title":"Rare wind, solar and battery hybrid seeks environmental approvals in new renewables hotspot","link":"https://reneweconomy.com.au/rare-wind-solar-and-battery-hybrid-seeks-environmental-approvals-in-new-renewables-hotspot/?utm_source=rss&utm_medium=rss&utm_campaign=rare-wind-solar-and-battery-hybrid-seeks-environmental-approvals-in-new-renewables-hotspot","publisher":"RenewEconomy","published":"2026-09-21","kind":"tender","country":"Australia","jurisdiction":"AU","source":"https://reneweconomy.com.au/rare-wind-solar-and-battery-hybrid-seeks-environmental-approvals-in-new-renewables-hotspot/?utm_source=rss&utm_medium=rss&utm_campaign=rare-wind-solar-and-battery-hybrid-seeks-environmental-approvals-in-new-renewables-hotspot"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-22T01:20:13.669467+00:00","confidence":"low"},{"entity_id":"signal-614d1528e16f","record_type":"signal","jurisdiction":"AU","data":{"id":"signal-614d1528e16f","title":"Australian state utility takes stake in 400 MW/1.86 GWh battery","link":"https://www.ess-news.com/2026/09/17/australian-state-utility-takes-stake-in-400-mw-1-86-gwh-battery/","publisher":"ESS News","published":"2026-09-17","kind":"other","country":"Australia","jurisdiction":"AU","source":"https://www.ess-news.com/2026/09/17/australian-state-utility-takes-stake-in-400-mw-1-86-gwh-battery/"},"source_url":"https://www.energy-storage.news/feed/","publisher":"Mercom India / pv magazine India / pv magazine Australia / RenewEconomy / ESS News / Energy-Storage.news","fetched_at":"2026-09-17T22:20:29.692035+00:00","confidence":"low"},{"entity_id":"tender-capacity-investment-scheme-dispatchable-storage-target-to-2030","record_type":"tender","jurisdiction":"AU","data":{"id":"tender-capacity-investment-scheme-dispatchable-storage-target-to-2030","name":"Capacity Investment Scheme — dispatchable (storage) target to 2030","issuer":"DCCEEW","country":"Australia","jurisdiction":"AU","asset_class":"other","tender_type":"capacity_scheme","capacity_mw":9000.0,"stage":"issued","support":"Contract-for-difference style underwriting","winners":[],"source":"https://www.dcceew.gov.au/energy/renewable/capacity-investment-scheme"},"source_url":"https://www.dcceew.gov.au/energy/renewable/capacity-investment-scheme","publisher":"DCCEEW / AEMO","fetched_at":"2026-09-12T14:23:45.974200+00:00","confidence":"low"},{"entity_id":"tender-capacity-investment-scheme-total-underwritten-capacity-to-2030","record_type":"tender","jurisdiction":"AU","data":{"id":"tender-capacity-investment-scheme-total-underwritten-capacity-to-2030","name":"Capacity Investment Scheme — total underwritten capacity to 2030","issuer":"DCCEEW","country":"Australia","jurisdiction":"AU","asset_class":"other","tender_type":"capacity_scheme","capacity_mw":32000.0,"stage":"issued","support":"23 GW variable renewable + 9 GW dispatchable","winners":[],"source":"https://www.dcceew.gov.au/energy/renewable/capacity-investment-scheme"},"source_url":"https://www.dcceew.gov.au/energy/renewable/capacity-investment-scheme","publisher":"DCCEEW / AEMO","fetched_at":"2026-09-12T14:23:45.974200+00:00","confidence":"low"},{"entity_id":"tender-for-design-engineering-supply-construction-erection-testing-commissioning-and-maintenance-of-70-mw-ists-connected-solar-pv-power-project-paired-with-25mw-50mwh-bess-at-ramagiri-sri-sathya-sai-district-andhra-pradesh-package-1-solar-bess","record_type":"tender","jurisdiction":"IN","data":{"id":"tender-for-design-engineering-supply-construction-erection-testing-commissioning-and-maintenance-of-70-mw-ists-connected-solar-pv-power-project-paired-with-25mw-50mwh-bess-at-ramagiri-sri-sathya-sai-district-andhra-pradesh-package-1-solar-bess","name":"Tender for Design, Engineering, Supply, Construction, Erection, Testing, Commissioning and Maintenance of 70 MW ISTS Connected Solar PV Power Project paired with 25MW/ 50MWh BESS at Ramagiri, Sri Sathya Sai District, Andhra Pradesh (Package-1: Solar+BESS)","issuer":"Solar Energy Corporation of India Limited (SECI)","country":"India","jurisdiction":"IN","asset_class":"battery","tender_type":"solar_plus_bess","capacity_mw":25.0,"capacity_mwh":50.0,"stage":"issued","winners":[],"state":"Andhra Pradesh","note":"EPC scope. capacity_mw is the BESS power (25 MW); the paired solar PV nameplate is 70 MW ISTS-connected. Tender Ref No. SECI/C&P/OP/11/0002/26-27 (Tender ID SECI000262 / SECI-2026-TN000016). Published 24/06/2026; bid submission date 30/09/2026. Site: Ramagiri, Sri Sathya Sai District."},"source_url":"https://www.seci.co.in/tenders","publisher":"SECI / NTPC / SJVN / GUVNL / MSEDCL + trade press","fetched_at":"2026-09-19T20:23:18.689160+00:00","confidence":"medium"},{"entity_id":"tender-guvnl-phase-ix-standalone-bess","record_type":"tender","jurisdiction":"IN","data":{"id":"tender-guvnl-phase-ix-standalone-bess","name":"GUVNL Phase IX standalone BESS","issuer":"GUVNL","country":"India","jurisdiction":"IN","asset_class":"other","tender_type":"standalone_bess","capacity_mw":450.0,"capacity_mwh":900.0,"stage":"awarded","support":"TBCB","tariff":"INR 2.32 lakh/MW/month","winners":["NLC India","Sun Drops"],"state":"Gujarat","awarded_on":"2026-08","source":"https://www.pv-magazine-india.com/2026/08/11/guvnl-discovers-inr-2-32-lakh-mw-month-tariff-in-450-mw-900-mwh-bess-tender/"},"source_url":"https://www.seci.co.in/tenders","publisher":"SECI / NTPC / SJVN / GUVNL / MSEDCL + trade press","fetched_at":"2026-09-12T14:23:44.782256+00:00","confidence":"medium"},{"entity_id":"tender-guvnl-phase-vi-standalone-bess","record_type":"tender","jurisdiction":"IN","data":{"id":"tender-guvnl-phase-vi-standalone-bess","name":"GUVNL Phase VI standalone BESS","issuer":"GUVNL","country":"India","jurisdiction":"IN","asset_class":"other","tender_type":"standalone_bess","capacity_mw":500.0,"capacity_mwh":1000.0,"stage":"awarded","winners":["Solarworld","H.G. Infra"],"state":"Gujarat","source":"https://www.mercomindia.com/gujarat-regulator-approves-tariffs-for-500-mw-1000-mwh-bess-projects"},"source_url":"https://www.seci.co.in/tenders","publisher":"SECI / NTPC / SJVN / GUVNL / MSEDCL + trade press","fetched_at":"2026-09-12T14:23:44.782256+00:00","confidence":"medium"},{"entity_id":"tender-guvnl-phase-vii-standalone-bess","record_type":"tender","jurisdiction":"IN","data":{"id":"tender-guvnl-phase-vii-standalone-bess","name":"GUVNL Phase VII standalone BESS","issuer":"GUVNL","country":"India","jurisdiction":"IN","asset_class":"other","tender_type":"standalone_bess","capacity_mw":2000.0,"capacity_mwh":4000.0,"stage":"awarded","support":"TBCB","tariff":"INR 2,220-2,268/MW/month","winners":["9 winners (see source)"],"state":"Gujarat","awarded_on":"2025-11","source":"https://www.ess-news.com/2025/11/18/indias-4-gwh-standalone-battery-storage-tender-yields-tariffs-of-2220-2268-mw-month/"},"source_url":"https://www.seci.co.in/tenders","publisher":"SECI / NTPC / SJVN / GUVNL / MSEDCL + trade press","fetched_at":"2026-09-12T14:23:44.782256+00:00","confidence":"medium"},{"entity_id":"tender-guvnl-pilot-standalone-bess","record_type":"tender","jurisdiction":"IN","data":{"id":"tender-guvnl-pilot-standalone-bess","name":"GUVNL Pilot standalone BESS","issuer":"GUVNL","country":"India","jurisdiction":"IN","asset_class":"other","tender_type":"standalone_bess","capacity_mw":250.0,"capacity_mwh":500.0,"stage":"awarded","support":"TBCB","winners":["Gensol","IndiGrid"],"state":"Gujarat","source":"https://www.mercomindia.com/gensol-indigrid-guvnls-bess-auction-record-low-tariffs"},"source_url":"https://www.seci.co.in/tenders","publisher":"SECI / NTPC / SJVN / GUVNL / MSEDCL + trade press","fetched_at":"2026-09-12T14:23:44.782256+00:00","confidence":"medium"},{"entity_id":"tender-jp-ltda-fy2023-d01","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-d01","name":"米原市湖東蓄電所（仮称） — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":96.208,"stage":"awarded","winners":["オリックス株式会社"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: 蓄電池. The 96,208 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-d02","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-d02","name":"静岡菊川蓄電所 — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":22.077,"stage":"awarded","winners":["テス・エンジニアリング株式会社"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: 蓄電池. The 22,077 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-d03","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-d03","name":"苫東厚真発電所 — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"other","tender_type":"capacity_scheme","capacity_mw":132.2,"stage":"awarded","winners":["北海道電力株式会社"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: 既設火力の改修. The 132,200 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-d04","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-d04","name":"奥多々良木発電所３号機 — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"pumped_hydro","tender_type":"capacity_scheme","capacity_mw":254.308,"stage":"awarded","winners":["関西電力株式会社"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: 水力(揚水). The 254,308 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-d05","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-d05","name":"奥多々良木発電所４号機 — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"pumped_hydro","tender_type":"capacity_scheme","capacity_mw":254.308,"stage":"awarded","winners":["関西電力株式会社"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: 水力(揚水). The 254,308 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-d06","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-d06","name":"島根原子力発電所３号機 — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"other","tender_type":"capacity_scheme","capacity_mw":1315.707,"stage":"awarded","winners":["中国電力株式会社"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: 原子力. The 1,315,707 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-d07","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-d07","name":"青森県青森市野木山口蓄電所 — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":27.158,"stage":"awarded","winners":["CHCJapan株式会社"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: 蓄電池. The 27,158 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-d08","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-d08","name":"岡山美作蓄電所 — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":22.719,"stage":"awarded","winners":["CHCJapan株式会社"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: 蓄電池. The 22,719 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-d09","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-d09","name":"北海道札幌市西区宮の沢蓄電所 — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":28.06,"stage":"awarded","winners":["CHCJapan株式会社"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: 蓄電池. The 28,060 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-d10","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-d10","name":"留辺蘂蓄電所 — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":25.25,"stage":"awarded","winners":["CHCJapan株式会社"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: 蓄電池. The 25,250 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-d11","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-d11","name":"神戸発電所１号機 — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"other","tender_type":"capacity_scheme","capacity_mw":131.433,"stage":"awarded","winners":["株式会社コベルコパワー神戸"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: 既設火力の改修. The 131,433 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-d12","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-d12","name":"神戸発電所２号機 — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"other","tender_type":"capacity_scheme","capacity_mw":132.0,"stage":"awarded","winners":["株式会社コベルコパワー神戸"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: 既設火力の改修. The 132,000 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-d13","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-d13","name":"高根第一水力発電所 — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"pumped_hydro","tender_type":"capacity_scheme","capacity_mw":68.321,"stage":"awarded","winners":["中部電力株式会社"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: 水力(揚水). The 68,321 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-d14","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-d14","name":"苫小牧蓄電所 — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":70.213,"stage":"awarded","winners":["株式会社レノバ"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: 蓄電池. The 70,213 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-d15","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-d15","name":"白老蓄電所 — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":39.027,"stage":"awarded","winners":["株式会社レノバ"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: 蓄電池. The 39,027 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-d16","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-d16","name":"森町睦実２蓄電所 — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":56.351,"stage":"awarded","winners":["株式会社レノバ"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: 蓄電池. The 56,351 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-d17","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-d17","name":"苫東バイオマスパワーステーション — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"other","tender_type":"capacity_scheme","capacity_mw":100.0,"stage":"awarded","winners":["エクイスバイオエネルギー・ジャパン株式会社"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: バイオマス. The 100,000 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-d18","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-d18","name":"石狩湾新港バイオマス発電所 — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"other","tender_type":"capacity_scheme","capacity_mw":99.258,"stage":"awarded","winners":["石狩湾新港バイオマス発電合同会社"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: バイオマス. The 99,258 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-d19","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-d19","name":"伊賀市川西蓄電システム — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":22.531,"stage":"awarded","winners":["ヘキサ・エネルギーサービス合同会社"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: 蓄電池. The 22,531 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-d20","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-d20","name":"恵庭市西島松蓄電システム — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":23.217,"stage":"awarded","winners":["ヘキサ・エネルギーサービス合同会社"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: 蓄電池. The 23,217 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-d21","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-d21","name":"小矢部市石名田蓄電システム — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":39.983,"stage":"awarded","winners":["ヘキサ・エネルギーサービス合同会社"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: 蓄電池. The 39,983 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-d22","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-d22","name":"熊本市北区弓削蓄電システム — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":29.615,"stage":"awarded","winners":["ヘキサ・エネルギーサービス合同会社"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: 蓄電池. The 29,615 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-d23","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-d23","name":"田川市大字伊加利②蓄電システム — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":22.189,"stage":"awarded","winners":["ヘキサ・エネルギーサービス合同会社"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: 蓄電池. The 22,189 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-d24","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-d24","name":"白老郡白老町北吉原蓄電システム — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":23.393,"stage":"awarded","winners":["ヘキサ・エネルギーサービス合同会社"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: 蓄電池. The 23,393 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-d25","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-d25","name":"白老郡白老町字石山蓄電システム — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":39.004,"stage":"awarded","winners":["ヘキサ・エネルギーサービス合同会社"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: 蓄電池. The 39,004 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-d26","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-d26","name":"福知山市字荒河蓄電システム — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":36.918,"stage":"awarded","winners":["ヘキサ・エネルギーサービス合同会社"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: 蓄電池. The 36,918 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-d27","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-d27","name":"松阪市上川町蓄電システム — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":28.568,"stage":"awarded","winners":["ヘキサ・エネルギーサービス合同会社"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: 蓄電池. The 28,568 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-d28","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-d28","name":"美唄市字美唄蓄電システム — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":39.004,"stage":"awarded","winners":["ヘキサ・エネルギーサービス合同会社"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: 蓄電池. The 39,004 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-d29","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-d29","name":"由利本荘市乙助渕蓄電システム — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":37.597,"stage":"awarded","winners":["ヘキサ・エネルギーサービス合同会社"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: 蓄電池. The 37,597 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-d30","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-d30","name":"AEJ大分県臼杵蓄電所事業（仮） — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":37.019,"stage":"awarded","winners":["のぞみエナジー株式会社"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: 蓄電池. The 37,019 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-d31","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-d31","name":"AEJ福岡県直方蓄電所（仮） — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":37.019,"stage":"awarded","winners":["のぞみエナジー株式会社"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: 蓄電池. The 37,019 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-d32","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-d32","name":"三池発電所 — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"other","tender_type":"capacity_scheme","capacity_mw":55.3,"stage":"awarded","winners":["CEFH2株式会社"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: 既設火力の改修. The 55,300 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-d33","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-d33","name":"三重多気蓄電所 — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":36.222,"stage":"awarded","winners":["合同会社バッテリーパーク1"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: 蓄電池. The 36,222 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-d34","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-d34","name":"FUKO-B1蓄電池発電所 — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":36.814,"stage":"awarded","winners":["合同会社バッテリーパーク1"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: 蓄電池. The 36,814 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-d35","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-d35","name":"福島メガソーラー西郷村第一蓄電所 — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":16.535,"stage":"awarded","winners":["株式会社樋口組"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: 蓄電池. The 16,535 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-d36","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-d36","name":"福島メガソーラー西郷村第二蓄電所 — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":16.527,"stage":"awarded","winners":["福島蓄電池事業1合同会社"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: 蓄電池. The 16,527 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-d37","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-d37","name":"ＣＳ青森今別蓄電所 — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":32.677,"stage":"awarded","winners":["ティーダ・パワー１１０合同会社"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: 蓄電池. The 32,677 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-d38","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-d38","name":"ＣＳ福島石川２蓄電所 — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":37.997,"stage":"awarded","winners":["ティーダ・パワー１１０合同会社"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: 蓄電池. The 37,997 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-d39","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-d39","name":"ＣＳ山口新美祢２蓄電所 — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":74.669,"stage":"awarded","winners":["ティーダ・パワー１１０合同会社"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: 蓄電池. The 74,669 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-d40","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-d40","name":"夕張郡長沼町蓄電システム — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":37.515,"stage":"awarded","winners":["株式会社城洋商事"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: 蓄電池. The 37,515 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-d41","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-d41","name":"碧南火力発電所４号機 — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"other","tender_type":"capacity_scheme","capacity_mw":187.334,"stage":"awarded","winners":["株式会社ＪＥＲＡ"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: 既設火力の改修. The 187,334 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-d42","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-d42","name":"碧南火力発電所５号機 — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"other","tender_type":"capacity_scheme","capacity_mw":187.315,"stage":"awarded","winners":["株式会社ＪＥＲＡ"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: 既設火力の改修. The 187,315 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-l01","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-l01","name":"石狩湾新港発電所 — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"gas","tender_type":"capacity_scheme","capacity_mw":551.217,"stage":"awarded","winners":["北海道電力株式会社"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: LNG専焼火力. The 551,217 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-l02","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-l02","name":"東新潟火力発電所第６号機 — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"gas","tender_type":"capacity_scheme","capacity_mw":615.849,"stage":"awarded","winners":["東北電力株式会社"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: LNG専焼火力. The 615,849 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-l03","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-l03","name":"南港発電所１号機 — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"gas","tender_type":"capacity_scheme","capacity_mw":591.812,"stage":"awarded","winners":["関西電力株式会社"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: LNG専焼火力. The 591,812 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-l04","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-l04","name":"南港発電所２号機 — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"gas","tender_type":"capacity_scheme","capacity_mw":591.812,"stage":"awarded","winners":["関西電力株式会社"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: LNG専焼火力. The 591,812 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-l05","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-l05","name":"南港発電所３号機 — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"gas","tender_type":"capacity_scheme","capacity_mw":591.812,"stage":"awarded","winners":["関西電力株式会社"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: LNG専焼火力. The 591,812 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-l06","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-l06","name":"柳井発電所新２号機 — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"gas","tender_type":"capacity_scheme","capacity_mw":463.535,"stage":"awarded","winners":["中国電力株式会社"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: LNG専焼火力. The 463,535 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-l07","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-l07","name":"千葉袖ケ浦パワーステーション — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"gas","tender_type":"capacity_scheme","capacity_mw":604.831,"stage":"awarded","winners":["東京瓦斯株式会社"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: LNG専焼火力. The 604,831 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-l08","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-l08","name":"姫路天然ガス発電所３号機 — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"gas","tender_type":"capacity_scheme","capacity_mw":565.78,"stage":"awarded","winners":["大阪瓦斯株式会社"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: LNG専焼火力. The 565,780 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-l09","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-l09","name":"知多火力発電所７号機 — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"gas","tender_type":"capacity_scheme","capacity_mw":589.836,"stage":"awarded","winners":["株式会社ＪＥＲＡ"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: LNG専焼火力. The 589,836 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2023-l10","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2023-l10","name":"知多火力発電所８号機 — FY2023 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"gas","tender_type":"capacity_scheme","capacity_mw":589.836,"stage":"awarded","winners":["株式会社ＪＥＲＡ"],"awarded_on":"2024-04-26","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2024/files/240426_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2023.pdf","note":"LTDA FY2023 — inaugural round, results published 2024-04-26. Technology as OCCTO classifies it: LNG専焼火力. The 589,836 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2024-d01","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2024-d01","name":"東海第二発電所 — FY2024 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"other","tender_type":"capacity_scheme","capacity_mw":1056.0,"stage":"awarded","winners":["日本原子力発電株式会社"],"awarded_on":"2025-04-28","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2025/files/250428_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2024.pdf","note":"LTDA FY2024 — second round, results published 2025-04-28. Technology as OCCTO classifies it: 原子力（既設原子力の安全対策投資）. The 1,056,000 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2024-d02","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2024-d02","name":"泊発電所３号機 — FY2024 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"other","tender_type":"capacity_scheme","capacity_mw":902.107,"stage":"awarded","winners":["北海道電力株式会社"],"awarded_on":"2025-04-28","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2025/files/250428_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2024.pdf","note":"LTDA FY2024 — second round, results published 2025-04-28. Technology as OCCTO classifies it: 原子力（既設原子力の安全対策投資）. The 902,107 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2024-d03","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2024-d03","name":"奥吉野発電所１号機 — FY2024 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"pumped_hydro","tender_type":"capacity_scheme","capacity_mw":180.323,"stage":"awarded","winners":["関西電力株式会社"],"awarded_on":"2025-04-28","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2025/files/250428_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2024.pdf","note":"LTDA FY2024 — second round, results published 2025-04-28. Technology as OCCTO classifies it: 揚水（運転継続時間が6時間以上). The 180,323 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2024-d04","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2024-d04","name":"奥吉野発電所２号機 — FY2024 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"pumped_hydro","tender_type":"capacity_scheme","capacity_mw":180.323,"stage":"awarded","winners":["関西電力株式会社"],"awarded_on":"2025-04-28","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2025/files/250428_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2024.pdf","note":"LTDA FY2024 — second round, results published 2025-04-28. Technology as OCCTO classifies it: 揚水（運転継続時間が6時間以上). The 180,323 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2024-d05","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2024-d05","name":"西条発電所１号機 — FY2024 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"other","tender_type":"capacity_scheme","capacity_mw":94.6,"stage":"awarded","winners":["四国電力株式会社"],"awarded_on":"2025-04-28","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2025/files/250428_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2024.pdf","note":"LTDA FY2024 — second round, results published 2025-04-28. Technology as OCCTO classifies it: 既設火力の改修（アンモニア混焼への改修）. The 94,600 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2024-d06","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2024-d06","name":"諸塚発電所 一般 — FY2024 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"hydro","tender_type":"capacity_scheme","capacity_mw":51.8,"stage":"awarded","winners":["九州電力株式会社"],"awarded_on":"2025-04-28","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2025/files/250428_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2024.pdf","note":"LTDA FY2024 — second round, results published 2025-04-28. Technology as OCCTO classifies it: 水力（調整式）. The 51,800 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2024-d07","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2024-d07","name":"Shizen-601系統用蓄電池プロジェクト — FY2024 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":47.226,"stage":"awarded","winners":["自然電力株式会社"],"awarded_on":"2025-04-28","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2025/files/250428_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2024.pdf","note":"LTDA FY2024 — second round, results published 2025-04-28. Technology as OCCTO classifies it: 蓄電池（運転継続時間が6時間以上）. The 47,226 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2024-d08","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2024-d08","name":"柏崎刈羽原子力発電所６号機 — FY2024 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"other","tender_type":"capacity_scheme","capacity_mw":1195.0,"stage":"awarded","winners":["東京電力ホールディングス株式会社"],"awarded_on":"2025-04-28","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2025/files/250428_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2024.pdf","note":"LTDA FY2024 — second round, results published 2025-04-28. Technology as OCCTO classifies it: 原子力（既設原子力の安全対策投資）. The 1,195,000 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2024-d09","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2024-d09","name":"Battery No.22蓄電所 — FY2024 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":129.797,"stage":"awarded","winners":["Bison energy株式会社"],"awarded_on":"2025-04-28","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2025/files/250428_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2024.pdf","note":"LTDA FY2024 — second round, results published 2025-04-28. Technology as OCCTO classifies it: 蓄電池（運転継続時間が6時間以上）. The 129,797 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2024-d10","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2024-d10","name":"Battery No.31蓄電所 — FY2024 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":37.827,"stage":"awarded","winners":["Bison energy株式会社"],"awarded_on":"2025-04-28","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2025/files/250428_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2024.pdf","note":"LTDA FY2024 — second round, results published 2025-04-28. Technology as OCCTO classifies it: 蓄電池（運転継続時間が3時間以上6時間未満）. The 37,827 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2024-d11","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2024-d11","name":"Battery No.32蓄電所 — FY2024 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":30.129,"stage":"awarded","winners":["Bison energy株式会社"],"awarded_on":"2025-04-28","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2025/files/250428_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2024.pdf","note":"LTDA FY2024 — second round, results published 2025-04-28. Technology as OCCTO classifies it: 蓄電池（運転継続時間が3時間以上6時間未満）. The 30,129 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2024-d12","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2024-d12","name":"BS浪江 — FY2024 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":49.905,"stage":"awarded","winners":["ＢＳホールディングス株式会社"],"awarded_on":"2025-04-28","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2025/files/250428_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2024.pdf","note":"LTDA FY2024 — second round, results published 2025-04-28. Technology as OCCTO classifies it: 蓄電池（運転継続時間が3時間以上6時間未満）. The 49,905 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2024-d13","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2024-d13","name":"（仮称）Eshi BEES1 — FY2024 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":119.266,"stage":"awarded","winners":["日本蓄電株式会社"],"awarded_on":"2025-04-28","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2025/files/250428_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2024.pdf","note":"LTDA FY2024 — second round, results published 2025-04-28. Technology as OCCTO classifies it: 蓄電池（運転継続時間が3時間以上6時間未満）. The 119,266 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2024-d14","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2024-d14","name":"（仮称）津山杉宮系統用蓄電所 — FY2024 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":88.654,"stage":"awarded","winners":["イーディーエフ・ジャパン株式会社"],"awarded_on":"2025-04-28","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2025/files/250428_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2024.pdf","note":"LTDA FY2024 — second round, results published 2025-04-28. Technology as OCCTO classifies it: 蓄電池（運転継続時間が3時間以上6時間未満）. The 88,654 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2024-d15","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2024-d15","name":"Risu-101蓄電所 — FY2024 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":78.922,"stage":"awarded","winners":["Risu Energy Development Holdings株式会社"],"awarded_on":"2025-04-28","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2025/files/250428_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2024.pdf","note":"LTDA FY2024 — second round, results published 2025-04-28. Technology as OCCTO classifies it: 蓄電池（運転継続時間が3時間以上6時間未満）. The 78,922 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2024-d16","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2024-d16","name":"Risu-203蓄電所 — FY2024 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":40.705,"stage":"awarded","winners":["Risu Energy Development Holdings株式会社"],"awarded_on":"2025-04-28","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2025/files/250428_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2024.pdf","note":"LTDA FY2024 — second round, results published 2025-04-28. Technology as OCCTO classifies it: 蓄電池（運転継続時間が3時間以上6時間未満）. The 40,705 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2024-d17","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2024-d17","name":"Risu-301蓄電所 — FY2024 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":77.545,"stage":"awarded","winners":["Risu Energy Development Holdings株式会社"],"awarded_on":"2025-04-28","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2025/files/250428_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2024.pdf","note":"LTDA FY2024 — second round, results published 2025-04-28. Technology as OCCTO classifies it: 蓄電池（運転継続時間が3時間以上6時間未満）. The 77,545 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2024-d18","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2024-d18","name":"Risu-502蓄電所 — FY2024 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":39.832,"stage":"awarded","winners":["Risu Energy Development Holdings株式会社"],"awarded_on":"2025-04-28","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2025/files/250428_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2024.pdf","note":"LTDA FY2024 — second round, results published 2025-04-28. Technology as OCCTO classifies it: 蓄電池（運転継続時間が3時間以上6時間未満）. The 39,832 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2024-d19","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2024-d19","name":"青葉第一蓄電所 — FY2024 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":29.195,"stage":"awarded","winners":["合同会社青葉電力"],"awarded_on":"2025-04-28","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2025/files/250428_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2024.pdf","note":"LTDA FY2024 — second round, results published 2025-04-28. Technology as OCCTO classifies it: 蓄電池（運転継続時間が3時間以上6時間未満）. The 29,195 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2024-d20","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2024-d20","name":"青葉第二蓄電所 — FY2024 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":25.953,"stage":"awarded","winners":["合同会社青葉電力"],"awarded_on":"2025-04-28","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2025/files/250428_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2024.pdf","note":"LTDA FY2024 — second round, results published 2025-04-28. Technology as OCCTO classifies it: 蓄電池（運転継続時間が3時間以上6時間未満）. The 25,953 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2024-d21","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2024-d21","name":"青葉第五蓄電所 — FY2024 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":25.953,"stage":"awarded","winners":["合同会社青葉電力"],"awarded_on":"2025-04-28","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2025/files/250428_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2024.pdf","note":"LTDA FY2024 — second round, results published 2025-04-28. Technology as OCCTO classifies it: 蓄電池（運転継続時間が3時間以上6時間未満）. The 25,953 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2024-d22","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2024-d22","name":"青葉第六蓄電所 — FY2024 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":25.784,"stage":"awarded","winners":["合同会社青葉電力"],"awarded_on":"2025-04-28","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2025/files/250428_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2024.pdf","note":"LTDA FY2024 — second round, results published 2025-04-28. Technology as OCCTO classifies it: 蓄電池（運転継続時間が3時間以上6時間未満）. The 25,784 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2024-d23","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2024-d23","name":"室蘭蓄電システム — FY2024 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":46.27,"stage":"awarded","winners":["合同会社リチャージャブルエナジー"],"awarded_on":"2025-04-28","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2025/files/250428_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2024.pdf","note":"LTDA FY2024 — second round, results published 2025-04-28. Technology as OCCTO classifies it: 蓄電池（運転継続時間が6時間以上）. The 46,270 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2024-d24","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2024-d24","name":"石巻蓄電システム — FY2024 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":25.953,"stage":"awarded","winners":["合同会社リチャージャブルエナジー"],"awarded_on":"2025-04-28","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2025/files/250428_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2024.pdf","note":"LTDA FY2024 — second round, results published 2025-04-28. Technology as OCCTO classifies it: 蓄電池（運転継続時間が3時間以上6時間未満）. The 25,953 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2024-d25","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2024-d25","name":"SRE北海道G — FY2024 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":46.27,"stage":"awarded","winners":["合同会社SRE"],"awarded_on":"2025-04-28","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2025/files/250428_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2024.pdf","note":"LTDA FY2024 — second round, results published 2025-04-28. Technology as OCCTO classifies it: 蓄電池（運転継続時間が6時間以上）. The 46,270 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2024-d26","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2024-d26","name":"SRE山形県B — FY2024 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":29.195,"stage":"awarded","winners":["合同会社SRE"],"awarded_on":"2025-04-28","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2025/files/250428_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2024.pdf","note":"LTDA FY2024 — second round, results published 2025-04-28. Technology as OCCTO classifies it: 蓄電池（運転継続時間が3時間以上6時間未満）. The 29,195 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2024-d27","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2024-d27","name":"SRE秋田県F — FY2024 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":38.93,"stage":"awarded","winners":["合同会社SRE"],"awarded_on":"2025-04-28","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2025/files/250428_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2024.pdf","note":"LTDA FY2024 — second round, results published 2025-04-28. Technology as OCCTO classifies it: 蓄電池（運転継続時間が3時間以上6時間未満）. The 38,930 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2024-d28","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2024-d28","name":"しろくま03 — FY2024 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":36.554,"stage":"awarded","winners":["合同会社しろくま電力02"],"awarded_on":"2025-04-28","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2025/files/250428_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2024.pdf","note":"LTDA FY2024 — second round, results published 2025-04-28. Technology as OCCTO classifies it: 蓄電池（運転継続時間が3時間以上6時間未満）. The 36,554 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2024-d29","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2024-d29","name":"しろくま04 — FY2024 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":46.591,"stage":"awarded","winners":["合同会社しろくま電力02"],"awarded_on":"2025-04-28","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2025/files/250428_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2024.pdf","note":"LTDA FY2024 — second round, results published 2025-04-28. Technology as OCCTO classifies it: 蓄電池（運転継続時間が6時間以上）. The 46,591 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2024-d30","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2024-d30","name":"福島富岡第２蓄電所 — FY2024 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":40.582,"stage":"awarded","winners":["合同会社スター1号"],"awarded_on":"2025-04-28","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2025/files/250428_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2024.pdf","note":"LTDA FY2024 — second round, results published 2025-04-28. Technology as OCCTO classifies it: 蓄電池（運転継続時間が3時間以上6時間未満）. The 40,582 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2024-d31","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2024-d31","name":"青森十和田蓄電所 — FY2024 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":40.566,"stage":"awarded","winners":["合同会社スター1号"],"awarded_on":"2025-04-28","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2025/files/250428_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2024.pdf","note":"LTDA FY2024 — second round, results published 2025-04-28. Technology as OCCTO classifies it: 蓄電池（運転継続時間が3時間以上6時間未満）. The 40,566 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2024-d32","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2024-d32","name":"青森階上蓄電所 — FY2024 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":40.501,"stage":"awarded","winners":["合同会社スター1号"],"awarded_on":"2025-04-28","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2025/files/250428_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2024.pdf","note":"LTDA FY2024 — second round, results published 2025-04-28. Technology as OCCTO classifies it: 蓄電池（運転継続時間が3時間以上6時間未満）. The 40,501 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2024-d33","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2024-d33","name":"青森八戸蓄電所 — FY2024 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":92.548,"stage":"awarded","winners":["合同会社スター2号"],"awarded_on":"2025-04-28","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2025/files/250428_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2024.pdf","note":"LTDA FY2024 — second round, results published 2025-04-28. Technology as OCCTO classifies it: 蓄電池（運転継続時間が6時間以上）. The 92,548 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2024-d34","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2024-d34","name":"北海道北見蓄電所 — FY2024 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"battery","tender_type":"standalone_bess","capacity_mw":39.383,"stage":"awarded","winners":["合同会社スター4号"],"awarded_on":"2025-04-28","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2025/files/250428_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2024.pdf","note":"LTDA FY2024 — second round, results published 2025-04-28. Technology as OCCTO classifies it: 蓄電池（運転継続時間が3時間以上6時間未満）. The 39,383 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2024-l01","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2024-l01","name":"石狩湾新港発電所3号機 — FY2024 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"gas","tender_type":"capacity_scheme","capacity_mw":551.217,"stage":"awarded","winners":["北海道電力株式会社"],"awarded_on":"2025-04-28","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2025/files/250428_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2024.pdf","note":"LTDA FY2024 — second round, results published 2025-04-28. Technology as OCCTO classifies it: LNG専焼火力. The 551,217 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2024-l02","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2024-l02","name":"坂出発電所５号機 — FY2024 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"gas","tender_type":"capacity_scheme","capacity_mw":561.263,"stage":"awarded","winners":["四国電力株式会社"],"awarded_on":"2025-04-28","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2025/files/250428_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2024.pdf","note":"LTDA FY2024 — second round, results published 2025-04-28. Technology as OCCTO classifies it: LNG専焼火力. The 561,263 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2024-l03","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2024-l03","name":"ゼロワットパワー市原発電所 — FY2024 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"gas","tender_type":"capacity_scheme","capacity_mw":100.55,"stage":"awarded","winners":["ゼロワットパワー株式会社"],"awarded_on":"2025-04-28","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2025/files/250428_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2024.pdf","note":"LTDA FY2024 — second round, results published 2025-04-28. Technology as OCCTO classifies it: LNG専焼火力. The 100,550 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2024-l04","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2024-l04","name":"(仮称)ガス火力発電所 — FY2024 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"gas","tender_type":"capacity_scheme","capacity_mw":101.614,"stage":"awarded","winners":["東邦瓦斯株式会社"],"awarded_on":"2025-04-28","source":"https://www.occto.or.jp/assets/market-board/market/oshirase/2025/files/250428_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2024.pdf","note":"LTDA FY2024 — second round, results published 2025-04-28. Technology as OCCTO classifies it: LNG専焼火力. The 101,614 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2025-d01","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2025-d01","name":"大間原子力発電所 — FY2025 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"other","tender_type":"capacity_scheme","capacity_mw":1381.275,"stage":"awarded","winners":["電源開発株式会社"],"awarded_on":"2026-05-13","source":"https://www.occto.or.jp/assets/various/capacity-market/jitsujukyukanren/2025_boshuyoukou_long/260513_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2025.pdf","note":"LTDA FY2025 — third round, six-hour duration requirement, results published 2026-05-13. Technology as OCCTO classifies it: 原子力. The 1,381,275 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2025-d02","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2025-d02","name":"イーレックス新潟（仮称） — FY2025 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"other","tender_type":"capacity_scheme","capacity_mw":100.926,"stage":"awarded","winners":["イーレックス株式会社"],"awarded_on":"2026-05-13","source":"https://www.occto.or.jp/assets/various/capacity-market/jitsujukyukanren/2025_boshuyoukou_long/260513_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2025.pdf","note":"LTDA FY2025 — third round, six-hour duration requirement, results published 2026-05-13. Technology as OCCTO classifies it: バイオマス専焼. The 100,926 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"tender-jp-ltda-fy2025-d03","record_type":"tender","jurisdiction":"JP","data":{"id":"tender-jp-ltda-fy2025-d03","name":"泊発電所1号機 — FY2025 LTDA award","issuer":"OCCTO","country":"Japan","jurisdiction":"JP","asset_class":"other","tender_type":"capacity_scheme","capacity_mw":557.848,"stage":"awarded","winners":["北海道電力株式会社"],"awarded_on":"2026-05-13","source":"https://www.occto.or.jp/assets/various/capacity-market/jitsujukyukanren/2025_boshuyoukou_long/260513_longauction_youryouyakujokekka_kouhyou_besshi_ousatsu2025.pdf","note":"LTDA FY2025 — third round, six-hour duration requirement, results published 2026-05-13. Technology as OCCTO classifies it: 原子力（既設原子力の安全対策投資）. The 557,848 kW is 落札容量 — a DERATED 期待容量 award, NOT the plant's nameplate, which OCCTO does not publish here (Eku's Eshi is 119,266 kW awarded against 150 MW nameplate). Carries a 20-year fixed-revenue capacity contract. No site, energy rating or commissioning date is stated, so none is recorded."},"source_url":"https://www.occto.or.jp/market-board/market/oshirase/2025/2025_boshuyoukou_long.html","publisher":"OCCTO (Organisation for Cross-regional Coordination of Transmission Operators)","fetched_at":"2026-09-12T14:23:45.883714+00:00","confidence":"high"},{"entity_id":"duid-adpba1","record_type":"unit","jurisdiction":"AU-SA","data":{"id":"duid-adpba1","duid":"ADPBA1","station":"Adelaide Desalination Plant","station_key":"adelaide-desalination-plant","participant":"South Australian Water Corporation","region":"SA1","state":"SA","country":"Australia","jurisdiction":"AU-SA","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":7.76,"max_capacity_mw":6.15,"storage_mwh":6.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-balb1","record_type":"unit","jurisdiction":"AU-VIC","data":{"id":"duid-balb1","duid":"BALB1","station":"Ballarat Battery Energy Storage System","station_key":"ballarat","participant":"EnergyAustralia Pty Ltd","region":"VIC1","state":"VIC","country":"Australia","jurisdiction":"AU-VIC","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":30.0,"max_capacity_mw":30.0,"storage_mwh":30.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-bbattery1","record_type":"unit","jurisdiction":"AU-QLD","data":{"id":"duid-bbattery1","duid":"BBATTERY1","station":"Bouldercombe Battery Project","station_key":"bouldercombe-project","participant":"Bouldercombe Battery Project Co Pty Ltd as trustee for Bouldercombe Battery Project Trust","region":"QLD1","state":"QLD","country":"Australia","jurisdiction":"AU-QLD","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":67.0,"max_capacity_mw":50.0,"storage_mwh":100.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-bhb1","record_type":"unit","jurisdiction":"AU-NSW","data":{"id":"duid-bhb1","duid":"BHB1","station":"Broken Hill Battery Energy Storage System","station_key":"broken-hill","participant":"AGL Macquarie Pty Limited","region":"NSW1","state":"NSW","country":"Australia","jurisdiction":"AU-NSW","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":66.0,"max_capacity_mw":50.0,"storage_mwh":50.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-blythb1","record_type":"unit","jurisdiction":"AU-SA","data":{"id":"duid-blythb1","duid":"BLYTHB1","station":"Blyth Battery Energy Storage System","station_key":"blyth","participant":"Blyth Battery Pty Ltd as the Trustee for Blyth Battery Trust","region":"SA1","state":"SA","country":"Australia","jurisdiction":"AU-SA","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":281.0,"max_capacity_mw":200.0,"storage_mwh":400.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-bowwba1","record_type":"unit","jurisdiction":"AU-SA","data":{"id":"duid-bowwba1","duid":"BOWWBA1","station":"Bolivar Waste Water Treatment Plant","station_key":"bolivar-waste-water-treatment-plant","participant":"South Australian Water Corporation","region":"SA1","state":"SA","country":"Australia","jurisdiction":"AU-SA","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":3.0,"max_capacity_mw":2.0,"storage_mwh":2.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-brddbes1","record_type":"unit","jurisdiction":"AU-QLD","data":{"id":"duid-brddbes1","duid":"BRDDBES1","station":"Broadsound Energy Park","station_key":"broadsound-park","participant":"Iberdrola Australia Energy Markets Pty Ltd","region":"QLD1","state":"QLD","country":"Australia","jurisdiction":"AU-QLD","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":240.0,"max_capacity_mw":180.0,"storage_mwh":360.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-brndbes1","record_type":"unit","jurisdiction":"AU-QLD","data":{"id":"duid-brndbes1","duid":"BRNDBES1","station":"Brendale BESS","station_key":"brendale","participant":"Brendale Battery ProjectCo Pty Ltd","region":"QLD1","state":"QLD","country":"Australia","jurisdiction":"AU-QLD","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":215.0,"max_capacity_mw":205.0,"storage_mwh":410.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-bulbes1","record_type":"unit","jurisdiction":"AU-VIC","data":{"id":"duid-bulbes1","duid":"BULBES1","station":"Bulgana Green Power Hub","station_key":"bulgana-green-power-hub","participant":"Bulgana Wind Farm Pty Ltd","region":"VIC1","state":"VIC","country":"Australia","jurisdiction":"AU-VIC","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":24.0,"max_capacity_mw":20.0,"storage_mwh":34.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-bungamb1","record_type":"unit","jurisdiction":"AU-SA","data":{"id":"duid-bungamb1","duid":"BUNGAMB1","station":"Bungama Battery Energy Storage System","station_key":"bungama","participant":"Bungama Project (Solar) Operations Pty Ltd as trustee for Bungama Project (Solar) Operations Trust","region":"SA1","state":"SA","country":"Australia","jurisdiction":"AU-SA","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":217.0,"max_capacity_mw":150.0,"storage_mwh":300.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-capbes1","record_type":"unit","jurisdiction":"AU-NSW","data":{"id":"duid-capbes1","duid":"CAPBES1","station":"Capital Battery","station_key":"capital","participant":"Capital Battery Pty Ltd as Trustee for Capital Battery Trust","region":"NSW1","state":"NSW","country":"Australia","jurisdiction":"AU-NSW","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":125.0,"max_capacity_mw":100.0,"storage_mwh":200.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-cbwwba1","record_type":"unit","jurisdiction":"AU-SA","data":{"id":"duid-cbwwba1","duid":"CBWWBA1","station":"Christies Beach Wastewater Treatment Plant","station_key":"christies-beach-wastewater-treatment-plant","participant":"South Australian Water Corporation","region":"SA1","state":"SA","country":"Australia","jurisdiction":"AU-SA","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":2.16,"max_capacity_mw":2.14,"storage_mwh":2.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-cgbess01","record_type":"unit","jurisdiction":"AU-SA","data":{"id":"duid-cgbess01","duid":"CGBESS01","station":"Clements Gap BESS","station_key":"clements-gap","participant":"Pacific Hydro Clements Gap BESS Pty Ltd","region":"SA1","state":"SA","country":"Australia","jurisdiction":"AU-SA","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":90.5,"max_capacity_mw":60.0,"storage_mwh":120.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-chbess1","record_type":"unit","jurisdiction":"AU-QLD","data":{"id":"duid-chbess1","duid":"CHBESS1","station":"Chinchilla BESS, Units 1-80","station_key":"chinchilla","participant":"CS Energy Limited","region":"QLD1","state":"QLD","country":"Australia","jurisdiction":"AU-QLD","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":134.0,"max_capacity_mw":100.0,"storage_mwh":200.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-dalnth1","record_type":"unit","jurisdiction":"AU-SA","data":{"id":"duid-dalnth1","duid":"DALNTH1","station":"Dalrymple North BESS","station_key":"dalrymple-north","participant":"AGL Dalrymple Pty Limited","region":"SA1","state":"SA","country":"Australia","jurisdiction":"AU-SA","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":30.0,"max_capacity_mw":30.0,"storage_mwh":12.2,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-dpntb1","record_type":"unit","jurisdiction":"AU-NSW","data":{"id":"duid-dpntb1","duid":"DPNTB1","station":"Darlington Point Energy Storage System","station_key":"darlington-point","participant":"EnergyAustralia Pty Ltd","region":"NSW1","state":"NSW","country":"Australia","jurisdiction":"AU-NSW","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":25.0,"max_capacity_mw":25.0,"storage_mwh":50.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-erb01","record_type":"unit","jurisdiction":"AU-NSW","data":{"id":"duid-erb01","duid":"ERB01","station":"Eraring Battery Energy Storage System","station_key":"eraring","participant":"Origin Energy Electricity Limited","region":"NSW1","state":"NSW","country":"Australia","jurisdiction":"AU-NSW","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":614.6,"max_capacity_mw":460.0,"storage_mwh":1997.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-erb02","record_type":"unit","jurisdiction":"AU-NSW","data":{"id":"duid-erb02","duid":"ERB02","station":"Eraring Battery Energy Storage System 2","station_key":"eraring-2","participant":"Origin Energy Electricity Limited","region":"NSW1","state":"NSW","country":"Australia","jurisdiction":"AU-NSW","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":351.0,"max_capacity_mw":240.0,"storage_mwh":1390.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-gannb1","record_type":"unit","jurisdiction":"AU-VIC","data":{"id":"duid-gannb1","duid":"GANNB1","station":"Gannawarra Energy Storage System","station_key":"gannawarra","participant":"EnergyAustralia Pty Ltd","region":"VIC1","state":"VIC","country":"Australia","jurisdiction":"AU-VIC","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":30.0,"max_capacity_mw":30.0,"storage_mwh":49.85,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-greenb1","record_type":"unit","jurisdiction":"AU-QLD","data":{"id":"duid-greenb1","duid":"GREENB1","station":"Greenbank BESS","station_key":"greenbank","participant":"CS Energy Limited","region":"QLD1","state":"QLD","country":"Australia","jurisdiction":"AU-QLD","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":259.2,"max_capacity_mw":200.0,"storage_mwh":400.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-hbess1","record_type":"unit","jurisdiction":"AU-VIC","data":{"id":"duid-hbess1","duid":"HBESS1","station":"Hazelwood Battery Energy Storage System","station_key":"hazelwood","participant":"Hazelwood BESS Project Co Pty Ltd as Trustee for the HBESS Asset Trust","region":"VIC1","state":"VIC","country":"Australia","jurisdiction":"AU-VIC","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":200.0,"max_capacity_mw":150.0,"storage_mwh":150.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-hpr1","record_type":"unit","jurisdiction":"AU-SA","data":{"id":"duid-hpr1","duid":"HPR1","station":"Hornsdale Power Reserve","station_key":"hornsdale-power-reserve","participant":"Hornsdale Power Reserve Pty Ltd","region":"SA1","state":"SA","country":"Australia","jurisdiction":"AU-SA","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":150.0,"max_capacity_mw":150.0,"storage_mwh":194.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-hvwwba1","record_type":"unit","jurisdiction":"AU-SA","data":{"id":"duid-hvwwba1","duid":"HVWWBA1","station":"Happy Valley Water Treatment Plant","station_key":"happy-valley-water-treatment-plant","participant":"South Australian Water Corporation","region":"SA1","state":"SA","country":"Australia","jurisdiction":"AU-SA","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":5.0,"max_capacity_mw":4.0,"storage_mwh":4.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-kepbg1","record_type":"unit","jurisdiction":"AU-QLD","data":{"id":"duid-kepbg1","duid":"KEPBG1","station":"Kennedy Energy Park Battery","station_key":"kennedy-park","participant":"Kennedy Energy Park Pty Ltd","region":"QLD1","state":"QLD","country":"Australia","jurisdiction":"AU-QLD","dispatch_type":"Generating Unit","classification":"Non-Scheduled","registered_mw":2.0,"max_capacity_mw":2.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-kepbl1","record_type":"unit","jurisdiction":"AU-QLD","data":{"id":"duid-kepbl1","duid":"KEPBL1","station":"Kennedy Energy Park Battery","station_key":"kennedy-park","participant":"Kennedy Energy Park Pty Ltd","region":"QLD1","state":"QLD","country":"Australia","jurisdiction":"AU-QLD","dispatch_type":"Load","classification":"Non-Scheduled","registered_mw":2.0,"max_capacity_mw":2.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-kessb1","record_type":"unit","jurisdiction":"AU-VIC","data":{"id":"duid-kessb1","duid":"KESSB1","station":"Koorangie Energy Storage System","station_key":"koorangie","participant":"Shell Energy Retail Pty Ltd","region":"VIC1","state":"VIC","country":"Australia","jurisdiction":"AU-VIC","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":185.0,"max_capacity_mw":185.0,"storage_mwh":370.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-lbb1","record_type":"unit","jurisdiction":"AU-SA","data":{"id":"duid-lbb1","duid":"LBB1","station":"Lake Bonney BESS1","station_key":"lake-bonney","participant":"Lake Bonney Wind Power Pty Ltd","region":"SA1","state":"SA","country":"Australia","jurisdiction":"AU-SA","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":25.0,"max_capacity_mw":25.0,"storage_mwh":52.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-ldbess1","record_type":"unit","jurisdiction":"AU-NSW","data":{"id":"duid-ldbess1","duid":"LDBESS1","station":"Liddell Battery Energy Storage System","station_key":"liddell","participant":"AGL Liddell BESS Pty Ltd","region":"NSW1","state":"NSW","country":"Australia","jurisdiction":"AU-NSW","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":755.08,"max_capacity_mw":500.0,"storage_mwh":1086.2,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-lgapbs1","record_type":"unit","jurisdiction":"AU-SA","data":{"id":"duid-lgapbs1","duid":"LGAPBS1","station":"Lincoln Gap Wind Farm Battery","station_key":"lincoln-gap-wind-farm","participant":"Lincoln Gap Wind Farm (Operations) Pty Ltd","region":"SA1","state":"SA","country":"Australia","jurisdiction":"AU-SA","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":10.8,"max_capacity_mw":9.0,"storage_mwh":10.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-limbess1","record_type":"unit","jurisdiction":"AU-NSW","data":{"id":"duid-limbess1","duid":"LIMBESS1","station":"Limondale Battery","station_key":"limondale","participant":"Limondale Battery Pty. Ltd.","region":"NSW1","state":"NSW","country":"Australia","jurisdiction":"AU-NSW","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":141.0,"max_capacity_mw":50.0,"storage_mwh":536.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-lves1","record_type":"unit","jurisdiction":"AU-VIC","data":{"id":"duid-lves1","duid":"LVES1","station":"Latrobe Valley BESS","station_key":"latrobe-valley","participant":"Latrobe Valley BESS as the Trustee for Latrobe Valley BESS Project Trust","region":"VIC1","state":"VIC","country":"Australia","jurisdiction":"AU-VIC","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":140.0,"max_capacity_mw":100.0,"storage_mwh":200.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-mannumb1","record_type":"unit","jurisdiction":"AU-SA","data":{"id":"duid-mannumb1","duid":"MANNUMB1","station":"Mannum Battery Energy Storage System","station_key":"mannum","participant":"Mannum Stage 2 Battery SubCo Pty Ltd as trustee for the Mannum Stage 2 Battery Unit Trust","region":"SA1","state":"SA","country":"Australia","jurisdiction":"AU-SA","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":131.7,"max_capacity_mw":100.0,"storage_mwh":200.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-mlb01","record_type":"unit","jurisdiction":"AU-NSW","data":{"id":"duid-mlb01","duid":"MLB01","station":"Mortlake Battery Energy Storage System","station_key":"mortlake","participant":"Origin Energy Electricity Limited","region":"NSW1","state":"NSW","country":"Australia","jurisdiction":"AU-NSW","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":440.0,"max_capacity_mw":300.0,"storage_mwh":650.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-moorabs1","record_type":"unit","jurisdiction":"AU-VIC","data":{"id":"duid-moorabs1","duid":"MOORABS1","station":"Moorabool Wind Farm","station_key":"moorabool-wind-farm","participant":"Moorabool Wind Farm Interface Company Pty Ltd","region":"VIC1","state":"VIC","country":"Australia","jurisdiction":"AU-VIC","dispatch_type":"Bidirectional Unit","classification":"Non-Scheduled","registered_mw":2.0,"max_capacity_mw":2.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-mreha1","record_type":"unit","jurisdiction":"AU-VIC","data":{"id":"duid-mreha1","duid":"MREHA1","station":"Melbourne Renewable Energy Hub Connection A1","station_key":"melbourne-renewable-hub-connection-a1","participant":"Equis Energy (Australia) Projects (MREH A1 AssetCo) Pty Ltd as trustee for Equis Energy (Australia) MREH A1 Asset Trust","region":"VIC1","state":"VIC","country":"Australia","jurisdiction":"AU-VIC","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":215.8,"max_capacity_mw":200.0,"storage_mwh":400.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-mreha2","record_type":"unit","jurisdiction":"AU-VIC","data":{"id":"duid-mreha2","duid":"MREHA2","station":"Melbourne Renewable Energy Hub Connection A2","station_key":"melbourne-renewable-hub-connection-a2","participant":"Equis Energy (Australia) Projects (MREH A2 AssetCo) Pty Ltd as The Trustee for Equis Energy (Australia) MREH A2 Asset Trust","region":"VIC1","state":"VIC","country":"Australia","jurisdiction":"AU-VIC","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":215.8,"max_capacity_mw":200.0,"storage_mwh":400.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-mreha3","record_type":"unit","jurisdiction":"AU-VIC","data":{"id":"duid-mreha3","duid":"MREHA3","station":"Melbourne Renewable Energy Hub Connection A3","station_key":"melbourne-renewable-hub-connection-a3","participant":"SEC Energy Pty Ltd","region":"VIC1","state":"VIC","country":"Australia","jurisdiction":"AU-VIC","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":215.4,"max_capacity_mw":200.0,"storage_mwh":800.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-mrnbess1","record_type":"unit","jurisdiction":"AU-VIC","data":{"id":"duid-mrnbess1","duid":"MRNBESS1","station":"Mornington BESS","station_key":"mornington","participant":"Mornington BESS Project Pty Ltd as trustee for the Mornington BESS Project Trust","region":"VIC1","state":"VIC","country":"Australia","jurisdiction":"AU-VIC","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":336.0,"max_capacity_mw":240.0,"storage_mwh":590.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-nesbess1","record_type":"unit","jurisdiction":"AU-NSW","data":{"id":"duid-nesbess1","duid":"NESBESS1","station":"New England BESS","station_key":"new-england","participant":"NESF BESS 1 Pty Ltd as The Trustee for NESF BESS 1 Trust","region":"NSW1","state":"NSW","country":"Australia","jurisdiction":"AU-NSW","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":126.0,"max_capacity_mw":100.0,"storage_mwh":0.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-nesbess2","record_type":"unit","jurisdiction":"AU-NSW","data":{"id":"duid-nesbess2","duid":"NESBESS2","station":"New England BESS","station_key":"new-england","participant":"NESF BESS 1 Pty Ltd as The Trustee for NESF BESS 1 Trust","region":"NSW1","state":"NSW","country":"Australia","jurisdiction":"AU-NSW","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":126.0,"max_capacity_mw":100.0,"storage_mwh":0.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-orabess1","record_type":"unit","jurisdiction":"AU-NSW","data":{"id":"duid-orabess1","duid":"ORABESS1","station":"Orana BESS","station_key":"orana","participant":"Orana ProjectCo Pty Ltd as trustee for Orana Project Trust","region":"NSW1","state":"NSW","country":"Australia","jurisdiction":"AU-NSW","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":439.0,"max_capacity_mw":415.0,"storage_mwh":1660.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-pibess1","record_type":"unit","jurisdiction":"AU-VIC","data":{"id":"duid-pibess1","duid":"PIBESS1","station":"Phillip Island BESS","station_key":"phillip-island","participant":"Mondo Metering Pty Ltd","region":"VIC1","state":"VIC","country":"Australia","jurisdiction":"AU-VIC","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":7.0,"max_capacity_mw":5.0,"storage_mwh":11.93,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-plbess1","record_type":"unit","jurisdiction":"AU-VIC","data":{"id":"duid-plbess1","duid":"PLBESS1","station":"Pine Lodge BESS","station_key":"pine-lodge","participant":"Energy Storage Project No 6 Pty Ltd as trustee for the Energy Storage Project No 6 Unit Trust","region":"VIC1","state":"VIC","country":"Australia","jurisdiction":"AU-VIC","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":344.4,"max_capacity_mw":250.0,"storage_mwh":600.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-qbynb1","record_type":"unit","jurisdiction":"AU-NSW","data":{"id":"duid-qbynb1","duid":"QBYNB1","station":"Queanbeyan BESS","station_key":"queanbeyan","participant":"Berrybank 2 Asset Pty Ltd as trustee for Berrybank 2 Asset Trust","region":"NSW1","state":"NSW","country":"Australia","jurisdiction":"AU-NSW","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":10.0,"max_capacity_mw":10.0,"storage_mwh":20.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-qpsfb2","record_type":"unit","jurisdiction":"AU-NSW","data":{"id":"duid-qpsfb2","duid":"QPSFB2","station":"Quorn Park Solar Hybrid","station_key":"quorn-park-solar-hybrid","participant":"Quorn Park Solar Hybrid Pty Ltd as trustee for the Quorn Park Solar Hybrid Trust","region":"NSW1","state":"NSW","country":"Australia","jurisdiction":"AU-NSW","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":27.0,"max_capacity_mw":19.0,"storage_mwh":40.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-rangeb1","record_type":"unit","jurisdiction":"AU-VIC","data":{"id":"duid-rangeb1","duid":"RANGEB1","station":"Rangebank BESS","station_key":"rangebank","participant":"Shell Energy Retail Pty Ltd","region":"VIC1","state":"VIC","country":"Australia","jurisdiction":"AU-VIC","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":260.0,"max_capacity_mw":200.0,"storage_mwh":400.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-ress1","record_type":"unit","jurisdiction":"AU-NSW","data":{"id":"duid-ress1","duid":"RESS1","station":"Riverina Energy Storage System 1","station_key":"riverina-1","participant":"Shell Energy Retail Pty Ltd","region":"NSW1","state":"NSW","country":"Australia","jurisdiction":"AU-NSW","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":80.0,"max_capacity_mw":60.0,"storage_mwh":120.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-rivnb2","record_type":"unit","jurisdiction":"AU-NSW","data":{"id":"duid-rivnb2","duid":"RIVNB2","station":"Riverena Energy Storage System 2","station_key":"riverena-2","participant":"EnergyAustralia Pty Ltd","region":"NSW1","state":"NSW","country":"Australia","jurisdiction":"AU-NSW","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":65.0,"max_capacity_mw":65.0,"storage_mwh":130.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-smfbess1","record_type":"unit","jurisdiction":"AU-SA","data":{"id":"duid-smfbess1","duid":"SMFBESS1","station":"Summerfield BESS 1","station_key":"summerfield-1","participant":"CI Summerfield BESS Pty Ltd as the Trustee for CI Summerfield BESS Trust","region":"SA1","state":"SA","country":"Australia","jurisdiction":"AU-SA","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":153.65,"max_capacity_mw":120.0,"storage_mwh":480.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-smfbess2","record_type":"unit","jurisdiction":"AU-SA","data":{"id":"duid-smfbess2","duid":"SMFBESS2","station":"Summerfield BESS 2","station_key":"summerfield-2","participant":"CI Summerfield BESS Pty Ltd as the Trustee for CI Summerfield BESS Trust","region":"SA1","state":"SA","country":"Australia","jurisdiction":"AU-SA","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":153.65,"max_capacity_mw":120.0,"storage_mwh":480.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-smthbes1","record_type":"unit","jurisdiction":"AU-NSW","data":{"id":"duid-smthbes1","duid":"SMTHBES1","station":"Smithfield Battery Energy Storage System, Units 1 - 36","station_key":"smithfield","participant":"Smithfield BESS Pty Limited","region":"NSW1","state":"NSW","country":"Australia","jurisdiction":"AU-NSW","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":69.4,"max_capacity_mw":65.0,"storage_mwh":130.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-snb01","record_type":"unit","jurisdiction":"AU-QLD","data":{"id":"duid-snb01","duid":"SNB01","station":"Supernode BESS","station_key":"supernode","participant":"Supernode Operations Pty Ltd as the trustee for Supernode BESS 1 Project Trust","region":"QLD1","state":"QLD","country":"Australia","jurisdiction":"AU-QLD","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":337.4,"max_capacity_mw":260.0,"storage_mwh":545.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-snb02","record_type":"unit","jurisdiction":"AU-QLD","data":{"id":"duid-snb02","duid":"SNB02","station":"Supernode BESS","station_key":"supernode","participant":"Supernode Operations Pty Ltd as the trustee for Supernode BESS 1 Project Trust","region":"QLD1","state":"QLD","country":"Australia","jurisdiction":"AU-QLD","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":337.4,"max_capacity_mw":260.0,"storage_mwh":1090.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-stabess1","record_type":"unit","jurisdiction":"AU-QLD","data":{"id":"duid-stabess1","duid":"STABESS1","station":"Stanwell Battery Energy Storage System","station_key":"stanwell","participant":"Stanwell Corporation Limited","region":"QLD1","state":"QLD","country":"Australia","jurisdiction":"AU-QLD","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":317.0,"max_capacity_mw":300.0,"storage_mwh":1200.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-swanbbf1","record_type":"unit","jurisdiction":"AU-QLD","data":{"id":"duid-swanbbf1","duid":"SWANBBF1","station":"Swanbank BESS","station_key":"swanbank","participant":"CleanCo Queensland Limited","region":"QLD1","state":"QLD","country":"Australia","jurisdiction":"AU-QLD","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":331.2,"max_capacity_mw":250.0,"storage_mwh":500.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-tarbess1","record_type":"unit","jurisdiction":"AU-QLD","data":{"id":"duid-tarbess1","duid":"TARBESS1","station":"Tarong BESS","station_key":"tarong","participant":"Stanwell Corporation Limited","region":"QLD1","state":"QLD","country":"Australia","jurisdiction":"AU-QLD","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":393.0,"max_capacity_mw":300.0,"storage_mwh":600.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-tb2b1","record_type":"unit","jurisdiction":"AU-SA","data":{"id":"duid-tb2b1","duid":"TB2B1","station":"Tailem Bend 2 Hybrid Renewable Power Station","station_key":"tailem-bend-2-hybrid-renewable-power-station","participant":"Tailem Bend II Project Company Pty Ltd as trustee for the Tailem Bend II Project Trust","region":"SA1","state":"SA","country":"Australia","jurisdiction":"AU-SA","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":50.0,"max_capacity_mw":41.0,"storage_mwh":41.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-tb3b1","record_type":"unit","jurisdiction":"AU-SA","data":{"id":"duid-tb3b1","duid":"TB3B1","station":"Tailem Bend 3 BESS","station_key":"tailem-bend-3","participant":"Tailem Bend III Project Company Pty Ltd as the Trustee for Tailem Bend III Project Trust","region":"SA1","state":"SA","country":"Australia","jurisdiction":"AU-SA","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":263.0,"max_capacity_mw":204.0,"storage_mwh":0.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-tempb1","record_type":"unit","jurisdiction":"AU-SA","data":{"id":"duid-tempb1","duid":"TEMPB1","station":"Templers Battery Energy Storage System","station_key":"templers","participant":"Diamond Energy Pty Ltd","region":"SA1","state":"SA","country":"Australia","jurisdiction":"AU-SA","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":138.0,"max_capacity_mw":111.0,"storage_mwh":285.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-tib1","record_type":"unit","jurisdiction":"AU-SA","data":{"id":"duid-tib1","duid":"TIB1","station":"Torrens Island BESS","station_key":"torrens-island","participant":"AGL SA Generation Pty Limited","region":"SA1","state":"SA","country":"Australia","jurisdiction":"AU-SA","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":250.0,"max_capacity_mw":250.0,"storage_mwh":250.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-trgbess1","record_type":"unit","jurisdiction":"AU-VIC","data":{"id":"duid-trgbess1","duid":"TRGBESS1","station":"Terang BESS","station_key":"terang","participant":"Terrang BESS Asset Co Pty Ltd as the trustee for Terrang BESS Asset trust","region":"VIC1","state":"VIC","country":"Australia","jurisdiction":"AU-VIC","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":144.4,"max_capacity_mw":100.0,"storage_mwh":200.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-ulpbess1","record_type":"unit","jurisdiction":"AU-QLD","data":{"id":"duid-ulpbess1","duid":"ULPBESS1","station":"Ulinda Park BESS","station_key":"ulinda-park","participant":"Ulinda Park ProjectCo Pty Ltd","region":"QLD1","state":"QLD","country":"Australia","jurisdiction":"AU-QLD","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":197.0,"max_capacity_mw":155.0,"storage_mwh":298.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-vbb1","record_type":"unit","jurisdiction":"AU-VIC","data":{"id":"duid-vbb1","duid":"VBB1","station":"Victorian Big Battery","station_key":"victorian","participant":"Victorian Big Battery Pty Ltd as trustee for HMC Energy Transition No. 3 A3 Project Trust","region":"VIC1","state":"VIC","country":"Australia","jurisdiction":"AU-VIC","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":360.0,"max_capacity_mw":300.0,"storage_mwh":450.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-walgrv1","record_type":"unit","jurisdiction":"AU-NSW","data":{"id":"duid-walgrv1","duid":"WALGRV1","station":"Wallgrove BESS 1","station_key":"wallgrove-1","participant":"Iberdrola Australia Wallgrove Pty Limited","region":"NSW1","state":"NSW","country":"Australia","jurisdiction":"AU-NSW","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":50.0,"max_capacity_mw":50.0,"storage_mwh":78.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-wandb1","record_type":"unit","jurisdiction":"AU-QLD","data":{"id":"duid-wandb1","duid":"WANDB1","station":"Wandoan Battery Energy Storage System (BESS)","station_key":"wandoan","participant":"AGL Sales (Queensland Electricity) Pty Limited","region":"QLD1","state":"QLD","country":"Australia","jurisdiction":"AU-QLD","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":123.0,"max_capacity_mw":100.0,"storage_mwh":150.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-wdbess1","record_type":"unit","jurisdiction":"AU-QLD","data":{"id":"duid-wdbess1","duid":"WDBESS1","station":"Western Downs Battery Energy Storage System","station_key":"western-downs","participant":"Western Downs BESS Pty Ltd as trustee for the Western Downs BESS Trust","region":"QLD1","state":"QLD","country":"Australia","jurisdiction":"AU-QLD","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":272.48,"max_capacity_mw":255.0,"storage_mwh":400.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-wdbess2","record_type":"unit","jurisdiction":"AU-QLD","data":{"id":"duid-wdbess2","duid":"WDBESS2","station":"Western Downs Battery Energy Storage System (BESS)","station_key":"western-downs","participant":"Western Downs BESS Pty Ltd as trustee for the Western Downs BESS Trust","region":"QLD1","state":"QLD","country":"Australia","jurisdiction":"AU-QLD","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":269.8,"max_capacity_mw":255.0,"storage_mwh":510.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-willbes1","record_type":"unit","jurisdiction":"AU-NSW","data":{"id":"duid-willbes1","duid":"WILLBES1","station":"Williamsdale BESS","station_key":"williamsdale","participant":"Williamsdale BESS Project Co Pty Ltd as trustee for Williamsdale BESS Project Trust","region":"NSW1","state":"NSW","country":"Australia","jurisdiction":"AU-NSW","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":262.0,"max_capacity_mw":250.0,"storage_mwh":0.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-wooles1","record_type":"unit","jurisdiction":"AU-QLD","data":{"id":"duid-wooles1","duid":"WOOLES1","station":"Woolooga BESS","station_key":"woolooga","participant":"Woolooga BESS Fund Pty Limited As Trustee for the Woolooga BESS Trust","region":"QLD1","state":"QLD","country":"Australia","jurisdiction":"AU-QLD","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":280.0,"max_capacity_mw":222.0,"storage_mwh":593.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-woorb1","record_type":"unit","jurisdiction":"AU-VIC","data":{"id":"duid-woorb1","duid":"WOORB1","station":"Wooreen Battery Energy Storage System","station_key":"wooreen","participant":"EnergyAustralia Pty Ltd","region":"VIC1","state":"VIC","country":"Australia","jurisdiction":"AU-VIC","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":491.0,"max_capacity_mw":350.0,"storage_mwh":0.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"},{"entity_id":"duid-wtahb1","record_type":"unit","jurisdiction":"AU-NSW","data":{"id":"duid-wtahb1","duid":"WTAHB1","station":"Waratah Super Battery","station_key":"waratah-super","participant":"Munmorah Battery ProjectCo Pty Ltd","region":"NSW1","state":"NSW","country":"Australia","jurisdiction":"AU-NSW","dispatch_type":"Bidirectional Unit","classification":"Scheduled","registered_mw":1095.84,"max_capacity_mw":850.0,"storage_mwh":1679.0,"source":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration"},"source_url":"https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration","publisher":"AEMO","fetched_at":"2026-10-11T21:49:33.169359+00:00","confidence":"high"}],"sample":true,"per_category_cap":100,"full_count":39087,"full_by_record_type":{"capacity_stat":32,"clearing_house_status":1,"feed_in_tariff":131,"grid_emissions":7,"grid_mix":7,"install_stat":10,"market_stat":12,"metric_series":12,"organisation":9103,"product":35,"project":29127,"rebate_scheme":13,"signal":337,"tender":189,"unit":71},"note":"A free sample — up to 100 rows per category. The complete dataset is on the paid plan; the open-source grid data (OpenElectricity, AEMO) is always free to view on the site."}